02/12/2008
Repeat Westlink Flood Warning Issued
A scale model is to be built of the contentious Broadway underpass as part of a plan to prevent a recurrence of severe flooding last summer which left the newly built multi-million pound underpass - part of the Westlink motorway - under 20 feet of water.
The £40,000 model, probably on a scale of one in 20 will be about 10 metres by 10 metres and will take six months to complete.
It is one of the official responses to a new report into the severe flooding, with a conclusion being reached that the underpass could in fact flood again.
Today, Northern Ireland Regional Development Minister, Conor Murphy, (pictured) welcomed the initial independent report into the flooding incident on 16 August 2008.
He said that, as well as the 'modelling exercise' to examine the drainage system, the consultants have recommended the raising of the banks, the introduction of a more robust early warning system with more liaison with the Met office and more regular inspections of the culverts.
Mr Murphy said that the independent investigation carried out by Amey Consulting found that the Clowney Water overtopped its banks at the inlet to a newly constructed culvert, resulting in the major flooding of the underpass.
He said that the Department will take forward the recommendations in partnership with the Design Build Finance and Operate (DBFO) Company for the M1/Westlink, and the Rivers Agency.
The Minister said: "I welcome the publication of this independent report into the events surrounding the flooding of the Broadway Underpass. Roads Service fully accepts the report's conclusions and a number of the recommendations have already been put in place.
"Firstly, the DBFO Company has already raised the banks of the open section of the Clowney Water which will provide additional capacity in the system and secondly they have implemented an improved monitoring system which will ensure that in the unlikely event of any future events, that the underpass will be closed quickly to ensure public safety.
"The report has highlighted that further work will be necessary as there are a number of complex contributory factors identified which may have impacted on the flooding," he said.
The independent report findings showed that the new drainage system did not perform in accordance with its required design capacity even though the flood was said to be a 'one in a 100 year flood event'.
The Independent Report is available on the Roads Service website: www.roadsni.gov.uk
(BMcC)
The £40,000 model, probably on a scale of one in 20 will be about 10 metres by 10 metres and will take six months to complete.
It is one of the official responses to a new report into the severe flooding, with a conclusion being reached that the underpass could in fact flood again.
Today, Northern Ireland Regional Development Minister, Conor Murphy, (pictured) welcomed the initial independent report into the flooding incident on 16 August 2008.
He said that, as well as the 'modelling exercise' to examine the drainage system, the consultants have recommended the raising of the banks, the introduction of a more robust early warning system with more liaison with the Met office and more regular inspections of the culverts.
Mr Murphy said that the independent investigation carried out by Amey Consulting found that the Clowney Water overtopped its banks at the inlet to a newly constructed culvert, resulting in the major flooding of the underpass.
He said that the Department will take forward the recommendations in partnership with the Design Build Finance and Operate (DBFO) Company for the M1/Westlink, and the Rivers Agency.
The Minister said: "I welcome the publication of this independent report into the events surrounding the flooding of the Broadway Underpass. Roads Service fully accepts the report's conclusions and a number of the recommendations have already been put in place.
"Firstly, the DBFO Company has already raised the banks of the open section of the Clowney Water which will provide additional capacity in the system and secondly they have implemented an improved monitoring system which will ensure that in the unlikely event of any future events, that the underpass will be closed quickly to ensure public safety.
"The report has highlighted that further work will be necessary as there are a number of complex contributory factors identified which may have impacted on the flooding," he said.
The independent report findings showed that the new drainage system did not perform in accordance with its required design capacity even though the flood was said to be a 'one in a 100 year flood event'.
The Independent Report is available on the Roads Service website: www.roadsni.gov.uk
(BMcC)
Related Northern Ireland News Stories
Click here for the latest headlines.
16 September 2024
O'Dowd Welcomes Progress Of Belfast Tidal Flood Alleviation Scheme
Infrastructure Minister John O'Dowd has welcomed the progress in the ongoing development of the Belfast Tidal Flood Alleviation Scheme, which aims to provide a long-term approach to tidal flood risk management for the city and help protect against the flood risk dangers presented by climate change.
O'Dowd Welcomes Progress Of Belfast Tidal Flood Alleviation Scheme
Infrastructure Minister John O'Dowd has welcomed the progress in the ongoing development of the Belfast Tidal Flood Alleviation Scheme, which aims to provide a long-term approach to tidal flood risk management for the city and help protect against the flood risk dangers presented by climate change.
23 August 2022
Strabane Flood Works Get Underway This Week
Infrastructure Minister John O'Dowd has returned to the Ballycolman Estate in Strabane as work gets underway on an Interim Flood Alleviation Scheme.
Strabane Flood Works Get Underway This Week
Infrastructure Minister John O'Dowd has returned to the Ballycolman Estate in Strabane as work gets underway on an Interim Flood Alleviation Scheme.
28 February 2022
Further Tree Clearances In Belfast Tidal Flood Alleviation Scheme
The Department of Infrastructure has announced the that further essential tree clearances will continue today ahead of bird nesting season as part of the next phase of the Belfast Tidal Flood Alleviation Scheme.
Further Tree Clearances In Belfast Tidal Flood Alleviation Scheme
The Department of Infrastructure has announced the that further essential tree clearances will continue today ahead of bird nesting season as part of the next phase of the Belfast Tidal Flood Alleviation Scheme.
10 February 2022
Natural Flood Management Scheme Launches At Belfast Castle
A new pilot natural flood management scheme, which includes a forest trail and outdoor educational space in the grounds of Belfast Castle, has been officially launched by Infrastructure Minister Nichola Mallon.
Natural Flood Management Scheme Launches At Belfast Castle
A new pilot natural flood management scheme, which includes a forest trail and outdoor educational space in the grounds of Belfast Castle, has been officially launched by Infrastructure Minister Nichola Mallon.
10 January 2022
Flood Risk Study For Omagh Town
Infrastructure Minister Nichola Mallon has announced a flood risk study for Omagh Town to determine if there are any viable options to reduce flood risk in the area. Minister Mallon said: "I am pleased to announce that my Department is currently engaging with our partner consultant to re-visit the most recent flood study for Omagh Town.
Flood Risk Study For Omagh Town
Infrastructure Minister Nichola Mallon has announced a flood risk study for Omagh Town to determine if there are any viable options to reduce flood risk in the area. Minister Mallon said: "I am pleased to announce that my Department is currently engaging with our partner consultant to re-visit the most recent flood study for Omagh Town.
-
Northern Ireland WeatherToday:A showery start with outbreaks most frequent north of Lough Neagh and through the morning, before dwindling during the afternoon as the northwest breezes ease and brighter spells of weak sunshine prosper. Maximum temperature 8 °C.Tonight:A dry night, save for a few light showers around the coasts, with prolonged clear spells and light winds bringing a frosty dawn for many in central and southern parts. Minimum temperature -3 °C.