24/10/2026 20:38:00 : INCIDENTS

Incident - Belfast - Knocbracken Rd - Closed, houston Rd, Belfast

Belfast - Road Users are advised that the Knockbracken Rd with the Jct with Houston Rd is currently Closed due to an ongoing incident. PSNI are in attendance. Please find an alternative route for your journey. (07:01)

20/10/2026 05:58:00 : INCIDENTS

Incident - Newry - A28 Armagh Road - Reopened, A28, A28 Armagh Road, Newry

Newry - Road users are advised that the A28 Armagh Road near junction with Church Road has reopened following an earlier incident. (23:13)

04/10/2026 16:04:00 : INCIDENTS

Incident - M1 East Bound , M1, Kilvergan Road, Craigavon

Road users are advised that the earlier traffic collision on the M1 East bound between J10 (Lough Rd) and J9 (Moira)has now been CLEARED. (14.30)

17/11/2026 18:00:00 : ROADWORKS

U3104, SALIA AVENUE, CARRICKFERGUS - Lane closure, U3104, SALIA AVENUE, CARRICKFERGUS

66 Salia AvenueRoadworks will operate from 08:00 on Mon 7th Dec 2026 to 18:00 on Mon 7th Dec 2026.
Reason: new gas connection

17/11/2026 18:00:00 : ROADWORKS

U3300, ISLANDTASSERTY ROAD, COLERAINE - Road closure, U3300, ISLANDTASSERTY ROAD, COLERAINE

Roadworks will operate from Wed 18th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Road will need to remain closed for duration of works as the valve is located in the middle of the Islandtasserty Road. Works planned to start 9:30am Wednesday and completed by 4pm FridayReason: Repair Leaking Valve
Diversion in place.

Alternative Route Via:
Diversion 1: C0535 GATESIDE ROAD, C0093 MAGHERABOY ROAD, U3303 LOGUESTOWN ROAD, A0029 ATLANTIC ROAD

17/11/2026 18:00:00 : ROADWORKS

C0542, LISNAMUCK ROAD, COLERAINE - Road closure, C0542, LISNAMUCK ROAD, COLERAINE

Roadworks will operate from 09:00 on Thu 19th Nov 2026 to 17:00 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: C0542 LISNAMUCK ROAD, B0207 MONEYBRANNON ROAD, B0066 ARDREAGH ROAD

17/11/2026 17:00:00 : ROADWORKS

A0005, OMAGH ROAD, BALLYGAWLEY - Lane closure, A0005, OMAGH ROAD, BALLYGAWLEY

Lane closureRoadworks will operate as follows:-
Sat 21st Nov - 07.00-17.00
Mon 23rd Nov - 09.30-16.30Reason: Surface retexturing

17/11/2026 17:00:00 : ROADWORKS

A0004, EDFIELD WAY, FIVEMILETOWN - Lane closure, A0004, CROSSOWEN ROAD, FIVEMILETOWN

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Routine maintenance for DFI mobile works. Crossowen Rd, Augher Rd, Main Street Clogher, Ballagh Rd, Main Street Clogher, Edfield Way, Colebrook Rd.

17/11/2026 17:00:00 : ROADWORKS

A0026, NEWBRIDGE ROAD, COLERAINE - Lane closure, A0026, NEWBRIDGE ROAD, COLERAINE

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Replace Manhole Cover and Frame

17/11/2026 17:00:00 : ROADWORKS

U4148, TAMLAGHT ROAD, RASHARKIN - Road closure, U4148, TAMLAGHT ROAD, RASHARKIN

Roadworks will operate from Sun 22nd Nov 2026 to Tue 1st Dec 2026.
Continuously from first day / last day on following times:-
8am Monday 22nd November to 5pm Tuesday 1st December Reason: Carriageway Excavation and Reconstruction
Diversion in place.

Alternative Route Via:
Diversion 1: B0096 TOWNHILL ROAD, U4146 PORTNA ROAD, U4148 TAMLAGHT ROAD

17/11/2026 17:00:00 : ROADWORKS BELFAST

U0812, CAMDEN STREET, BELFAST - Lane closure, U0812, CLAREMONT STREET, BELFAST

Footpath adjacent iREACH Roadworks will operate from Fri 13th Nov 2026 to Fri 26th Feb 2027.
Continuously from first day / last day on following times:-
Footpath closure only, with temporary pedestrian management - no delay to traffic expected Reason: Footpath replacement and improvement Works as part of IREACH

17/11/2026 17:00:00 : ROADWORKS

A0505, DRUM ROAD, COOKSTOWN - Lane closure, A0505, DRUM ROAD, COOKSTOWN

Traffic LightsRoadworks will operate as follows:-
Works will take place between 9:30am and 4pm. Digging will take 1 day to complete and reinstatement will take a couple of hours to complete the following day.Reason: Full-Service Water Connection (Road Crossing)

17/11/2026 17:00:00 : ROADWORKS BELFAST

A0020, UPPER NEWTOWNARDS ROAD, BELFAST - Lane closure, A0020, UPPER NEWTOWNARDS ROAD, BELFAST

UPPER NEWTOWNARDS ROAD, BELFASTRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: installation of BT cable

17/11/2026 17:00:00 : ROADWORKS

A0029, MAGHERA ROAD, TOBERMORE - Lane closure, A0029, MAGHERA ROAD, TOBERMORE

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIE Overhead Line Work

17/11/2026 17:00:00 : ROADWORKS

U3348, CREVOLEA ROAD, MULLAN - Road closure, U3348, CREVOLEA ROAD, MULLAN

Roadworks will operate from 09:00 on Tue 17th Nov 2026 to 17:00 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U3348 CREVOLEA ROAD, A0029 DRUMCROON ROAD, B0066 GREENHILL ROAD, B0066 ARDREAGH ROAD, C0542 LISNAMUCK ROAD

17/11/2026 16:00:00 : ROADWORKS BELFAST

U0605, DUNLAMBERT PARK, BELFAST - Lane closure, U0605, DUNLAMBERT PARK, BELFAST

Dunlambert ParkRoadworks will operate as follows:-
09:30-15:30Reason: NI Water combined storm drain repairs

17/11/2026 16:00:00 : ROADWORKS BELFAST

B0126, NORTH QUEEN STREET, BELFAST - Lane closure, B0126, NORTH QUEEN STREET, BELFAST

Lane Closure ( Temporary Traffic Lights)Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Mastic Ironwork repairs

17/11/2026 16:00:00 : ROADWORKS BELFAST

U0620, NORTH STREET, BELFAST - Lane closure, U0620, NORTH STREET, BELFAST

location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Replace Manhole Cover and Frame

17/11/2026 16:00:00 : ROADWORKS BELFAST

U0205, FORTWILLIAM PARK, BELFAST - Lane closure, U0205, FORTWILLIAM PARK, BELFAST

Fortwilliam Park Lane closureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: Combined Storm drain repairs

17/11/2026 15:00:00 : ROADWORKS

U1635, MAGHERALOUGH ROAD, IRVINESTOWN - 15 min Obstruction, U1635, MAGHERALOUGH ROAD, IRVINESTOWN

Roadworks will operate from 09:00 on Fri 20th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Work

17/11/2026 15:00:00 : ROADWORKS

C0668, BOTERA UPPER ROAD, OMAGH - Road closure, C0668, BOTERA UPPER ROAD, OMAGH

Roadworks will operate from 09:00 on Wed 18th Nov 2026 to 17:00 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: C0668 BOTERA UPPER ROAD, U1533 BOTERA ROAD, U1537 AGHEE ROAD, U1538 FALSKEY ROAD

17/11/2026 14:00:00 : ROADWORKS

A0005, BELTANY ROAD, MOUNTJOY - Lane closure, A0005, BELTANY ROAD, MOUNTJOY

Roadworks will operate as follows:-
Saturday lane closure Reason: Paddy McLaughlin Saturday work on a5 drainage

17/11/2026 14:00:00 : ROADWORKS

C0625, OLD MOUNTFIELD ROAD, OMAGH - Lane closure, C0625, OLD MOUNTFIELD ROAD, OMAGH

Area of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Excavate and reinstate joint bay in footpath and grass verge.

17/11/2026 13:00:00 : ROADWORKS

A0028, ARMAGH ROAD, NEWRY - Lane closure, A0028, ARMAGH ROAD, NEWRY

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: installation of new gas service to 8 latt villas with traffic lights as per chapter 8

17/11/2026 13:00:00 : ROADWORKS

A0002, KILLOWEN ROAD, ROSTREVOR - Lane closure, A0002, KILLOWEN ROAD, ROSTREVOR

Location of worksRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Install 2 x Extension Spindles

17/11/2026 13:00:00 : ROADWORKS

U5125, OUTLECKAN ROAD, NEWTOWNHAMILTON - Road closure, U5125, OUTLECKAN ROAD, NEWTOWNHAMILTON

Location of worksRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: NIW -Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: A0025 NEWRY ROAD, C0213 BALLYMOYER ROAD, C0204 CARRICKGALLOGLY ROAD, C0204 MONAGHAN ROAD, U5125 OUTLECKAN ROAD

17/11/2026 13:00:00 : ROADWORKS

U5108, DIVERNAGH ROAD, BESSBROOK - Road closure, U5108, DIVERNAGH ROAD, BESSBROOK

Location of worksRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: NIW -Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: U5108 DIVERNAGH ROAD, C0174 MCCLENAGHANS HILL, B0133 MAYTOWN ROAD, C0214 KINGSMILL ROAD

17/11/2026 13:00:00 : ROADWORKS

A0028, ARMAGH ROAD, NEWRY - Lane closure, A0028, ARMAGH ROAD, NEWRY

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 7th Dec 2026.
Reason: installation of new gas service to 8 latt villas as per chapter 8

17/11/2026 13:00:00 : ROADWORKS

C0365, GREENCASTLE ROAD, KILKEEL - Lane closure, C0365, GREENCASTLE ROAD, KILKEEL

Roadworks will operate from Sat 21st Nov 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
24 7 traffic lightsReason: New sewer pipe

17/11/2026 13:00:00 : ROADWORKS

U6146, LOWER KNOCKBARRAGH ROAD, ROSTREVOR - Road closure, U6146, LOWER KNOCKBARRAGH ROAD, ROSTREVOR

road closure Roadworks will operate from 08:00 on Tue 8th Dec 2026 to 18:00 on Tue 8th Dec 2026.
Reason: poling works
Diversion in place.

Alternative Route Via:
Diversion 1: C0329 UPPER KNOCKBARRAGH ROAD, C0329 GREENPARK ROAD, U6147 DRUMREAGH ROAD

17/11/2026 13:00:00 : ROADWORKS

B0090, LOW ROAD, ISLANDMAGEE - Lane closure, B0090, LOW ROAD, ISLANDMAGEE

B0090, LOW ROAD, ISLANDMAGEERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping & Cabling with possible minor excavation on the Fibrus Network

17/11/2026 13:00:00 : ROADWORKS

U6146, LOWER KNOCKBARRAGH ROAD, ROSTREVOR - Road closure, U6146, LOWER KNOCKBARRAGH ROAD, ROSTREVOR

road closure Roadworks will operate from 08:00 on Fri 8th Jan 2027 to 18:00 on Fri 8th Jan 2027.
Reason: poling works
Diversion in place.

Alternative Route Via:
Diversion 1: C0329 UPPER KNOCKBARRAGH ROAD, C0329 GREENPARK ROAD, U6147 DRUMREAGH ROAD

17/11/2026 13:00:00 : ROADWORKS

C0321, SANDBANK ROAD, HILLTOWN - Road closure, C0321, SANDBANK ROAD, HILLTOWN

Sandbank Rd closureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: Permanent reinstatement - extension to previous permit 2026 NMDW 82164
Diversion in place.

Alternative Route Via:
Diversion 1: C0321 SANDBANK ROAD, B0027 KILKEEL ROAD, B0008 CASTLEWELLAN ROAD, B0008 MAIN STREET, B0025 ROSTREVOR ROAD, U6127 LEITRIM ROAD, U6126 NEW LINE

17/11/2026 13:00:00 : ROADWORKS

B0090, MILLBAY ROAD, ISLANDMAGEE - Lane closure, B0090, MILLBAY ROAD, ISLANDMAGEE

B0090, MILLBAY ROAD, ISLANDMAGEERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping & Cabling with possible minor excavation on the Fibrus Network

17/11/2026 13:00:00 : ROADWORKS

U3004, LIBERTY ROAD, CARRICKFERGUS - Road closure, U3004, LIBERTY ROAD, CARRICKFERGUS

road closure Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0058 NEW LINE, B0090 MIDDLE ROAD, B0090 MARSHALLSTOWN ROAD, C0075 RED BRAE ROAD

17/11/2026 13:00:00 : ROADWORKS

C0035, COUNCILLORS ROAD, CARRICKFERGUS - Road closure, C0035, COUNCILLORS ROAD, CARRICKFERGUS

road closure Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: poling works
Diversion in place.

Alternative Route Via:
Diversion 1: U3003 WOODBURN ROAD, B0090 MIDDLE ROAD, B0058 NEW LINE

17/11/2026 13:00:00 : ROADWORKS

A0007, DOWNPATRICK STREET, CROSSGAR - Lane closure, A0007, DOWNPATRICK STREET, CROSSGAR

location of worksRoadworks will operate from Mon 11th Jan 2027 to Wed 13th Jan 2027.
Continuously from first day / last day on following times:-
09:30 11-01-2027 - 16:30 13-01-2027Reason: NIE works

17/11/2026 13:00:00 : ROADWORKS

B0090, BALLYLUMFORD ROAD, ISLANDMAGEE - Lane closure, B0090, BALLYLUMFORD ROAD, ISLANDMAGEE

B0090, BALLYLUMFORD ROAD, ISLANDMAGEERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping, possible minor excavation and cabling on the Fibrus Network

17/11/2026 13:00:00 : ROADWORKS

A0025, CAMLOUGH ROAD, NEWRY - Lane closure, A0025, CAMLOUGH ROAD, NEWRY

A25 Camlough Road towards Camlough, Lane 1Roadworks will operate from 23:00 on Mon 7th Dec 2026 to 06:00 on Tue 8th Dec 2026.
Reason: Lighting Outage Repair

17/11/2026 13:00:00 : ROADWORKS

U4075, HOLLOW ROAD, ISLANDMAGEE - Lane closure, U4075, HOLLOW ROAD, ISLANDMAGEE

U4075, HOLLOW ROAD, ISLANDMAGEERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping, possible minor excavation and cabling on the Fibrus Network

17/11/2026 13:00:00 : ROADWORKS

U4071, KNOWEHEAD ROAD, ISLANDMAGEE - Lane closure, U4071, KNOWEHEAD ROAD, ISLANDMAGEE

U4071, KNOWEHEAD ROADRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping, possible minor excavation and cabling on the Fibrus Network

17/11/2026 13:00:00 : ROADWORKS

B0048, DRUMRAGH AVENUE, OMAGH - Road closure, B0048, DRUMRAGH AVENUE, OMAGH

Crane lift needing to be done Roadworks will operate as follows:-
2100 - 0500Reason: Crane Lift needing to be done
Diversion in place.

Alternative Route Via:
Diversion 1: U3000 MARKET STREET, U3000 BRIDGE STREET, U3000 MOUNTJOY ROADDiversion 2: B0048 MOUNTJOY ROAD, C0625 OLD MOUNTFIELD ROAD, U1701 ARLESTON ROAD, A0505 KILLYCLOGHER ROAD, B0004 CAMPSIE ROAD, B0004 MARKET STREET

17/11/2026 13:00:00 : ROADWORKS

B0096, TOWNHILL ROAD, RASHARKIN - Lane closure, B0096, TOWNHILL ROAD, RASHARKIN

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Fri 4th Dec 2026.
Reason: To facilitate carriageway reconstruction works on Tamlaght Road

17/11/2026 13:00:00 : ROADWORKS

C0667, BROOKMOUNT ROAD, OMAGH - Road closure, C0667, BROOKMOUNT ROAD, OMAGH

Roadworks will operate from Sat 21st Nov 2026 to Sun 22nd Nov 2026.
Continuously from first day / last day on following times:-
NAReason: Installation of new gas mains
Diversion in place.

Alternative Route Via:
Diversion 1: U1539 TAMLAGHT ROAD, A0032 RAILWAY LAKE ROAD, A0032 JAMES STREET, A0032 DROMORE ROAD, A0032 CLANABOGAN ROAD, C0667 BROOKMOUNT ROAD, U0667 BROOKMOUNT ROAD

17/11/2026 13:00:00 : ROADWORKS

U1662, KEVLIN ROAD, OMAGH - Lane closure, U1662, KEVLIN ROAD, OMAGH

Roadworks will operate from 09:30 on Thu 12th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Surfacing of entrances and lay-by

17/11/2026 13:00:00 : ROADWORKS

U1662, KEVLIN ROAD, OMAGH - Road closure, U1662, KEVLIN ROAD, OMAGH

Kevlin Avenue Shops HRARoadworks will operate as follows:-
8pm to 6amReason: HRA Surfacing associated with SFAW2
Diversion in place.

Alternative Route Via:
Diversion 1: U3000 KEVLIN AVENUE, A0005 GREAT NORTHERN ROAD, B0048 DUBLIN ROAD, C0663 DUBLIN ROAD, C0663 BALLYNAHATTY ROAD, U1662 KEVLIN ROAD

17/11/2026 13:00:00 : ROADWORKS

A0032, JAMES STREET, OMAGH - Lane closure, A0032, JAMES STREET, OMAGH

JAMES STREET, OMAGHRoadworks will operate as follows:-
2000 - 0600Reason: installation of BT cable

17/11/2026 13:00:00 : ROADWORKS

A0505, BARONY ROAD, CREGGAN - Road closure, A0505, BARONY ROAD, CREGGAN

Roadworks will operate from 09:30 on Sun 22nd Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0505 BARONY ROAD, B0046 CREGGAN ROAD, B0004 MAIN STREET, B0004 TERMON ROAD, B0004 CAVANAKEERAN ROAD, B0004 EDENDOIT ROAD, B0004 TULLYREAVY ROAD, B0004 null, B0004 POMEROY ROAD, B0162 POMEROY ROAD, A0505 DRUM ROAD, A0505 Drum Road

17/11/2026 11:00:00 : ROADWORKS BELFAST

B0506, RAVENHILL ROAD, BELFAST - Lane closure, B0506, RAVENHILL ROAD, BELFAST

location of worksRoadworks will operate as follows:-
09:30 - 14:00Reason: NIW - Replace Manhole Cover and Frame

17/11/2026 11:00:00 : ROADWORKS BELFAST

A0024, ORMEAU ROAD, BELFAST - Lane closure, A0024, ORMEAU ROAD, BELFAST

location of worksRoadworks will operate as follows:-
19:00 - 22:00Reason: NIW -Replace Manhole Cover and Frame

17/11/2026 11:00:00 : ROADWORKS BELFAST

A0055, KNOCK ROAD, BELFAST - Lane closure, A0055, KNOCK ROAD, BELFAST

location of worksRoadworks will operate as follows:-
09:30 - 14:00Reason: NIW - Replace Manhole Cover and Frame

17/11/2026 11:00:00 : ROADWORKS BELFAST

U0820, LOOPLAND CRESCENT, BELFAST - Road closure, U0820, LOOPLAND CRESCENT, BELFAST

Road closedRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: NIW works- Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0820 GIBSON PARK GARDENS, U0820 LOOPLAND PARK, U0820 LOOPLAND ROAD, U0820 LOOPLAND CRESCENT

17/11/2026 11:00:00 : ROADWORKS BELFAST

A0055, MILLTOWN ROAD, BELFAST - Lane closure, A0055, MILLTOWN ROAD, BELFAST

Roadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Surfacing Works - approved road closure of Milltown Hill - 2026-BELS-83533Lane 1 city-bound closure required on Milltown road for work space

17/11/2026 11:00:00 : ROADWORKS BELFAST

U0119, MONTGOMERY ROAD, BELFAST - Lane closure, U0119, MONTGOMERY ROAD, BELFAST

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace or Relevel SV AV FH Box

17/11/2026 11:00:00 : ROADWORKS BELFAST

C0701, KNOCKBREDA ROAD, BELFAST - Lane closure, C0701, KNOCKBREDA ROAD, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: High Friction Surfacing

17/11/2026 11:00:00 : ROADWORKS BELFAST

U0826, CHEVIOT AVENUE, BELFAST - Road closure, U0826, CHEVIOT AVENUE, BELFAST

Road ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0826 IRWIN AVENUE, U0826 POMONA AVENUE, B0505 HOLYWOOD ROAD, U0826 CHEVIOT AVENUE

17/11/2026 10:00:00 : ROADWORKS BELFAST

A0006, ROYAL AVENUE, BELFAST - Lane closure, A0006, ROYAL AVENUE, BELFAST

Royal Avenue, Belfast Roadworks will operate as follows:-
05:00 to 12:00Reason: Building maintenance and repair

17/11/2026 10:00:00 : ROADWORKS BELFAST

A0052, CRUMLIN ROAD, BELFAST - Lane closure, A0052, CRUMLIN ROAD, BELFAST

location of worksRoadworks will operate from 09:30 on Thu 7th Jan 2027 to 16:30 on Thu 7th Jan 2027.
Reason: NIW - Full Service Water Connx

17/11/2026 10:00:00 : ROADWORKS BELFAST

A0055, KENNEDY WAY, BELFAST - Lane closure, A0055, KENNEDY WAY, BELFAST

location of worksRoadworks will operate as follows:-
19:00 - 22:00Reason: NIW - Replace Manhole Cover and Frame

17/11/2026 10:00:00 : ROADWORKS BELFAST

A0002, SHORE ROAD, BELFAST - Lane closure, A0002, SHORE ROAD, BELFAST

location of worksRoadworks will operate as follows:-
19:00 - 22:00Reason: NIW - Replace Manhole Cover and Frame

17/11/2026 07:00:00 : ROADWORKS

U0413, GLENCRAIG ROAD, GLENGORMLEY - Lane closure, U0413, GLENCRAIG ROAD, GLENGORMLEY

Lane ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Defective apparatus

17/11/2026 07:00:00 : ROADWORKS

U0401, TUDOR PARK, MALLUSK - Lane closure, U0401, TUDOR PARK, MALLUSK

Lane ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Defective apparatus

17/11/2026 07:00:00 : ROADWORKS

U3507, KINGS ROAD, COLERAINE - Lane closure, U3507, KINGS ROAD, COLERAINE

OS 9 Kings RoadRoadworks will operate from 09:00 on Tue 17th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: New Gas installation OS 9 Kings Road, Coleraine

16/11/2026 19:00:00 : ROADWORKS

U4013, BALLYMACORMICK ROAD, DROMORE CO DOWN - Road closure, U4013, BALLYMACORMICK ROAD, DROMORE CO DOWN

Roadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U4013 BALLYMACORMICK ROAD, U0432 BACKNAMULLAGH ROAD, B0002 BALLYNAHINCH ROAD, B0002 MOSSVALE ROAD, B0002 HILLSBOROUGH ROAD

16/11/2026 18:00:00 : ROADWORKS

U1103, CHURCH ROAD, HOLYWOOD - Lane closure, U1103, CHURCH ROAD, HOLYWOOD

lane closure Roadworks will operate from 08:00 on Tue 8th Dec 2026 to 18:00 on Tue 8th Dec 2026.
Reason: cabling - splicing works

16/11/2026 18:00:00 : ROADWORKS

U4181, SCRIGGAN ROAD, BANBRIDGE - Road closure, U4181, SCRIGGAN ROAD, BANBRIDGE

road closure Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0322 BALLELA ROAD, C0322 FEDNEY HILL ROAD

16/11/2026 18:00:00 : ROADWORKS

U4500, MILLTOWN AVENUE, BALLYMONEY - Road closure, U4500, MILLTOWN AVENUE, BALLYMONEY

road closure Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: blockage
Diversion in place.

Alternative Route Via:
Diversion 1: U4131 BALLYBRAKES ROAD, B0062 BANN ROAD

16/11/2026 18:00:00 : ROADWORKS

A0026, FROSSES ROAD, CLOUGHMILLS - Lane closure, A0026, FROSSES ROAD, CLOUGHMILLS

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Repair Leak in Verge

16/11/2026 17:00:00 : ROADWORKS

C0201, DUNDRUM ROAD, TASSAGH - Road closure, C0201, DUNDRUM ROAD, TASSAGH

DUNDRUM ROAD, KEADYRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: U8405 GRANEMORE ROAD, C0198 ANNVALE ROAD, U8411 ANNVALE ROAD

16/11/2026 17:00:00 : ROADWORKS

B0059, DOAGH ROAD, KELLS - Road closure, B0059, DOAGH ROAD, KELLS

Roadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Tue 22nd Dec 2026.
Reason: Carriageway resurfacing
Diversion in place.

Alternative Route Via:
Diversion 1: B0059 DOAGH ROAD, B0059 TULLY ROAD, A0036 MOORFIELDS ROAD, B0094 COLLIN ROAD, B0094 RASHEE ROAD, B0095 DOAGH ROAD, B0095 BALLYCLARE ROAD, B0059 BALLYMENA ROAD, B0059 MAIN STREET

16/11/2026 16:00:00 : ROADWORKS

U7439, ARMAGH - Lane closure, U7439, ARMAGH

Area of worksRoadworks will operate from 09:30 on Mon 11th Jan 2027 to 16:30 on Fri 22nd Jan 2027.
Reason: Carry out mains Tie in and extension

16/11/2026 16:00:00 : ROADWORKS

B0150, MIDDLE ROAD, ISLANDMAGEE - Lane closure, B0150, MIDDLE ROAD, ISLANDMAGEE

B0150, MIDDLE ROAD, ISLANDMAGEERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Test Rod & Roping and Grass Verge Dig and Cabling on the Fibrus Network

16/11/2026 15:00:00 : ROADWORKS

U8004, DUFFERIN AVENUE, BANGOR - Lane closure, U8004, DUFFERIN AVENUE, BANGOR

Lane ClosureRoadworks will operate as follows:-
07:00-12:00Reason: Defective apparatus

16/11/2026 15:00:00 : ROADWORKS

C0311, CARNEW ROAD, BANBRIDGE - Road closure, C0311, CARNEW ROAD, BANBRIDGE

Work LocationRoadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: Fibre Install to 49 Carnew Road
Diversion in place.

Alternative Route Via:
Diversion 1: U4164 HEADRIG ROAD, U4162 CORBALLY ROAD, U4163 CARNPARK ROAD

16/11/2026 15:00:00 : ROADWORKS BELFAST

M0003, M3 MOTORWAY (WEST BOUND), BELFAST - Lane closure, M0003, M3 MOTORWAY (WEST BOUND), BELFAST

M3 WB Lane 4Roadworks will operate from 23:00 on Tue 17th Nov 2026 to 06:00 on Wed 18th Nov 2026.
Reason: CAT 2.1 Barrier Repairs

16/11/2026 15:00:00 : ROADWORKS

U5149, BALLYMOGHAN ROAD, MAGHERAFELT - Road closure, U5149, BALLYMOGHAN ROAD, MAGHERAFELT

road closure Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: oh & ug cabling works
Diversion in place.

Alternative Route Via:
Diversion 1: A0031 MONEYMORE ROAD, A0031 MAGHERAFELT BYPASS, B0160 BALLYRONAN ROAD, B0181 BALLYMULLIGAN ROAD

16/11/2026 15:00:00 : ROADWORKS

U5009, KILLYGULLIB ROAD, SWATRAGH - Lane closure, U5009, KILLYGULLIB ROAD, SWATRAGH

Killygullib Road, Swatragh Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: New connection for customer

16/11/2026 15:00:00 : ROADWORKS

B0160, SHORE ROAD, BALLYRONAN - Lane closure, B0160, SHORE ROAD, BALLYRONAN

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Widen entrance to farmyard at no 80.

16/11/2026 15:00:00 : ROADWORKS

B0073, BATTERY ROAD, THE DIAMOND - Road closure, B0073, BATTERY ROAD, THE DIAMOND

Roadworks will operate as follows:-
6am to 6pm Sunday 22nd NovemberReason: Resurfacing works for DFI
Diversion in place.

Alternative Route Via:
Diversion 1: B0161 DRUMENNY ROAD, B0160 BALLINDERRY BRIDGE ROAD, B0160 URBAL ROAD, B0160 BALLYNARGAN ROAD, C0564 BALLYMAGUIRE ROAD, B0161 MULLANAHOE ROAD, U0619 KINRUSH ROADDiversion 2: U0616 MULLAN ROAD, U0617 KINTURK ROAD, U0617 ANNAGHMORE ROAD

16/11/2026 15:00:00 : ROADWORKS

U0745, FOUNTAIN ROAD, COOKSTOWN - Lane closure, U0745, FOUNTAIN ROAD, COOKSTOWN

os 10 fountain roadRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: installation of new gas service to 10 fountain road with traffic lights as per chapter 8

16/11/2026 14:00:00 : ROADWORKS

U0132, CLANBRASSIL ROAD, HOLYWOOD CULTRA - Lane closure, U0132, CLANBRASSIL ROAD, HOLYWOOD CULTRA

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Defective apparatus

16/11/2026 14:00:00 : ROADWORKS

B0025, KNOCKGORM ROAD, ANNACLONE - Lane closure, B0025, KNOCKGORM ROAD, ANNACLONE

Works LocaitonRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Fibre install to customers house, 59A Knockgorm Road

16/11/2026 14:00:00 : ROADWORKS BELFAST

A0501, GLEN ROAD, BELFAST - Lane closure, A0501, GLEN ROAD, BELFAST

location of worksRoadworks will operate from 09:30 on Tue 5th Jan 2027 to 16:30 on Tue 5th Jan 2027.
Reason: NIW - Replace Manhole Cover and Frame

16/11/2026 14:00:00 : ROADWORKS

U1404, HILL STREET, LURGAN - Lane closure, U1404, HILL STREET, LURGAN

Lane ClosureRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Installation of CIPP Liner

16/11/2026 14:00:00 : ROADWORKS BELFAST

U0619, DUNCRUE STREET, BELFAST - Lane closure, U0619, DUNCRUE STREET, BELFAST

location of worksRoadworks will operate from 09:30 on Thu 7th Jan 2027 to 16:30 on Thu 7th Jan 2027.
Reason: NIW - New PMA Pressure Monitor

16/11/2026 14:00:00 : ROADWORKS BELFAST

U0613, LEPPER STREET, BELFAST - Road closure, U0613, LEPPER STREET, BELFAST

Road ClosedRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: NIW works- Replace FH
Diversion in place.

Alternative Route Via:
Diversion 1: U0613 NEW LODGE ROAD, B0126 NORTH QUEEN STREET, U0613 SPAMOUNT STREET, U0613 LEPPER STREETDiversion 2:

16/11/2026 14:00:00 : ROADWORKS

U4046, DRUMBRONETH ROAD, DROMORE CO DOWN - Road closure, U4046, DRUMBRONETH ROAD, DROMORE CO DOWN

location of worksRoadworks will operate from Tue 5th Jan 2027 to Thu 4th Feb 2027.
Continuously from first day / last day on following times:-
08:00 05-01-2027 - 18:00 04-02-2027Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: U4044 BARRONSTOWN ROAD, U4043 BARBAN HILL, U4043 RAMPART STREET, C0310 MEETING STREET, C0310 POUND HILL, C0310 DIAMOND ROAD

16/11/2026 14:00:00 : ROADWORKS

B0047, PLUMBRIDGE ROAD, NEWTOWNSTEWART - Lane closure, B0047, PLUMBRIDGE ROAD, NEWTOWNSTEWART

Works LocationRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Fibre install to customers house, 51 Plumbridge Road

16/11/2026 14:00:00 : ROADWORKS

A5002, RAMOAN ROAD, BALLYCASTLE - Lane closure, A5002, RAMOAN ROAD, BALLYCASTLE

Roadworks will operate as follows:-
Daily 9.00am to 4.45pm Reason: Mastic Ironwork for IAN5 Contract

16/11/2026 14:00:00 : ROADWORKS

B0048, DUNCASTLE ROAD, NEWBUILD - Lane closure, B0048, DUNCASTLE ROAD, NEWBUILD

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIE Overhead Line Work

16/11/2026 14:00:00 : ROADWORKS

B0047, PLUMBRIDGE ROAD, NEWTOWNSTEWART - Lane closure, B0047, PLUMBRIDGE ROAD, NEWTOWNSTEWART

Works LocationRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to customers house, 40 Plumbridge Road

16/11/2026 14:00:00 : ROADWORKS

A1002, BUNCRANA ROAD, LONDONDERRY - Lane closure, A1002, BUNCRANA ROAD, LONDONDERRY

Roadworks will operate from Mon 23rd Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Works planned to start 8am Monday and completed by 4pm Friday. 2-Way Traffic Flow will be maintained at all times.Reason: Install New Meter and Strainer

16/11/2026 14:00:00 : ROADWORKS

A0029, WILLIAM STREET, COOKSTOWN - Road closure, A0029, WILLIAM STREET, COOKSTOWN

Roadworks will operate from Fri 20th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
17:00-22:00Reason: Cookstown Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: U0744 SWEEP ROAD, A0505 Drum Road, U0744 WESTLAND ROAD SOUTH, U0744 WESTLAND ROAD, U0744 MORGANS HILL ROAD

16/11/2026 14:00:00 : ROADWORKS

C0080, LAYDE ROAD, CUSHENDALL - Lane closure, C0080, LAYDE ROAD, CUSHENDALL

lane closure Roadworks will operate from 08:00 on Fri 4th Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: BT POLING WORKS

16/11/2026 14:00:00 : ROADWORKS

A0050, AUGHNACLOY ROAD, ANNACLONE - Lane closure, A0050, AUGHNACLOY ROAD, ANNACLONE

lane closure Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: BT POLING WORKS

16/11/2026 14:00:00 : ROADWORKS

B0096, TOWNHILL ROAD, RASHARKIN - Lane closure, B0096, TOWNHILL ROAD, RASHARKIN

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 306 Townhill Road

16/11/2026 14:00:00 : ROADWORKS

A5002, TROMRA ROAD, CUSHENDUN - Lane closure, A5002, TROMRA ROAD, CUSHENDUN

lane closure Roadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: BT POLING WORKS

16/11/2026 14:00:00 : ROADWORKS

A0029, DESERTMARTIN ROAD, TOBERMORE - Lane closure, A0029, DESERTMARTIN ROAD, TOBERMORE

A0029, DESERTMARTIN ROAD, TOBERMORERoadworks will operate from 09:30 on Sat 21st Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: Test, Rod & Roping & cabling on the Fibrus Network

16/11/2026 14:00:00 : ROADWORKS

B0016, GARRYDUFF ROAD, DUNLOY - Lane closure, B0016, GARRYDUFF ROAD, DUNLOY

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 136A Garryduff Road, Ballymoney

16/11/2026 14:00:00 : ROADWORKS

A0029, DUNGANNON ROAD, COOKSTOWN - Lane closure, A0029, DUNGANNON ROAD, COOKSTOWN

Roadworks will operate as follows:-
20:00 - 23:45Reason: Telecoms Works - Maintenance to phone mastTTM - 2-way Temporary traffic signals & x1 temporary pedestrian crossing

16/11/2026 14:00:00 : ROADWORKS BELFAST

A0057, BALLYROBIN ROAD, TEMPLEPATRICK - One Way closure, A0057, BALLYROBIN ROAD, TEMPLEPATRICK

Roadworks will operate from 23:00 on Wed 18th Nov 2026 to 06:00 on Thu 19th Nov 2026.
Reason: DFI Roads - Carriageway Patching
Diversion in place.

Alternative Route Via:
Diversion 1: A0006 BELFAST ROAD, A0006 BELMONT ROAD, A0006 DUBLIN ROAD, C0024 DUBLIN ROAD, C0024 BELFAST ROAD, U1114 ANTRIM ROAD, A0057 AIRPORT ROAD, A0057 BALLYROBIN ROAD

16/11/2026 14:00:00 : ROADWORKS

A0029, CHAPEL STREET, COOKSTOWN - Lane closure, A0029, CHAPEL STREET, COOKSTOWN

Roadworks will operate from Mon 23rd Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
We hope to maintain 2 way traffic flow here by narrowing the lanes on both sides of the carriageway keeping the minimum width required. Works planned to start 9:30am Monday and completed by 4pm Friday. Prompt response required due to loose manhole covers causing a loud noise.
The permit is approved on the strict condition that the TM Company MUST provide remote manually controlled traffic management (stop/go) to help manage queuing – operator controlling the traffic management should be located away from the line of traffic
(1) The permit is approved on the strict condition that all Traffic Management is removed from the A class road no later than 3pm on Friday.
Reason: Remove Manhole Lids and Steel Plate Over Chamber (Reoccurring Defects at these Chambers)

16/11/2026 14:00:00 : ROADWORKS

A0029, DUNGANNON ROAD, COOKSTOWN - Road closure, A0029, DUNGANNON ROAD, COOKSTOWN

DUNGANNON ROAD, COOKSTOWNRoadworks will operate as follows:-
agreed with Conal McKee 0100 - 1300Reason: installation NIE duct
Diversion in place.

Alternative Route Via:
Diversion 1: U0830 ANNAGH ROAD, C0622 SANDHOLES ROAD

16/11/2026 14:00:00 : ROADWORKS

A0505, DRUM ROAD, COOKSTOWN - Lane closure, A0505, DRUM ROAD, COOKSTOWN

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Work

16/11/2026 14:00:00 : ROADWORKS

A0034, MAIN STREET, LISNASKEA - Lane closure, A0034, MAIN STREET, LISNASKEA

MAIN STREET, LISNASKEARoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: renewal of BT frame and cover

16/11/2026 14:00:00 : ROADWORKS

A0029, DESERTMARTIN ROAD, TOBERMORE - Lane closure, A0029, DESERTMARTIN ROAD, TOBERMORE

Works LocationRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: To facilitate Northstone installing a right hand turn pocket to The Jungle

16/11/2026 13:00:00 : ROADWORKS

A0029, ARMAGH ROAD, KEADY - Lane closure, A0029, ARMAGH ROAD, KEADY

Lane ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Drainage Investigation

16/11/2026 13:00:00 : ROADWORKS

B0003, TASSAGH ROAD, KEADY - Lane closure, B0003, TASSAGH ROAD, KEADY

Lane ClosureRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Drainage Investigation

16/11/2026 13:00:00 : ROADWORKS

C0202, DRUMCONWELL ROAD, ARMAGH - Road closure, C0202, DRUMCONWELL ROAD, ARMAGH

ClosureRoadworks will operate from 08:00 on Tue 17th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: Flood Investigation
Diversion in place.

Alternative Route Via:
Diversion 1: C0201 ENNISLARE ROAD, A0029 KEADY ROAD

16/11/2026 13:00:00 : ROADWORKS

A0005, VICTORIA ROAD, BREADY - Lane closure, A0005, BELTANY ROAD, BREADY

A5 Drainage Works for DFIRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Drainage - Mobile Works

16/11/2026 13:00:00 : ROADWORKS

B0172, MOVILLA ROAD, NEWTOWNARDS - Lane closure, B0172, MOVILLA ROAD, NEWTOWNARDS

B0172, MOVILLA ROAD, NEWTOWNARDSRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping with possible minor excavation, cabling & poling on the Fibrus Network

16/11/2026 13:00:00 : ROADWORKS

U0232, BALLYSTOCKART ROAD, COMBER - Lane closure, U0232, BALLYSTOCKART ROAD, COMBER

U0232, BALLYSTOCKART ROAD, COMBERRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping & Cabling with possible minor excavation on the Fibrus Network

16/11/2026 13:00:00 : ROADWORKS

U0104, BALLYBARNES ROAD, NEWTOWNARDS - Lane closure, U0104, BALLYBARNES ROAD, NEWTOWNARDS

U0104, BALLYBARNES ROAD, NEWTOWNARDSRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping with possible minor excavation & cabling on the Fibrus Network

16/11/2026 13:00:00 : ROADWORKS BELFAST

A0501, FALLS ROAD, BELFAST - Lane closure, A0501, FALLS ROAD, BELFAST

Works LocationRoadworks will operate from 09:30 on Mon 4th Jan 2027 to 16:30 on Mon 4th Jan 2027.
Reason: Fibre install to customers house, 88 Falls Road

16/11/2026 13:00:00 : ROADWORKS

B0131, TEAGY ROAD, ARDRESS - Lane closure, B0131, TEAGY ROAD, ARDRESS

lane closure Roadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: FRAME AND COVER

16/11/2026 13:00:00 : ROADWORKS BELFAST

B0038, UPPER SPRINGFIELD ROAD, BELFAST - Lane closure, B0038, UPPER SPRINGFIELD ROAD, BELFAST

B0038, UPPER SPRINGFIELD ROAD, BELFASTRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

16/11/2026 13:00:00 : ROADWORKS BELFAST

U0606, SLIEVEMOYNE PARK, BELFAST - Road closure, U0606, SLIEVEMOYNE PARK, BELFAST

Roadworks will operate from 09:00 on Mon 7th Dec 2026 to 17:00 on Fri 18th Dec 2026.
Reason: NIW Lead Replacement
Diversion in place.

Alternative Route Via:
Diversion 1: U0606 SLIEVEMOYNE PARK, U0606 OLD CAVEHILL ROAD, A0006 ANTRIM ROAD

16/11/2026 13:00:00 : ROADWORKS

A0021, SOUTH STREET, NEWTOWNARDS - Road closure, A0021, SOUTH STREET, NEWTOWNARDS

Roadworks will operate as follows:-
07:00 - 13:00Reason: DFI Roads - Carriageway Patching
Diversion in place.

Alternative Route Via:
Diversion 1: U9020 COURT STREET, U9020 OLD CROSS STREET, A0020 CASTLE STREET, A0021 HIGH STREET, U9004 HIGH STREET, U9003 MILL STREET, U9002 MILL STREET, U9002 JOHN STREETDiversion 2: U9003 MILL STREET, U9004 GIBSONS LANE, A0020 REGENT STREET, A0020 FRANCES STREET, A0020 CASTLE PLACE, A0021 HIGH STREET

16/11/2026 13:00:00 : ROADWORKS BELFAST

U0632, ROCKDALE STREET, BELFAST - Lane closure, U0632, ROCKDALE STREET, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

16/11/2026 13:00:00 : ROADWORKS BELFAST

A0002, VICTORIA STREET, BELFAST - Lane closure, A0002, VICTORIA STREET, BELFAST

One lane closureRoadworks will operate as follows:-
One lane closure from the corner of AIB building along Victoria street to the end of the AIB building to allow the external gutter line to be cleared and cleaned from debris ect. Propose 8am-12:00Reason: External Gutter clean along AIB building

16/11/2026 13:00:00 : ROADWORKS BELFAST

A0002, MIDDLEPATH STREET, BELFAST - Lane closure, A0002, STATION STREET, BELFAST

Lane 1 closureRoadworks will operate as follows:-
4am to 11amReason: Window cleaning quay gate apartment

16/11/2026 13:00:00 : ROADWORKS BELFAST

A0002, VICTORIA STREET, BELFAST - Lane closure, A0002, ANN STREET, BELFAST

One lane closureRoadworks will operate as follows:-
One lane closure, 2 x lanes will still be in use. Proposed times for lane closure 8am-12:00Reason: External gutter clean around AIB building 92 Ann street Belfast

16/11/2026 13:00:00 : ROADWORKS

B0147, MAIN STREET, STRANOCUM - Lane closure, B0147, MAIN STREET, STRANOCUM

Plant 22no 8m column & Excavate FWRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Plant 22no 8m columns & Excavate FW

16/11/2026 13:00:00 : ROADWORKS

A0020, PORTAFERRY ROAD, NEWTOWNARDS - Lane closure, A0020, PORTAFERRY ROAD, NEWTOWNARDS

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house

16/11/2026 13:00:00 : ROADWORKS

U4517, ARMOUR AVENUE, BALLYMONEY - Lane closure, U4517, ARMOUR AVENUE, BALLYMONEY

Lane ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Tree Pruning

16/11/2026 13:00:00 : ROADWORKS

A5002, MAGHERY ROAD, BALLYCASTLE - Lane closure, A5002, MAGHERY ROAD, BALLYCASTLE

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 12 Maghery Road

16/11/2026 13:00:00 : ROADWORKS

A5002, MAGHERY ROAD, BALLYCASTLE - Lane closure, A5002, MAGHERY ROAD, BALLYCASTLE

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 12 Maghery Road

16/11/2026 13:00:00 : ROADWORKS

A0021, KILLINCHY STREET, COMBER - Lane closure, A0021, KILLINCHY STREET, COMBER

Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: new gas connection

16/11/2026 13:00:00 : ROADWORKS

A0021, BALLYGOWAN ROAD, BALLYGOWAN - Lane closure, A0021, BALLYGOWAN ROAD, BALLYGOWAN

A0021, BALLYGOWAN ROAD, BALLYGOWANRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Test Rod and Roping with Possible Minor Excavation on the Fibrus Network

16/11/2026 13:00:00 : ROADWORKS

A0023, MONEYREAGH ROAD, MONEYREAGH - Lane closure, A0023, MONEYREAGH ROAD, MONEYREAGH

A0023, MONEYREAGH ROAD, MONEYREAGHRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

16/11/2026 13:00:00 : ROADWORKS

U9001, SCRABO ROAD, NEWTOWNARDS - One Way closure, U9001, SCRABO ROAD, NEWTOWNARDS

ROAD CLOSURE Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0020 MESSINES ROAD, A0021 COMBER ROAD, U9002 CIRCULAR ROAD

16/11/2026 13:00:00 : ROADWORKS BELFAST

A0055, SPRINGFIELD ROAD, BELFAST - Lane closure, A0055, SPRINGFIELD ROAD, BELFAST

Lane ClosureRoadworks will operate as follows:-
08:00-12:00Reason: Defective apparatus

16/11/2026 13:00:00 : ROADWORKS

A0021, KILLINCHY STREET, COMBER - Lane closure, A0021, KILLINCHY STREET, COMBER

Roadworks will operate from 09:30 on Sun 22nd Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: NEW GAS CONNECTION

16/11/2026 13:00:00 : ROADWORKS

B0020, BRIDGE STREET, BANGOR - Road closure, B0020, BRIDGE STREET, BANGOR

Roadworks will operate as follows:-
17:00 - 18:30Reason: Christmas Event
Diversion in place.

Alternative Route Via:
Diversion 1: B0020 QUEEN'S PARADE, B0020 GRAY'S HILL, B0020 PRINCETOWN ROAD, U8004 DUFFERIN AVENUE, A0002 ABBEY STREET, U8034 CASTLE PARK AVENUE, U8034 CASTLE PARK ROAD, C0252 CASTLE STREET, U8024 PARK DRIVE, B0197 HAMILTON ROAD, B0021 DONAGHADEE ROAD, B0021 HIGH STREET

16/11/2026 13:00:00 : ROADWORKS

U8017, QUAY STREET, BANGOR - Road closure, U8017, QUAY STREET, BANGOR

Roadworks will operate as follows:-
06:00 - 21:00Reason: Christmas Event
Diversion in place.

Alternative Route Via:
Diversion 1: U8017 CROSBY STREET, U8017 HOLBORN AVENUE, B0021 HIGH STREET

16/11/2026 12:00:00 : ROADWORKS

U4404, CASTLE HILL, RATHFRILAND - Road closure, U4404, CASTLE HILL, RATHFRILAND

Roadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U4404 CASTLE STREET, A0025 MAIN STREET, B0007 DROMORE STREET

16/11/2026 12:00:00 : ROADWORKS

A2002, AGHANLOO ROAD, LIMAVADY - Lane closure, A2002, AGHANLOO ROAD, LIMAVADY

Roadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Full Service Water Connection (Road Crossing)

16/11/2026 12:00:00 : ROADWORKS

B0192, DRUMRANE ROAD, DUNGIVEN - Lane closure, B0192, DRUMRANE ROAD, DUNGIVEN

Works LocationRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Fibre install to customers house, 47 Drumrane Road

16/11/2026 12:00:00 : ROADWORKS BELFAST

U7108, LAGMORE GLEN, BELFAST - Road closure, U7108, LAGMORE DALE, BELFAST

Road ClosedRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Wed 23rd Dec 2026.
Reason: Resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: U7108 LAGMORE DALE, B0102 STEWARTSTOWN ROAD, U7108 LAGMORE AVENUE, U7108 MOUNT EAGLES ROAD

16/11/2026 11:00:00 : ROADWORKS

C0178, KILMACANTY ROAD, KILMORE CO ARMAGH - Road closure, C0178, KILMACANTY ROAD, KILMORE CO ARMAGH

Roadworks will operate from 09:00 on Mon 7th Dec 2026 to 17:00 on Mon 7th Dec 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0178 KILMACANTY ROAD, B0077 RED LION ROAD, B0131 KILMORE ROAD

16/11/2026 11:00:00 : ROADWORKS

C0323, SLIEVENABOLEY ROAD, DROMARA - Road closure, C0323, SLIEVENABOLEY ROAD, DROMARA

road closure Roadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0308 FINNIS ROAD, B0007 RATHFRILAND ROAD

16/11/2026 10:00:00 : ROADWORKS

B0045, EGLISH ROAD, EGLISH - Lane closure, B0045, EGLISH ROAD, EGLISH

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Carriageway Patching

13/11/2026 19:00:00 : ROADWORKS

U2061, BALLYDONNELLY ROAD, GRANGE - Road closure, U2061, BALLYDONNELLY ROAD, GRANGE

Roadworks will operate from 09:00 on Mon 7th Dec 2026 to 17:00 on Mon 7th Dec 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U2061 BALLYDONNELLY ROAD, B0018 ROGUERY ROAD, C0053 TAYLORSTOWN ROAD

13/11/2026 18:00:00 : ROADWORKS

U1280, UPPER BALLYDUGAN ROAD, BLEARY - Road closure, U1280, UPPER BALLYDUGAN ROAD, BLEARY

Road ClosedRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: NIW works- Pressure Monitor
Diversion in place.

Alternative Route Via:
Diversion 1: B0003 PLANTATION ROAD, U1417 CALVERTSTOWN ROAD, U1250 BLEARY ROADDiversion 2:

13/11/2026 18:00:00 : ROADWORKS

U3000, FESTIVAL PARK, OMAGH - Road closure, U3000, FESTIVAL PARK, OMAGH

Festival Park ResurfacingRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0663 TOWNVIEW AVENUE

13/11/2026 18:00:00 : ROADWORKS

U1365, DIVINY DRIVE, PORTADOWN - Lane closure, U1365, DIVINY DRIVE, PORTADOWN

Roadworks will operate from 08:00 on Sun 6th Dec 2026 to 18:00 on Sun 6th Dec 2026.
Reason: NIE Generator Parking

13/11/2026 18:00:00 : ROADWORKS

C0681, GARGADIS ROAD, TRILLICK - 15 min Obstruction, C0681, GARGADIS ROAD, TRILLICK

Roadworks will operate from 09:00 on Fri 20th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 18:00:00 : ROADWORKS

C0681, GARGADIS ROAD, TRILLICK - Road closure, C0681, GARGADIS ROAD, TRILLICK

Roadworks will operate from 09:00 on Fri 20th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U1635 MAGHERALOUGH ROAD, U1636 MAGHERALOUGH ROAD, B0046 KILSKEERY ROAD, B0046 MAIN STREET, C0681 GARGADIS ROAD

13/11/2026 18:00:00 : ROADWORKS

U1319, KILCOOTRY ROAD, FINTONA - Road closure, U1319, KILCOOTRY ROAD, FINTONA

KILCOOTRY ROAD, SESKINORERoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation of BT cable and complete jointing
Diversion in place.

Alternative Route Via:
Diversion 1: B0122 TATTYREAGH ROAD, B0046 CARNALEA ROAD

13/11/2026 18:00:00 : ROADWORKS

U1303, BLACKFORT ROAD, FINTONA - Road closure, U1303, BLACKFORT ROAD, FINTONA

BLACKFORT ROAD, FINTONARoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation of BT cable and complete jointing
Diversion in place.

Alternative Route Via:
Diversion 1: U1317 TULLYVALLY ROAD, B0122 TATTYREAGH ROAD

13/11/2026 18:00:00 : ROADWORKS

B0122, TATTYREAGH ROAD, TATTYREAGH - Lane closure, B0122, TATTYREAGH ROAD, TATTYREAGH

TATTYREAGH ROAD, TATTYREAGHRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: installation of BT cable and jointing

13/11/2026 18:00:00 : ROADWORKS

U1549, CROCKAVARRED ROAD, OMAGH - Road closure, U1549, CROCKAVARRED ROAD, OMAGH

road closure Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: BT POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0004 DRUMLISH ROAD, U1549 ARDFORT ROAD

13/11/2026 18:00:00 : ROADWORKS

U1635, TIEVEMORE ROAD, IRVINESTOWN - 15 min Obstruction, U1635, TIEVEMORE ROAD, IRVINESTOWN

Roadworks will operate from 09:00 on Thu 19th Nov 2026 to 17:00 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 18:00:00 : ROADWORKS

C0628, SPRING ROAD, MOUNTFIELD - Road closure, C0628, SPRING ROAD, MOUNTFIELD

Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0626 LOUGHMACRORY ROAD, A0505 KILLYCLOGHER ROAD, A0505 null, C0625 RACOLPA ROAD, B0004 DRUMNAKILLY ROAD, C0628 SPRING ROAD

13/11/2026 18:00:00 : ROADWORKS

U1701, BALLINAMULLAN ROAD, OMAGH - Lane closure, U1701, BALLINAMULLAN ROAD, OMAGH

Area of worksRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Excavate and reinstate joint bay in FW and lay LV cable to new meter position.

13/11/2026 16:56:00 : ROADWORKS BELFAST

C0263, BELFAST ROAD, NEWTOWNARDS - Lane closure, C0263, BELFAST ROAD, NEWTOWNARDS

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: For Access of works vehicles into Kiltonga Nature ReserveTTM - 2-way Temporary traffic signals

13/11/2026 16:56:00 : ROADWORKS

B0028, MOY ROAD, PORTADOWN - Lane closure, B0028, MOY ROAD, PORTADOWN

Works LocationRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Fibre install to customers house, 18A Moy Road
Diversion in place.

Alternative Route Via:
Diversion 2:

13/11/2026 16:56:00 : ROADWORKS

A0026, CRANKILL ROAD, CLOUGH CO ANTRIM - Lane closure, A0026, CRANKILL ROAD, CLOUGH CO ANTRIM

Crankill Rd Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Patching works

13/11/2026 16:56:00 : ROADWORKS

C0220, JONESBOROUGH VILLAGE, JONESBOROUGH - Lane closure, C0220, JONESBOROUGH VILLAGE, JONESBOROUGH

Lane ClosureRoadworks will operate from Mon 14th Dec 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Continuous from 9.30am on Monday 14th to 4.30pm on Friday 20th. Reason: Replacement of existing sewer manhole

13/11/2026 16:56:00 : ROADWORKS

U5015, KILREA ROAD, JERRETSPASS - Road closure, U5015, KILREA ROAD, JERRETSPASS

road closure Roadworks will operate from 08:00 on Thu 10th Dec 2026 to 18:00 on Thu 10th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U5016 KNOCKDUFF ROAD

13/11/2026 16:56:00 : ROADWORKS

U0243, KILLYNETHER ROAD, NEWTOWNARDS - Road closure, U0243, KILLYNETHER ROAD, NEWTOWNARDS

Road ClosureRoadworks will operate from 09:30 on Tue 5th Jan 2027 to 16:30 on Tue 5th Jan 2027.
Reason: New PMA Pressure Monitor
Diversion in place.

Alternative Route Via:
Diversion 1: U0243 KILLYNETHER ROAD, U0243 SCRABO ROAD, U0245 BALLYALTON ROAD, C0266 BALLYRAINEY ROAD

13/11/2026 16:56:00 : ROADWORKS

U5388, STATION ROAD, JONESBOROUGH - Road closure, U5388, STATION ROAD, JONESBOROUGH

Roadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Thu 26th Nov 2026.
Reason: Parapet repair works to railway bridge
Diversion in place.

Alternative Route Via:
Diversion 1: U5387 FOUGHILLETRA ROAD, C0220 FINEGANS ROAD, C0220 AGHADAVOYLE ROAD

13/11/2026 16:56:00 : ROADWORKS

B0010, SCARVA ROAD, BANBRIDGE - Lane closure, B0010, SCARVA ROAD, BANBRIDGE

Works LocationRoadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: Fibre install to customers house, 161 Scarva Road

13/11/2026 16:56:00 : ROADWORKS

B0027, MOYAD ROAD, KILKEEL - Lane closure, B0027, MOYAD ROAD, KILKEEL

Works LocationRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to customers house, 6 Dougans Road

13/11/2026 16:56:00 : ROADWORKS

B0149, BALLYWILLIN ROAD, BELTOY - Lane closure, B0149, BALLYWILLIN ROAD, BELTOY

location of worksRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: NIW - Replace or Relevel SV AV FH Box

13/11/2026 16:56:00 : ROADWORKS

U0336, BALLYGOSKIN ROAD, DERRYBOYE - Road closure, U0336, BALLYGOSKIN ROAD, DERRYBOYE

road closure Roadworks will operate from 08:00 on Mon 7th Dec 2026 to 18:00 on Mon 7th Dec 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U0328 DERRYBOY ROAD, U0331 CLAY ROAD

13/11/2026 16:56:00 : ROADWORKS

U4002, BRANCH ROAD, DRAINS BAY - Lane closure, U4002, OLD GLENARM ROAD, DRAINS BAY

location of worksRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: NIW works

13/11/2026 16:56:00 : ROADWORKS

U0421, CIRCULAR ROAD, NEWTOWNABBEY - Lane closure, U0421, CIRCULAR ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: Leak on supply

13/11/2026 16:56:00 : ROADWORKS

U1025, DERRYASH ROAD, AGHALEE - Road closure, U1025, DERRYASH ROAD, AGHALEE

ROAD CLSOURE Roadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: OH & UG CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U1005 DIAMOND LANE, U1006 ORKEN LANE, U1007 THE HOLLOW ROAD

13/11/2026 16:56:00 : ROADWORKS

C0007, MAGHABERRY ROAD, MAGHABERRY - Lane closure, C0007, MAGHABERRY ROAD, MAGHABERRY

C0007, MAGHABERRY ROAD, MAGHABERRYRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 16:56:00 : ROADWORKS

C0364, BALLYNABRAGGET ROAD, WARINGSTOWN - Road closure, C0364, BALLYNABRAGGET ROAD, WARINGSTOWN

Road ClosureRoadworks will operate from 09:30 on Thu 10th Dec 2026 to 16:30 on Thu 10th Dec 2026.
Reason: Fibre install to customers house, 68 Ballynabragget Road
Diversion in place.

Alternative Route Via:
Diversion 1: U1311 PAT'S TURN, U1312 BALLYLOUGH ROAD, A0026 BANBRIDGE ROAD

13/11/2026 16:56:00 : ROADWORKS

U1023, GRANTS LANE, AGHALEE - Road closure, U1023, GRANTS LANE, AGHALEE

road closure Roadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: OH & UG CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0010 BRANKINSTOWN ROAD, B0156 DERRYMORE ROAD, U1022 MOSS ROAD

13/11/2026 16:56:00 : ROADWORKS

U0421, CIRCULAR ROAD, NEWTOWNABBEY - Lane closure, U0421, CIRCULAR ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: NIW Works - Leak on supply

13/11/2026 16:56:00 : ROADWORKS

C0010, BRANKINSTOWN ROAD, AGHALEE - Road closure, C0010, BRANKINSTOWN ROAD, AGHALEE

road closure Roadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: oh & ug cabling works
Diversion in place.

Alternative Route Via:
Diversion 1: B0156 DERRYOLA BRIDGE ROAD, U1002 BOGHEAD BRIDGE ROAD, U1024 FEATHERBED ROAD

13/11/2026 16:56:00 : ROADWORKS

C0072, OLD GLENARM ROAD, LARNE - Lane closure, C0072, OLD GLENARM ROAD, LARNE

Old Glenarm RoadRoadworks will operate from 09:00 on Tue 1st Dec 2026 to 17:00 on Fri 4th Dec 2026.
Reason: Carriageway works in relation to new cemetery

13/11/2026 16:56:00 : ROADWORKS

U0349, SHANES ROAD, CROSSGAR - Road closure, U0349, SHANES ROAD, CROSSGAR

Work LocationRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to 19 Shanes Road
Diversion in place.

Alternative Route Via:
Diversion 1: B0007 BALLYTRIM ROAD, U0350 TULLYKIN ROAD, U0348 TULLYKIN LOUGH ROAD

13/11/2026 16:56:00 : ROADWORKS

U1185, GLENCROFT, MAGHERALIN - Lane closure, U1185, GLENCROFT, MAGHERALIN

Roadworks will operate from Fri 11th Dec 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 31 glencroft as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U7013, GREENFIELD CLOSE, ARMAGH - Lane closure, U7013, GREENFIELD CLOSE, ARMAGH

Roadworks will operate from Thu 10th Dec 2026 to Thu 17th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 4 greenfield close as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

A0023, BALLYGOWAN ROAD, CROSSNACREEVY - Lane closure, A0023, BALLYGOWAN ROAD, CROSSNACREEVY

Lane closureRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: High Friction Surfacing

13/11/2026 16:56:00 : ROADWORKS

U1006, OLD CHURCH LANE, AGHALEE - Road closure, U1006, OLD CHURCH LANE, AGHALEE

OLD CHURCH LANE, MOIRARoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: renewal of NIE poles and NIE cable
Diversion in place.

Alternative Route Via:
Diversion 1: C0007 SOLDIERSTOWN ROAD, B0105 SOLDIERSTOWN ROAD, B0012 BALLINDERRY ROAD

13/11/2026 16:56:00 : ROADWORKS

U1390, GARRYMORE, CRAIGAVON - Lane closure, U1390, GARRYMORE, CRAIGAVON

Roadworks will operate from Wed 9th Dec 2026 to Wed 16th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 327 Garrymore as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

C0266, BALLYRAINEY ROAD, COMBER - Road closure, C0266, BALLYRAINEY ROAD, COMBER

Road ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Meter Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0266 BALLYRAINEY ROAD, A0022 COMBER ROAD, U0140 MILLMOUNT ROAD, U0140 GREENGRAVES ROAD, U0240 GREENGRAVES ROAD, A0020 KEMPE STONES ROAD

13/11/2026 16:56:00 : ROADWORKS

U1368, ORCHARD PARK, PORTADOWN - Lane closure, U1368, ORCHARD PARK, PORTADOWN

Roadworks will operate from Tue 8th Dec 2026 to Tue 15th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 9 orchard park as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

A0003, LURGAN ROAD, MOIRA - Lane closure, A0003, LURGAN ROAD, MOIRA

Works LocationRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Fibre install to customers house, 68 Lurgan Road

13/11/2026 16:56:00 : ROADWORKS

U1353, CORCRAIN DRIVE, PORTADOWN - Lane closure, U1353, CORCRAIN DRIVE, PORTADOWN

Roadworks will operate from Tue 8th Dec 2026 to Tue 15th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 65 Corcrain drive as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U0049, VICTORIA ROAD, BALLYCLARE - Lane closure, U0049, VICTORIA ROAD, BALLYCLARE

Roadworks will operate as follows:-
20:30 on 21st to 10:00 on 22ndReason: NIE Generator Parking

13/11/2026 16:56:00 : ROADWORKS

A0024, NEWCASTLE ROAD, SEAFORDE - Lane closure, A0024, NEWCASTLE ROAD, SEAFORDE

Roadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Retexturing WorksTTM - Stop-Go

13/11/2026 16:56:00 : ROADWORKS

A0025, BALLYDUGAN ROAD, DOWNPATRICK - Lane closure, A0025, BALLYDUGAN ROAD, DOWNPATRICK

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Retexturing WorksTTM - Stop-Go

13/11/2026 16:56:00 : ROADWORKS

A0050, BANBRIDGE ROAD, GILFORD - Lane closure, A0050, BANBRIDGE ROAD, GILFORD

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Retexturing WorksTTM - Stop-Go

13/11/2026 16:56:00 : ROADWORKS

A0003, NORTHWAY, PORTADOWN - Lane closure, A0003, NORTHWAY, PORTADOWN

Roadworks will operate as follows:-
22:00-06:00Reason: Retexturing Works TTM - Stop-Go YUNEX Required

13/11/2026 16:56:00 : ROADWORKS

A0003, PORTADOWN ROAD, RICHHILL - Lane closure, A0003, PORTADOWN ROAD, RICHHILL

Roadworks will operate as follows:-
21:00-06:00Reason: Retexturing Works TTM - Stop-Go

13/11/2026 16:56:00 : ROADWORKS

A0003, PORTADOWN ROAD, ARMAGH - Lane closure, A0003, PORTADOWN ROAD, ARMAGH

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Retexturing Works TTM - Stop-Go

13/11/2026 16:56:00 : ROADWORKS

B0002, SEAGOE ROAD, PORTADOWN - Lane closure, B0002, SEAGOE ROAD, PORTADOWN

Roadworks will operate as follows:-
08:00 - 14:00Reason: Manhole Lid Repair

13/11/2026 16:56:00 : ROADWORKS

A0027, BRIDGE STREET, PORTADOWN - Lane closure, A0027, BRIDGE STREET, PORTADOWN

Roadworks will operate as follows:-
07:00 - 12:00Reason: Manhole Lid Repairs

13/11/2026 16:56:00 : ROADWORKS

C0368, GREEN ROAD, BANGOR - Lane closure, C0368, GREEN ROAD, BANGOR

Lane ClosureRoadworks will operate from 09:30 on Mon 14th Dec 2026 to 16:30 on Mon 14th Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0823, CLANDEBOYE DRIVE, BELFAST - Lane closure, U0823, CLANDEBOYE DRIVE, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U8103, ARDMORE PARK, HOLYWOOD - Lane closure, U8103, ARDMORE PARK, HOLYWOOD

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

C0281, SAUL ROAD, DOWNPATRICK - Lane closure, C0281, SAUL ROAD, DOWNPATRICK

location of worksRoadworks will operate from Mon 4th Jan 2027 to Sun 31st Jan 2027.
Continuously from first day / last day on following times:-
09:30 04-01-2027 - 16:30 31-01-2027Reason: NIE works

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0505, ELSMERE MANOR, BELFAST - Lane closure, U0505, ELSMERE MANOR, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U9015, UPPER MOVILLA STREET, NEWTOWNARDS - Lane closure, U9015, UPPER MOVILLA STREET, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U7029, IVAN STREET, LISBURN - Lane closure, U7029, IVAN STREET, LISBURN

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U9012, VICTORIA GARDENS, NEWTOWNARDS - Lane closure, U9012, VICTORIA GARDENS, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U9013, BEVERLEY WALK, NEWTOWNARDS - Lane closure, U9013, BEVERLEY WALK, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U9012, VICTORIA CLOSE, NEWTOWNARDS - Lane closure, U9012, VICTORIA CLOSE, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U9016, DRUMMOND PARK, NEWTOWNARDS - Lane closure, U9016, DRUMMOND PARK, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

U0417, BALLYCRAIGY PARK, MOSSLEY - Lane closure, U0417, BALLYCRAIGY PARK, MOSSLEY

Lane ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Defective apparatus

13/11/2026 16:56:00 : ROADWORKS

B0131, DERRYCOOSE ROAD, ARDRESS - Lane closure, B0131, DERRYCOOSE ROAD, ARDRESS

Works LocationRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to customers house, 57A Derrycoose Road

13/11/2026 16:56:00 : ROADWORKS

A0045, MILLTOWN, DUNGANNON - One Way closure, A0045, MILLTOWN, DUNGANNON

Roadworks will operate as follows:-
19:00-06:00Reason: Installation of new gas main
Diversion in place.

Alternative Route Via:
Diversion 1: A0029 RANFURLY ROAD, A0029 CIRCULAR ROAD, U7514 OAKLAND AVENUE, U7514 QUARRY LANE, B0043 NEWELL ROAD, A0045 BALLYGAWLEY ROAD, A0045 RAILWAY ROAD, A0045 MILLTOWN

13/11/2026 16:56:00 : ROADWORKS

B0002, DERRYMACASH ROAD, DERRYMACASH - Lane closure, B0002, DERRYMACASH ROAD, DERRYMACASH

Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: NIE Overhead Line Work

13/11/2026 16:56:00 : ROADWORKS

U7536, CHURCH STREET, DUNGANNON - Road closure, U7536, CHURCH STREET, DUNGANNON

Roadworks will operate as follows:-
19:00-06:00Reason: Installation of new gas mains
Diversion in place.

Alternative Route Via:
Diversion 1: U7531 PARK ROAD, U7533 VICTORIA ROAD, A0045 RAILWAY ROAD, U7502 RAILWAY ROAD, U7541 WILLIAM STREETDiversion 2: U7512 THOMAS STREET, U7512 GREERS ROAD

13/11/2026 16:56:00 : ROADWORKS

C0343, POYNTZPASS ROAD, LOUGHBRICKLAND - Lane closure, C0343, POYNTZPASS ROAD, LOUGHBRICKLAND

C0343 POYNTZPASS RD Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: 2 way lights needed for cabling works to be carried out

13/11/2026 16:56:00 : ROADWORKS

B0003, GROVEHILL ROAD, LOUGHBRICKLAND - Lane closure, B0003, GROVEHILL ROAD, LOUGHBRICKLAND

b0003 GROVEHILL RD Roadworks will operate from 09:30 on Fri 13th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: cabling and splicing works to be carried out

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0193, MANSE ROAD, BELFAST - Lane closure, U0193, MANSE ROAD, BELFAST

Lane CLosureRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: Re-setting iron work after full width reinstatement - extension to existing permit 2026 LICA 82644

13/11/2026 16:56:00 : ROADWORKS

A0025, NEWRY ROAD, RATHFRILAND - Lane closure, A0025, NEWRY ROAD, RATHFRILAND

Works LocationRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to customers house, 76 Newry Road

13/11/2026 16:56:00 : ROADWORKS

B0010, SCARVA ROAD, BANBRIDGE - Lane closure, B0010, SCARVA ROAD, BANBRIDGE

Works LocationRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Fibre install to customers house, 161 Scarva Road

13/11/2026 16:56:00 : ROADWORKS

B0078, MARKETHILL ROAD, MILLTOWN - Lane closure, B0078, MARKETHILL ROAD, MILLTOWN

Works LocationRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to customers house, 193 Markethill Road

13/11/2026 16:56:00 : ROADWORKS

C0295, MIDDLE ROAD, SAINTFIELD - Road closure, C0295, MIDDLE ROAD, SAINTFIELD

Road ClosureRoadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: Fibre install to customers house, 110 Middle Road
Diversion in place.

Alternative Route Via:
Diversion 1: C0295 MIDDLE ROAD, A0021 BALLYNAHINCH ROAD, U6300 FAIR GREEN TERRACE, B0006 LISBURN ROAD, U0181 LISBANE ROAD, U0182 LAURELBANK ROAD

13/11/2026 16:56:00 : ROADWORKS

U6009, DRUMLIN PARK, DOWNPATRICK - Lane closure, U6009, DRUMLIN PARK, DOWNPATRICK

Lane ClosureRoadworks will operate from Mon 23rd Nov 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
Continuous 9.30am on Monday to 4.30pm on Friday. All lanes open over weekend periods. Reason: Repairs to 3nr manholes and 1 length of sewer

13/11/2026 16:56:00 : ROADWORKS

A2002, WINDYHILL ROAD, LIMAVADY - Lane closure, A2002, WINDYHILL ROAD, LIMAVADY

lane closureRoadworks will operate from 08:00 on Fri 4th Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: BLOCKAGE

13/11/2026 16:56:00 : ROADWORKS

U1120, ROSSDOWNEY ROAD, LONDONDERRY - Lane closure, U1120, ROSSDOWNEY ROAD, LONDONDERRY

U1120, ROSSDOWNEY ROAD, LONDONDERRYRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Civils, Poles & Cabling on the Fibrus Network

13/11/2026 16:56:00 : ROADWORKS

U4123, ARDTANAGH ROAD, DROMARA - Road closure, U4123, ARDTANAGH ROAD, DROMARA

ROAD CLOSURE Roadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: NIE CIVLS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0007 RATHFRILAND ROAD, C0328 DROMORE STREET, C0328 BANBRIDGE ROAD

13/11/2026 16:56:00 : ROADWORKS

C0503, ARDLOUGH ROAD, LONDONDERRY - Lane closure, C0503, ARDLOUGH ROAD, LONDONDERRY

C0503, ARDLOUGH ROAD, LONDONDERRYRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Civils, Poles & Cabling on the Fibrus Network

13/11/2026 16:56:00 : ROADWORKS

U2513, TAYLOR PARK, LIMAVADY - Lane closure, U2513, TAYLOR PARK, LIMAVADY

lane closreRoadworks will operate from 08:00 on Mon 7th Dec 2026 to 18:00 on Mon 7th Dec 2026.
Reason: BT PILING WORKS

13/11/2026 16:56:00 : ROADWORKS

U1361, LAKELANDS, CRAIGAVON - Lane closure, U1361, LAKELANDS, CRAIGAVON

Roadworks will operate from Wed 9th Dec 2026 to Wed 16th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 131 lakelands as per chapter 8

13/11/2026 16:56:00 : ROADWORKS BELFAST

B0505, BEERSBRIDGE ROAD, BELFAST - Lane closure, B0505, BEERSBRIDGE ROAD, BELFAST

location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - New PMA Pressure Monitor

13/11/2026 16:56:00 : ROADWORKS

U2088, GROVE ROAD, KELLS - Road closure, U2088, GROVE ROAD, KELLS

road closureRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: poling works
Diversion in place.

Alternative Route Via:
Diversion 1: C0046 LIMINARY ROAD, U2079 BALLYCOWAN ROAD, B0098 SHANKBRIDGE ROAD

13/11/2026 16:56:00 : ROADWORKS

U7012, LINSEY'S HEIGHTS, ARMAGH - Lane closure, U7012, LINSEY'S HEIGHTS, ARMAGH

Roadworks will operate from Mon 7th Dec 2026 to Mon 14th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 3 linsey heights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U6221, AUGHRIM ROAD, KILKEEL - Road closure, U6221, AUGHRIM ROAD, KILKEEL

Road ClosureRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Fibre install to customers house, 38 Aughrim Road
Diversion in place.

Alternative Route Via:
Diversion 1: C0318 TULLYFRAME ROAD, U6222 BALLYMAGEOGH ROAD

13/11/2026 16:56:00 : ROADWORKS

U3140, WINDSOR CRESCENT, WHITEHEAD - Lane closure, U3140, WINDSOR CRESCENT, WHITEHEAD

Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NIE Substation Replacement

13/11/2026 16:56:00 : ROADWORKS

C0334, DERRYLECKAGH ROAD, NEWRY - Road closure, C0334, DERRYLECKAGH ROAD, NEWRY

road closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0008 HILLTOWN ROAD, B0007 BRIDGE ROAD, B0007 CHAPEL HILL, B0008 NEWRY ROAD

13/11/2026 16:56:00 : ROADWORKS

U9008, TULLYNAGARDY AVENUE, NEWTOWNARDS - Lane closure, U9008, TULLYNAGARDY LANE, NEWTOWNARDS

location of worksRoadworks will operate from 09:30 on Wed 6th Jan 2027 to 16:30 on Wed 6th Jan 2027.
Reason: NIW - New PMA Pressure Monitor

13/11/2026 16:56:00 : ROADWORKS

B0064, SPRINGMOUNT ROAD, CLOUGH CO ANTRIM - Lane closure, B0064, SPRINGMOUNT ROAD, CLOUGH CO ANTRIM

Works LocationRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Fibre install to customers house, 24 Springmount Road

13/11/2026 16:56:00 : ROADWORKS

C0278, LOUGHINISLAND ROAD, LOUGHINISLAND - Lane closure, C0278, LOUGHINISLAND ROAD, LOUGHINISLAND

Roadworks will operate from 08:00 on Sun 29th Nov 2026 to 18:00 on Sun 29th Nov 2026.
Reason: NIE Generator Parking

13/11/2026 16:56:00 : ROADWORKS

U1368, BROOK CLOSE, PORTADOWN - Lane closure, U1368, BROOK CLOSE, PORTADOWN

Roadworks will operate from Thu 3rd Dec 2026 to Thu 10th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 16 brook close as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

C0278, NEWCASTLE ROAD, LOUGHINISLAND - Road closure, C0278, NEWCASTLE ROAD, LOUGHINISLAND

Roadworks will operate from 08:00 on Sun 29th Nov 2026 to 18:00 on Sun 29th Nov 2026.
Reason: NIE Plant Maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: A0024 NEWCASTLE ROAD, U0116 OLD PARK ROAD, C0278 NEWCASTLE ROAD

13/11/2026 16:56:00 : ROADWORKS

U7015, BELSIZE PARK, LISBURN - Lane closure, U7015, BELSIZE ROAD, LISBURN

Location of worksRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NIW - replace boundary box

13/11/2026 16:56:00 : ROADWORKS

U5655, MILLVALE MEWS, BESSBROOK - Lane closure, U5655, MILLVALE MEWS, BESSBROOK

Roadworks will operate from Tue 1st Dec 2026 to Tue 8th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 7 millvale mews as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

B0079, DOMINIC STREET, NEWRY - Lane closure, B0079, DOMINIC STREET, NEWRY

Roadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: installation of new gas service to 53 dominic street with traffic lights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0631, CUPAR WAY, BELFAST - Road closure, U0631, CUPAR WAY, BELFAST

Road closureRoadworks will operate as follows:-
0700 to 1200 Reason: NIW works - Sewer Repair
Diversion in place.

Alternative Route Via:
Diversion 1: U0631 LANARK WAY, B0038 SPRINGFIELD ROAD, A0501 FALLS ROAD, U0631 NORTH HOWARD STREET

13/11/2026 16:56:00 : ROADWORKS

C0364, BALLYNABRAGGET ROAD, WARINGSTOWN - Road closure, C0364, BALLYNABRAGGET ROAD, WARINGSTOWN

Road ClosureRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Fibre install to customers house, 79 Ballynabragget Road
Diversion in place.

Alternative Route Via:
Diversion 1: A0026 BANBRIDGE ROAD, U1253 ANNAGHANOON ROAD, C0364 CLARE ROAD, C0364 BALLYNABRAGGET ROAD

13/11/2026 16:56:00 : ROADWORKS

A0004, DUNGANNON ROAD, PORTADOWN - Lane closure, A0004, DUNGANNON ROAD, PORTADOWN

Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NIE Overhead Line Work

13/11/2026 16:56:00 : ROADWORKS

C0154, UNION STREET, LURGAN - Lane closure, C0154, UNION STREET, LURGAN

Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: installation of new gas service to 135 union street with traffic lights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U1369, FESTIVAL ROAD, PORTADOWN - Lane closure, U1369, FESTIVAL ROAD, PORTADOWN

Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: installation of new gas service to 19 festival road with traffic lights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U4464, BURN BRAE GREEN, BANBRIDGE - Lane closure, U4464, BURN BRAE GREEN, BANBRIDGE

Roadworks will operate from Wed 2nd Dec 2026 to Wed 9th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 42 burn brae green as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U6294, ERSKINE STREET, NEWRY - Lane closure, U6294, ERSKINE STREET, NEWRY

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: installation of new gas service to 9 erskine street with traffic lights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U6299, DARAGH PARK, NEWRY - Lane closure, U6299, DARAGH PARK, NEWRY

Roadworks will operate from Mon 30th Nov 2026 to Mon 7th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 7 daragh park as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U4465, TOWNSEND STREET, BANBRIDGE - Lane closure, U4465, TOWNSEND STREET, BANBRIDGE

Roadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: installation of new gas service to 5 erinvale terrace with traffic lights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0836, GREENVILLE ROAD, BELFAST - Road closure, U0836, GREENVILLE ROAD, BELFAST

Road closureRoadworks will operate from 08:00 on Fri 4th Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: NIW works - Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0836 GREENVILLE ROAD, B0505 BEERSBRIDGE ROAD, U0836 CLARA AVENUE, U0836 WOODCOT AVENUE

13/11/2026 16:56:00 : ROADWORKS

U6299, DARAGH PARK, NEWRY - Lane closure, U6299, DARAGH PARK, NEWRY

Roadworks will operate from Mon 30th Nov 2026 to Mon 7th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 26 daragh park as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U4468, HARBERTON PARK, BANBRIDGE - Lane closure, U4468, HARBERTON PARK, BANBRIDGE

Roadworks will operate from Tue 17th Nov 2026 to Tue 24th Nov 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 8 harberton park as per chapter 8

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0635, ST JAMES PARK, BELFAST - Road closure, U0635, ST JAMES PARK, BELFAST

Road closure Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: NIW works - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0635 ST JAMES PARK, C0703 DONEGALL ROAD, A0501 FALLS ROAD

13/11/2026 16:56:00 : ROADWORKS BELFAST

C0263, BELFAST ROAD, NEWTOWNARDS - Lane closure, C0263, BELFAST ROAD, NEWTOWNARDS

location of worksRoadworks will operate from 09:30 on Wed 6th Jan 2027 to 16:30 on Wed 6th Jan 2027.
Reason: NIW - New PMA Pressure Monitor

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0820, REDCAR STREET, BELFAST - Road closure, U0820, REDCAR STREET, BELFAST

Road closure Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: NIW works - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 WOODSTOCK ROAD, U0820 PORTALLO STREET, U0820 EUSTON STREET, U0820 LEWIS COURT

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0606, ROSEMOUNT GARDENS, BELFAST - Road closure, U0606, ROSEMOUNT GARDENS, BELFAST

Road closureRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: NIW works - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0606 ROSEMOUNT GARDENS, A0006 ANTRIM ROAD, U0606 WILLOWBANK GARDENS, B0501 CAVEHILL ROAD

13/11/2026 16:56:00 : ROADWORKS

C0295, MIDDLE ROAD, SAINTFIELD - Road closure, C0295, MIDDLE ROAD, SAINTFIELD

Road ClosureRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Fibre install to customers house, 110 Middle Road, Saintfield
Diversion in place.

Alternative Route Via:
Diversion 1: C0295 MIDDLE ROAD, A0021 BALLYNAHINCH ROAD, U6300 FAIR GREEN TERRACE, B0006 LISBURN ROAD, U0181 LISBANE ROAD, U0182 LAURELBANK ROAD

13/11/2026 16:56:00 : ROADWORKS

U4317, PROSPECT ROAD, BALLYWARD - Road closure, U4317, PROSPECT ROAD, BALLYWARD

Road closure Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Replace or Install Boundary Box or Stop Cock
Diversion in place.

Alternative Route Via:
Diversion 1: U4318 MILLVALE ROAD, U4318 MILLVALE LANE, C0322 BALLYMACKILREINY ROAD, B0007 MONEYSLANE ROAD

13/11/2026 16:56:00 : ROADWORKS

B0078, MULLURG ROAD, MULLAGHBRACK - Lane closure, B0078, MULLURG ROAD, MULLAGHBRACK

Works LocationRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Fibre install to customers house, 45 Mullarg Road

13/11/2026 16:56:00 : ROADWORKS

U4047, SCOLBAN ROAD, DROMORE - Road closure, U4047, SCOLBAN ROAD, DROMORE

Road closureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NIW works - Comm Leak
Diversion in place.

Alternative Route Via:
Diversion 1: U4048 DRUMAGHADONE ROAD, U4051 EDNEGO ROAD, B0025 BARRONSTOWN ROAD, U4047 SCOLBAN ROAD

13/11/2026 16:56:00 : ROADWORKS

C0256, MOUNTSTEWART ROAD, CARROWDORE - Lane closure, C0256, MOUNTSTEWART ROAD, CARROWDORE

location of worksRoadworks will operate from 09:30 on Tue 5th Jan 2027 to 16:30 on Tue 5th Jan 2027.
Reason: NIW - New PMA Pressure Monitor

13/11/2026 16:56:00 : ROADWORKS BELFAST

A0001, LISBURN ROAD, BELFAST - Lane closure, A0001, LISBURN ROAD, BELFAST

location of worksRoadworks will operate from 09:30 on Tue 5th Jan 2027 to 16:30 on Tue 5th Jan 2027.
Reason: NIW - New PMA Pressure Monitor

13/11/2026 16:56:00 : ROADWORKS

B0025, KILBRONEY ROAD, ROSTREVOR - Lane closure, B0025, KILBRONEY ROAD, ROSTREVOR

Works LocationRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Fibre install to customers house, 97 Kilbroney Road

13/11/2026 16:56:00 : ROADWORKS

U5200, GREEN ROAD, NEWRY - Road closure, U5200, GREEN ROAD, NEWRY

Road closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: NIW works - full service water connection
Diversion in place.

Alternative Route Via:
Diversion 1: U5195 SEAVERS ROAD, U5197 SEAFIN ROAD, C0217 CHAPEL ROAD, B0113 NEWRY ROAD, B0113 FORKHILL ROAD, U5202 CARN ROAD

13/11/2026 16:56:00 : ROADWORKS

U1358, THE FAIRWAYS, PORTADOWN - Lane closure, U1358, THE FAIRWAYS, PORTADOWN

Roadworks will operate from Fri 4th Dec 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 52 the fairways as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U6294, DOWNSHIRE COURT, NEWRY - Lane closure, U6294, DOWNSHIRE COURT, NEWRY

Roadworks will operate from Thu 3rd Dec 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 9 downshire court as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

C0289, DRUMCULLAN ROAD, SEAFORDE - Road closure, C0289, DRUMCULLAN ROAD, SEAFORDE

Road ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Fibre install to customers house, 57 Drumcullan Road
Diversion in place.

Alternative Route Via:
Diversion 1: C0289 DRUMCULLAN ROAD, A0025 BALLYDUGAN ROAD, C0288 BUCKS HEAD ROAD

13/11/2026 16:56:00 : ROADWORKS

U6197, LOWER DROMORE ROAD, WARRENPOINT - Lane closure, U6197, LOWER DROMORE ROAD, WARRENPOINT

Roadworks will operate from Tue 1st Dec 2026 to Tue 8th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 80 lower dromore road as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

A0002, NEWRY STREET, WARRENPOINT - Lane closure, A0002, NEWRY STREET, WARRENPOINT

Roadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: installation of new gas service to 24 newry street with traffic lights as per chapter 8

13/11/2026 16:56:00 : ROADWORKS

U1370, BALLYHANNON ROAD, PORTADOWN - Road closure, U1370, BALLYHANNON ROAD, PORTADOWN

Road closure Roadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIW works - New PMA Pressure Monitor
Diversion in place.

Alternative Route Via:
Diversion 1: U1370 BALLYHANNON ROAD, C0151 OLD LURGAN ROAD, B0002 DRUMNACANVY ROAD

13/11/2026 16:56:00 : ROADWORKS BELFAST

A0023, MOUNTPOTTINGER ROAD, BELFAST - Lane closure, A0023, MOUNTPOTTINGER ROAD, BELFAST

location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Replace or Relevel S Cock Lid

13/11/2026 16:56:00 : ROADWORKS

U0380, RINGDUFFERIN ROAD, KILLYLEAGH - Lane closure, U0380, RINGDUFFERIN ROAD, KILLYLEAGH

location of worksRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NIW meter works

13/11/2026 16:56:00 : ROADWORKS BELFAST

A0055, KNOCK ROAD, BELFAST - Lane closure, A0055, KNOCK ROAD, BELFAST

Work locationRoadworks will operate from 09:30 on Thu 7th Jan 2027 to 16:30 on Thu 7th Jan 2027.
Reason: DFI works for central reservation maintenance

13/11/2026 16:56:00 : ROADWORKS

C0274, DARRAGH ROAD, SAINTFIELD - Lane closure, C0274, DARRAGH ROAD, SAINTFIELD

Works LocationRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Fibre install to customers house, 45A Darragh Road

13/11/2026 16:56:00 : ROADWORKS

B0059, STATION ROAD, DOAGH - Lane closure, B0059, STATION ROAD, DOAGH

Station Road, Doagh Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: DFI road maintenance, verge clearance

13/11/2026 16:56:00 : ROADWORKS

U1113, TULLYDAGAN ROAD, LURGAN - Road closure, U1113, TULLYDAGAN ROAD, LURGAN

Work locationRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NI railway bridge maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: U1113 TULLYDAGAN ROAD, B0012 CORNAKINNEGAR ROAD, B0012 ANTRIM ROAD, C0152 KILMORE ROAD

13/11/2026 16:56:00 : ROADWORKS

A0002, LARNE ROAD, CARRICKFERGUS - Lane closure, A0002, LARNE ROAD, CARRICKFERGUS

ClosureRoadworks will operate as follows:-
19:30 - 06:00
Closure Type :
Lane closure
Road Number :
A0002
Road Name :
LARNE ROAD
Town :
CARRICKFERGUS
Location From :
Tongue Loanen
Location To :
Jack Reid Cars
Date Start :
Mon 16 Nov 2026
Date End :
Tue 17 Nov 2026
Do restrictions permit access to emergency vehicles? :
Yes
Are existing traffic signals affected? :
No
Period Restriction will apply :
Overnight other – as agreed with approver
Reason For Closure:
Resurfacing for DFI Roads
Additional details:
Diversion Route :
Delay :
Less than 5 minutes
Additional TTR Information :
19:30 - 06:00
Reason Late :
Agreed with SFOReason: Resurfacing for DFI Roads

13/11/2026 16:56:00 : ROADWORKS

U1249, CRANNY LANE, BLEARY - Road closure, U1249, CRANNY LANE, BLEARY

Roadworks will operate from 09:00 on Thu 3rd Dec 2026 to 17:00 on Thu 3rd Dec 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U1249 CRANNY LANE, C0155 BLEARY ROAD, U1250 BLEARY ROAD, C0154 SUGAR ISLAND ROAD, U1247 CRANNY ROAD

13/11/2026 16:56:00 : ROADWORKS

B0031, NEWTOWNHAMILTON ROAD, ARMAGH - Lane closure, B0031, NEWTOWNHAMILTON ROAD, ARMAGH

Roadworks will operate from Mon 23rd Nov 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
23.11 8am start until 11.12Reason: DFI Southern (New Works & Maint Schemes) - Repair Displaced Masonry Parapet Armagh Bound

13/11/2026 16:56:00 : ROADWORKS

A1002, LIMAVADY ROAD, LONDONDERRY - Lane closure, A1002, LIMAVADY ROAD, LONDONDERRY

Works LocationRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: To facilitate tree works for McAuley Tree Surgery

13/11/2026 16:56:00 : ROADWORKS

U8281, GRANEMORE ROAD, ARMAGH - Road closure, U8281, GRANEMORE ROAD, ARMAGH

Roadworks will operate from Fri 13th Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Extension of current closure - removal of parapet leaves carriageway unsafe for traffic - local access will be maintained as far as possibleReason: DFI Southern (New Works & Maint Schemes) - Masonry Repairs to Parapet
Diversion in place.

Alternative Route Via:
Diversion 1: U8282 GRANEMORE ROAD, B0031 NEWTOWNHAMILTON ROAD, B0003 TASSAGH ROAD, C0201 DUNDRUM ROAD, U8281 GRANEMORE ROAD

13/11/2026 16:56:00 : ROADWORKS

U8255, DRUMDERG ROAD, DERRYLIN - Lane closure, U8255, DRUMDERG ROAD, DERRYLIN

Roadworks will operate from 09:00 on Wed 11th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: Drainage repairs

13/11/2026 16:56:00 : ROADWORKS

U1529, CORNSHELL FIELDS, LONDONDERRY - Road closure, U1529, CORNSHELL FIELDS, LONDONDERRY

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Tree maintenance works behind 53-64 Cornshell Fields. Vehicles and crane will be on site and result in cul da sac road needing closed between 7am-5pm
Diversion in place.

Alternative Route Via:
Diversion 1: U1529 CORNSHELL FIELDS

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0811, SICILY PARK, BELFAST - Lane closure, U0811, SICILY PARK, BELFAST

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Replace or Relevel (SV AV FH) Boxes

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0811, LOCKSLEY GARDENS, BELFAST - Road closure, U0811, LOCKSLEY GARDENS, BELFAST

Road ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Replace or Relevel (SV AV FH) Boxes
Diversion in place.

Alternative Route Via:
Diversion 1: U0811 SICILY PARK, A0001 UPPER LISBURN ROAD, U0811 LOCKSLEY PARK

13/11/2026 16:56:00 : ROADWORKS

C0323, LEITRIM ROAD, LEITRIM - Road closure, C0323, LEITRIM ROAD, LEITRIM

Road ClosureRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: Meter Works
Diversion in place.

Alternative Route Via:
Diversion 1: U4325 MCCARTANS ROAD, U4324 MAGHERAMAYO ROAD, U4328 DOLLYS BRAE, C0323 LEITRIM ROAD

13/11/2026 16:56:00 : ROADWORKS

C0322, BALLYDRUMMAN ROAD, LEITRIM - Road closure, C0322, BALLYDRUMMAN ROAD, LEITRIM

Road ClosureRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: CUT AND PROVE
Diversion in place.

Alternative Route Via:
Diversion 1: C0323 DROMARA ROAD, U4237 CARNALROE ROAD, C0322 BALLYDRUMMAN ROAD

13/11/2026 16:56:00 : ROADWORKS

U0180, CRAIGY ROAD, CARRYDUFF - Road closure, U0180, CRAIGY ROAD, CARRYDUFF

Road ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Full Service Water Connection
Diversion in place.

Alternative Route Via:
Diversion 1: U0180 CRAIGY ROAD, C0296 OUGHLEY ROAD, C0296 DRUMALIG ROAD, B0006 LISBURN ROAD

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0602, WATERLOO GARDENS, BELFAST - Road closure, U0602, WATERLOO GARDENS, BELFAST

Road ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: New PMA Pressure Monitor
Diversion in place.

Alternative Route Via:
Diversion 1: A0006 ANTRIM ROAD, U0602 DOWNVIEW AVENUE, U0602 INNISFAYLE ROAD

13/11/2026 16:56:00 : ROADWORKS

B0073, BATTERY ROAD, THE DIAMOND - Lane closure, B0073, DRUMENNY ROAD, THE DIAMOND

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Resurfacing works for DFI

13/11/2026 16:56:00 : ROADWORKS

C0255, MANSE ROAD, CARROWDORE - Lane closure, C0255, MANSE ROAD, CARROWDORE

Location of worksRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Meter Works

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0117, STONEY ROAD, BELFAST - Lane closure, U0117, STONEY ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Replace Manhole Cover and Frame

13/11/2026 16:56:00 : ROADWORKS

U0056, LISMENARY ROAD, BALLYNURE - Road closure, U0056, LISMENARY ROAD, BALLYNURE

Roadworks will operate from 09:00 on Fri 4th Dec 2026 to 17:00 on Fri 4th Dec 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U0056 LISMENARY ROAD, C0037 LOWER BALLYBOLEY ROAD, C0037 CHURCH ROAD

13/11/2026 16:56:00 : ROADWORKS

B0101, BRAITHWAITES ROAD, LISBURN - Lane closure, B0101, MULLAGHGLASS ROAD, LISBURN

lane closure Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: FRAME & COVER

13/11/2026 16:56:00 : ROADWORKS

U0027, BRAITHWAITES ROAD, LISBURN - Road closure, U0027, BRAITHWAITES ROAD, LISBURN

ROAD CLOSURE Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: FRAME & COVER
Diversion in place.

Alternative Route Via:
Diversion 1: A0501 MULLAGHGLASS ROAD

13/11/2026 16:56:00 : ROADWORKS

U0170, BRESAGH ROAD, TEMPLE - Road closure, U0170, BRESAGH ROAD, TEMPLE

road closure Roadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0296 DRENNAN ROAD, C0296 CHURCH ROAD, A0024 CARRYDUFF ROAD

13/11/2026 16:56:00 : ROADWORKS

C0296, DRENNAN ROAD, LISBURN - Road closure, C0296, DRENNAN ROAD, LISBURN

road closure Roadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0049 OLD BALLYNAHINCH ROAD, U0197 RIVER ROAD

13/11/2026 16:56:00 : ROADWORKS

U0173, MIDDLE ROAD, LISBURN - Road closure, U0173, MIDDLE ROAD, LISBURN

Road closure Roadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: NIW works - full service water connection
Diversion in place.

Alternative Route Via:
Diversion 1: U0175 CREEVY ROAD, B0178 COMBER ROAD, A0049 OLD BALLYNAHINCH ROAD, C0296 DRENNAN ROAD

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0647, LYNDHURST PARK, BELFAST - Road closure, U0647, LYNDHURST PARK, BELFAST

Road ClosureRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: Repair Gravity Sewer
Diversion in place.

Alternative Route Via:
Diversion 1: U0647 LYNDHURST LINK, U0647 LYNDHURST PARADE, U0647 LYNDHURST DRIVE

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0836, LICHFIELD AVENUE, BELFAST - Road closure, U0836, LICHFIELD AVENUE, BELFAST

Road closureRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: NIW works - Replace lead pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0836 BLOOMFIELD ROAD, U0836 GLENBROOK AVENUE, U0836 GRACE AVENUE

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0812, WELLINGTON PARK AVENUE, BELFAST - Road closure, U0812, WELLINGTON PARK AVENUE, BELFAST

Road closure Roadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: NIW works - Separation of Supply
Diversion in place.

Alternative Route Via:
Diversion 1: U0812 WELLINGTON PARK, U0812 WELLINGTON PARK TERRACE, U0812 EGLANTINE AVENUE

13/11/2026 16:56:00 : ROADWORKS

U4124, MOYBRICK ROAD, DROMARA - Road closure, U4124, MOYBRICK ROAD, DROMARA

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: NIW - Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: U4124 MOYBRICK ROAD, C0328 BANBRIDGE ROAD, U4123 ARDTANAGH ROAD

13/11/2026 16:56:00 : ROADWORKS

A0037, BROAD ROAD, LIMAVADY - Lane closure, A0037, BROAD ROAD, LIMAVADY

A0037, BROAD ROAD, LIMAVADYRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Test, Rod & Roping, Minor excavation & Cabling on the Fibrus Network

13/11/2026 16:56:00 : ROADWORKS

C0035, KNOCKAGH ROAD, NEWTOWNABBEY - Road closure, C0035, KNOCKAGH ROAD, NEWTOWNABBEY

Road ClosureRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: New PMA Pressure Monitor
Diversion in place.

Alternative Route Via:
Diversion 1: C0035 KNOCKAGH ROAD, U3003 WOODBURN ROAD, B0090 MIDDLE ROAD, B0090 UPPER ROAD, B0090 OLD CARRICK ROAD

13/11/2026 16:56:00 : ROADWORKS

B0003, TANDRAGEE ROAD, MARKETHILL - Lane closure, B0003, TANDRAGEE ROAD, MARKETHILL

B0003 TANDRAGEE RDRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: TO COVER UG CABLING AND CLEAR ANY BLOCKAGES FOUND

13/11/2026 16:56:00 : ROADWORKS

A0005, OMAGH ROAD, BALLYGAWLEY - Lane closure, A0005, OMAGH ROAD, BALLYGAWLEY

Works LocationRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Fibre install to customers house, 7 Findrum Road

13/11/2026 16:56:00 : ROADWORKS

A0003, CENTRAL WAY, PORTADOWN - Road closure, A0003, NORTHWAY, PORTADOWN

Roadworks will operate as follows:-
19:00 - 06:00Reason: DFI Roads - Carriageway Patching
Diversion in place.

Alternative Route Via:
Diversion 1: A0003 NORTHWAY, U1361 HIGHFIELD ROAD, A0027 MANDEVILLE ROAD, A0027 MARLBOROUGH RETAIL PARK, A0003 ROUNDABOUT 4, A0003 CENTRAL WAYDiversion 2: A0003 NORTHWAY, B0002 SEAGOE ROAD, U1361 KERNAN ROAD, A0027 LURGAN ROAD, A0027 MANDEVILLE ROAD

13/11/2026 16:56:00 : ROADWORKS

A0027, LURGAN ROAD, PORTADOWN - Lane closure, A0027, LURGAN ROAD, PORTADOWN

location of worksRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: NIW - Replace Manhole Cover and Frame

13/11/2026 16:56:00 : ROADWORKS

A0005, VICTORIA ROAD, BREADY - Lane closure, A0005, VICTORIA ROAD, BREADY

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 16:56:00 : ROADWORKS

U0164, BALLYCARNGANNON ROAD, LISBURN - Road closure, U0164, BALLYCARNGANNON ROAD, LISBURN

Work location Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: New connection for customer
Diversion in place.

Alternative Route Via:
Diversion 1: B0006 SAINTFIELD ROAD, B0178 COMBER ROAD

13/11/2026 16:56:00 : ROADWORKS

B0003, GILFORD ROAD, LURGAN - Lane closure, B0003, GILFORD ROAD, LURGAN

Location of worksRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: NIW - Replace Manhole Cover and Frame

13/11/2026 16:56:00 : ROADWORKS

B0031, NEWTOWNHAMILTON ROAD, ARMAGH - Lane closure, B0031, NEWTOWNHAMILTON ROAD, ARMAGH

Work location Roadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: New connection for customer

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0815, AVA STREET, BELFAST - Road closure, U0815, AVA STREET, BELFAST

Location of worksRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: NIW - Separation of Supply
Diversion in place.

Alternative Route Via:
Diversion 1: U0815 AVA STREET, U0815 HAYWOOD AVENUE, U0815 TIMBEY PARK, U0815 AVA AVENUE

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0835, SANDHILL GARDENS, BELFAST - Lane closure, U0835, SANDHILL GARDENS, BELFAST

53 Sandhill GardensRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0831, KNOCKLOFTY PARK, BELFAST - Lane closure, U0831, KNOCKLOFTY PARK, BELFAST

16 Knocklofty ParkRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0504, GLENVIEW DRIVE, BELFAST - Lane closure, U0504, GLENVIEW DRIVE, BELFAST

4 Glenview DriveRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

U9107, CASTLEHILL, COMBER - Lane closure, U9107, CASTLEHILL, COMBER

29 CastlehillRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

U0406, FARMLEY CRESCENT, GLENGORMLEY - Lane closure, U0406, FARMLEY CRESCENT, GLENGORMLEY

4 Farmley CrescentRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

U0411, FERNDALE CRESCENT, NEWTOWNABBEY - Lane closure, U0411, FERNDALE CRESCENT, NEWTOWNABBEY

36 Ferndale CrescentRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

U0422, LISBANE AVENUE, NEWTOWNABBEY - Lane closure, U0422, LISBANE AVENUE, NEWTOWNABBEY

20 Lisbane AvenueRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

U8106, CHURCH VIEW, HOLYWOOD - Lane closure, U8106, CHURCH VIEW, HOLYWOOD

54b Church ViewRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

B0002, DERRYTRASNA ROAD, DERRYTRASNA - Lane closure, B0002, DERRYTRASNA ROAD, DERRYTRASNA

location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: NIW - Replace or Rebuild Chamber

13/11/2026 16:56:00 : ROADWORKS

U9001, WINDSOR AVENUE, NEWTOWNARDS - Lane closure, U9001, WINDSOR AVENUE, NEWTOWNARDS

26 Windsor AvenueRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

U3107, THORNDENE PARK, CARRICKFERGUS - Lane closure, U3107, THORNDENE PARK, CARRICKFERGUS

20 Thorndene ParkRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

A0006, FOREGLEN ROAD, CLAUDY - Lane closure, A0006, GLENSHANE ROAD, CLAUDY

Lane closureRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Carriageway maintenance

13/11/2026 16:56:00 : ROADWORKS

A0001, KINGSWAY, DUNMURRY - Lane closure, A0001, KINGSWAY, DUNMURRY

Roadworks will operate from 09:30 on Fri 22nd Jan 2027 to 16:30 on Fri 22nd Jan 2027.
Reason: Tree Cutting

13/11/2026 16:56:00 : ROADWORKS

B0021, NEW ROAD, DONAGHADEE - Lane closure, B0021, NEW ROAD, DONAGHADEE

Roadworks will operate from 08:00 on Sun 6th Dec 2026 to 18:00 on Sun 6th Dec 2026.
Reason: NEW GAS CONNECTION

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0103, BALLYREGAN ROAD, BELFAST - Lane closure, U0103, BALLYREGAN ROAD, BELFAST

U0103, BALLYREGAN ROAD, BELFASTRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Splicing & Testing on the Fibrus Network

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0801, CREESLOUGH PARK, BELFAST - Lane closure, U0801, CREESLOUGH PARK, BELFAST

12 Creeslough ParkRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0648, COLINVIEW STREET, BELFAST - Lane closure, U0648, COLINVIEW STREET, BELFAST

17 Colinview StreetRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0833, ARDCARN DRIVE, BELFAST - Lane closure, U0833, ARDCARN DRIVE, BELFAST

42 ardcorn driveRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0839, GLENDOWER STREET, BELFAST - Lane closure, U0839, GLENDOWER STREET, BELFAST

22 glendower streetRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS BELFAST

U0834, KENSINGTON ROAD, BELFAST - Lane closure, U0834, KENSINGTON ROAD, BELFAST

47 kensington roadRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:56:00 : ROADWORKS

A0050, BANBRIDGE ROAD, GILFORD - Lane closure, A0050, BANBRIDGE ROAD, GILFORD

location of worksRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIW - Relevel or Replace Cover and Frame

13/11/2026 16:56:00 : ROADWORKS

A0006, FOREGLEN ROAD, DUNGIVEN - Lane closure, A0006, FOREGLEN ROAD, DUNGIVEN

Roadworks will operate from 08:00 on Tue 10th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Footway Surfacing

13/11/2026 16:56:00 : ROADWORKS

U8412, LOWER DARKLEY ROAD, KEADY - Road closure, U8412, LOWER DARKLEY ROAD, KEADY

ROAD CLOSURERoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: OH & UG CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U8411 ANNVALE ROAD, C0198 ANNVALE ROAD, U8405 GRANEMORE ROAD, C0201 DUNDRUM ROAD

13/11/2026 16:55:00 : ROADWORKS

A0029, MOY ROAD, STANGMORE - Lane closure, A0029, MOY ROAD, STANGMORE

Roadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: NIE Tree Cutting

13/11/2026 16:55:00 : ROADWORKS

U4072, BALLYMONEY ROAD, BANBRIDGE - Lane closure, U4072, BALLYMONEY ROAD, BANBRIDGE

U4072, BALLYMONEY ROAD, BANBRIDGERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: Cabling on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0811, MALFIN DRIVE, BELFAST - Lane closure, U0811, MALFIN DRIVE, BELFAST

92 Malfin DriveRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0811, SICILY PARK, BELFAST - Lane closure, U0811, SICILY PARK, BELFAST

138 Sicily ParkRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

M0001, M1 SPRUCEFIELD NORTH ON-SLIP ROAD (EAST BOUND), LISBURN - Lane closure, M0001, M1 SPRUCEFIELD NORTH ON-SLIP ROAD (EAST BOUND), LISBURN

Lane closureRoadworks will operate from 23:00 on Mon 16th Nov 2026 to 06:00 on Thu 19th Nov 2026.
Reason: VRS Repairs on M1 Motorway Junction 7 Onslip

13/11/2026 16:55:00 : ROADWORKS

U4462, KILN LANE, BANBRIDGE - Road closure, U4462, KILN LANE, BANBRIDGE

U4462, KILN LANE, BANBRIDGERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: Cabling on the Fibrus Network
Diversion in place.

Alternative Route Via:
Diversion 1: U4072 BALLYMONEY ROAD, U4072 HILL STREET, A0026 DROMORE STREET, A0026 CHURCH STREET, A0026 LURGAN ROAD, A0050 LURGAN ROAD

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0828, HENDERSON COURT, BELFAST - Lane closure, U0828, HENDERSON COURT, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Defective apparatus

13/11/2026 16:55:00 : ROADWORKS

U9009, TALBOT STREET, NEWTOWNARDS - Lane closure, U9009, TALBOT STREET, NEWTOWNARDS

17 Talbot StreetRoadworks will operate as follows:-
0930-1500Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U1369, PRINCESS WAY, PORTADOWN - Lane closure, U1369, PRINCESS WAY, PORTADOWN

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: installation of new gas service to 153 princess way with traffic lights as per chapter 8

13/11/2026 16:55:00 : ROADWORKS

U0411, ABERNETHY GARDENS, NEWTOWNABBEY - Lane closure, U0411, ABERNETHY GARDENS, NEWTOWNABBEY

29 Abernethy GardensRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0198, SEAHILL ROAD, HOLYWOOD CRAIGAVAD - Lane closure, U0198, SEAHILL ROAD, HOLYWOOD CRAIGAVAD

61 Seahill RoadRoadworks will operate as follows:-
0930-1500Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0420, KINGS DRIVE, NEWTOWNABBEY - Lane closure, U0420, KINGS DRIVE, NEWTOWNABBEY

12 Kings DriveRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0409, HEATHER PARK, NEWTOWNABBEY - Lane closure, U0409, HEATHER PARK, NEWTOWNABBEY

7 Heather ParkRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0408, ABBEY CRESCENT, NEWTOWNABBEY - Lane closure, U0408, ABBEY CRESCENT, NEWTOWNABBEY

14 Abbey CrescentRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U1962, CARNARGAN ROAD, NEWTOWNSTEWART - Road closure, U1962, CARNARGAN ROAD, NEWTOWNSTEWART

road closure Roadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: bt poling works
Diversion in place.

Alternative Route Via:
Diversion 1: U1962 TULLYNADALL ROAD, B0047 PLUMBRIDGE ROAD

13/11/2026 16:55:00 : ROADWORKS

C0199, CLAY ROAD, KEADY - Road closure, C0199, CLAY ROAD, KEADY

road closure Roadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: civils works
Diversion in place.

Alternative Route Via:
Diversion 1: A0029 DARKLEY ROAD, A0029 KEADY ROAD, A0029 ARMAGH ROAD, A0029 ARMAGH STREET, A0029 DUNDALK STREET, A0029 DUNDALK ROAD, A0029 THE SQUARE, A0025 BLANEY ROAD

13/11/2026 16:55:00 : ROADWORKS

U0420, KINGS AVENUE, NEWTOWNABBEY - Lane closure, U0420, KINGS AVENUE, NEWTOWNABBEY

48 Kings AvenueRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0424, RAVELSTON CRESCENT, CARNMONEY - Lane closure, U0424, RAVELSTON CRESCENT, CARNMONEY

3 Ravelston CrescentRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0423, TWINBURN DRIVE, MONKSTOWN - Lane closure, U0423, TWINBURN DRIVE, MONKSTOWN

25 Twinburn DriveRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0409, CLONBEG DRIVE, NEWTOWNABBEY - Lane closure, U0409, CLONBEG DRIVE, NEWTOWNABBEY

31 Clonbeg DriveRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

U0412, SWANSTON PARK, NEWTOWNABBEY - Lane closure, U0412, SWANSTON PARK, NEWTOWNABBEY

8 Swanston ParkRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS

A0509, DERRYLIN ROAD, BELLANALECK - Lane closure, A0509, DERRYLIN ROAD, BELLANALECK

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Resurfacing

13/11/2026 16:55:00 : ROADWORKS

U2079, VALLEY ROAD, WOODGREEN - Road closure, U2079, VALLEY ROAD, WOODGREEN

Right turn lane closure onto Valley RdRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Right turn closure onto Valley Rd to change a defective pole to allow Low wires work
Diversion in place.

Alternative Route Via:
Diversion 1: A0026 LISNEVENAGH ROAD, A0026 DUNSILLY ROUNDABOUT, C0048 MAINE ROAD, C0048 SLAGHT ROAD

13/11/2026 16:55:00 : ROADWORKS

U2079, VALLEY ROAD, Ballymena - Road closure, U2079, VALLEY ROAD, Ballymena

change a defective pole to allow Low wires workRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: change a defective pole to allow Low wires work
Diversion in place.

Alternative Route Via:
Diversion 1: A0026 LISNEVENAGH ROAD, C0047 CROMKILL ROAD, U2078 COCKHILL ROAD, C0048 SLAGHT ROADDiversion 2: C0048 SLAGHT ROAD, C0048 MAINE ROAD, A0026 LISNEVENAGH ROAD

13/11/2026 16:55:00 : ROADWORKS

A0001, A1 HILLSBOROUGH BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), LISBURN - Hard Shoulder closure, A0001, A1 HILLSBOROUGH BY-PASS DUAL CARRIAGEWAY (NORTH BO, LISBURN

A1 NB McKees dam HS & laybyRoadworks will operate from 09:00 on Wed 25th Nov 2026 to 17:00 on Sun 29th Nov 2026.
Reason: Drainage repairs and resurfacing works at A1 NB McKee's Dam

13/11/2026 16:55:00 : ROADWORKS

U4089, SALLAGH PARK SOUTH, LARNE - Lane closure, U4089, SALLAGH PARK SOUTH, LARNE

22 Sallagh Park SouthRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0505, KILMAKEE PARK, BELFAST - Road closure, U0505, KILMAKEE PARK, BELFAST

Road ClosureRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: Replace or Relay or Transfer Comms Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0505 GORTGRIB DRIVE, U0505 MOYNE PARK

13/11/2026 16:55:00 : ROADWORKS

U4119, ENAGH ROAD, WARINGSFORD - Lane closure, U4119, ENAGH ROAD, WARINGSFORD

Location of worksRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: REPLACE SV

13/11/2026 16:55:00 : ROADWORKS

A0031, MAGHERAFELT ROAD, MONEYMORE - Lane closure, A0031, MAGHERAFELT ROAD, MONEYMORE

Lane Closure Location MapRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Asphalt Patching

13/11/2026 16:55:00 : ROADWORKS

B0059, DOAGH ROAD, NEWTOWNABBEY - Lane closure, B0059, DOAGH ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from 09:30 on Mon 4th Jan 2027 to 16:30 on Mon 4th Jan 2027.
Reason: New PMA Pressure Monitor

13/11/2026 16:55:00 : ROADWORKS

B0143, LACKY ROAD, DONAGH - Lane closure, B0143, LACKY ROAD, DONAGH

Map 1 Nov 2026 Dernawilt X roadsRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Wed 16th Dec 2026.
Reason: Construction of a new bus stop and turning facility with associated car parking

13/11/2026 16:55:00 : ROADWORKS

B0059, DOAGH ROAD, NEWTOWNABBEY - Lane closure, B0059, ASPEN PARK, NEWTOWNABBEY

Location of worksRoadworks will operate from 09:30 on Mon 4th Jan 2027 to 16:30 on Mon 4th Jan 2027.
Reason: New PMA Pressure Monitor

13/11/2026 16:55:00 : ROADWORKS

C0032, LONGWOOD ROAD, NEWTOWNABBEY - Lane closure, C0032, LONGWOOD ROAD, NEWTOWNABBEY

Maintenance works on Telecoms system.Roadworks will operate from 08:00 on Tue 5th Jan 2027 to 18:00 on Thu 7th Jan 2027.
Reason: Maintenance works on Telecoms system.

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0836, BLOOMFIELD PARK, BELFAST - Road closure, U0836, BLOOMFIELD PARK, BELFAST

Road closure Roadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: NIW works - Repair Gravity Sewer
Diversion in place.

Alternative Route Via:
Diversion 1: U0836 BLOOMFIELD ROAD, C0701 GRAND PARADE, U0836 BLOOMFIELD PARK

13/11/2026 16:55:00 : ROADWORKS

U0017, PARK ROAD, MALLUSK - Lane closure, U0017, PARK ROAD, MALLUSK

Roadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Tue 22nd Dec 2026.
Reason: Surfacing and installation of new street lighting

13/11/2026 16:55:00 : ROADWORKS

A0029, COLERAINE ROAD, MAGHERA CO L/DERRY - Lane closure with Diversionary Measures, A0029, COLERAINE ROAD, MAGHERA CO L/DERRY

Roadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Required to carry out repairs to collapsed manhole service chamber
Diversion in place.

Alternative Route Via:
Diversion 1: A0042 MAIN STREET, C0549 STATION ROAD, C0549 CREW ROAD

13/11/2026 16:55:00 : ROADWORKS

U1147, ERVEY ROAD, EGLINTON - Lane closure, U1147, ERVEY ROAD, EGLINTON

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

13/11/2026 16:55:00 : ROADWORKS

U4016, MULLAGHSANDALL ROAD, LARNE - Lane closure, U4016, MULLAGHSANDALL ROAD, LARNE

U4016 MULLAGHSANDALL RDRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: MOLEPLOUGHING WORKS TO BE CARRIED OUT

13/11/2026 16:55:00 : ROADWORKS

U1556, MARKET STREET, LONDONDERRY - Road closure, U1556, MARKET STREET, LONDONDERRY

Road ClosureRoadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Sat 28th Nov 2026.
Reason: Shot blasting
Diversion in place.

Alternative Route Via:
Diversion 1: C0578 FERRYQUAY STREET, C0578 THE DIAMOND, C0578 SHIPQUAY STREET, C0578 WHITTAKER STREET, U0528 SHIPQUAY STREET, U0528 SHIPQUAY PLACE, U0528 WHITTAKER STREET, A1002 FOYLE EMBANKMENT, C0578 WATER STREET

13/11/2026 16:55:00 : ROADWORKS

C0535, GATESIDE ROAD, COLERAINE - Lane closure, C0535, GATESIDE ROAD, COLERAINE

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Repair Leaking Valve

13/11/2026 16:55:00 : ROADWORKS

U1556, NEWMARKET STREET, LONDONDERRY - Road closure, U1556, NEWMARKET STREET, LONDONDERRY

Road ClosureRoadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Sat 28th Nov 2026.
Reason: Shot blasting
Diversion in place.

Alternative Route Via:
Diversion 1: C0578 ORCHARD STREET, U1556 FOYLE STREET, U0528 SHIPQUAY PLACE, U0528 SHIPQUAY STREET, C0578 WHITTAKER STREET, C0578 SHIPQUAY STREET, C0578 THE DIAMOND, C0578 FERRYQUAY STREET

13/11/2026 16:55:00 : ROADWORKS

C0578, ORCHARD STREET, LONDONDERRY - Road closure, C0578, ORCHARD STREET, LONDONDERRY

One way closureRoadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Sat 28th Nov 2026.
Reason: Shot Blasting
Diversion in place.

Alternative Route Via:
Diversion 1: U1556 FOYLE STREET, U0528 SHIPQUAY PLACE, U0528 SHIPQUAY STREET, C0578 WHITTAKER STREET, C0578 SHIPQUAY STREET, C0578 THE DIAMOND, C0578 FERRYQUAY STREET

13/11/2026 16:55:00 : ROADWORKS

A0026, LINENHALL STREET, BALLYMENA - Lane closure, A0026, LINENHALL STREET, BALLYMENA

os 2 linen hall streetRoadworks will operate from Sun 22nd Nov 2026 to Sun 22nd Nov 2026.
Continuously from first day / last day on following times:-
7:30am - 15:00pmReason: installation of new gas service to 2 linen hall street with lane narrowing as per chapter 8

13/11/2026 16:55:00 : ROADWORKS

C0037, MAIN STREET, BALLYCLARE - Lane closure, C0037, MAIN STREET, BALLYCLARE

Roadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 16:55:00 : ROADWORKS

C0254, BALLYBLACK ROAD, NEWTOWNARDS - Lane closure, C0254, BALLYBLACK ROAD, NEWTOWNARDS

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house

13/11/2026 16:55:00 : ROADWORKS

U0401, MAYFIELD HIGH STREET, NEWTOWNABBEY - Road closure, U0401, MAYFIELD HIGH STREET, NEWTOWNABBEY

Location of worksRoadworks will operate from Mon 30th Nov 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
08:00 30-11-2026 - 18:00 04-12-2026Reason: NIW - SEWER CONNECTION
Diversion in place.

Alternative Route Via:
Diversion 1: U0401 MAYFIELD LINK, B0095 MALLUSK ROAD, B0095 HIGHTOWN ROAD, U0401 MAYFIELD GARDENS, U0401 MAYFIELD ROAD, U0401 MAYFIELD PARK

13/11/2026 16:55:00 : ROADWORKS

U2220, VALE ROAD, GREYSTEEL - Road closure, U2220, VALE ROAD, GREYSTEEL

Roadworks will operate as follows:-
09:15 to 14:00Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U2220 VALE ROAD, C0518 DUNLADE ROAD, A2002 CLOONEY ROAD

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0818, ORMEAU EMBANKMENT, BELFAST - Road closure, U0818, ORMEAU EMBANKMENT, BELFAST

Closure LocationRoadworks will operate as follows:-
1400hrs - 1600hrs
Article 8aReason: To ensure the safety of road users and runners during local running event,
Diversion in place.

Alternative Route Via:
Diversion 1: A0024 ORMEAU ROAD, B0506 RAVENHILL ROAD

13/11/2026 16:55:00 : ROADWORKS

A0020, PORTAFERRY ROAD, GREYABBEY - Lane closure, A0020, PORTAFERRY ROAD, GREYABBEY

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Tree Cutting

13/11/2026 16:55:00 : ROADWORKS

C0512, SLIEVEBOY ROAD, PARK - Road closure, C0512, SLIEVEBOY ROAD, PARK

SLIEVEBOY ROAD, PARKRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: replacement of BT poles
Diversion in place.

Alternative Route Via:
Diversion 1: C0509 LEARMOUNT ROAD, C0513 LONGLAND ROAD

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0840, PALMERSTON ROAD, BELFAST - Road closure, U0840, PALMERSTON ROAD, BELFAST

Road ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Tree felling
Diversion in place.

Alternative Route Via:
Diversion 1: U0840 PALMERSTON ROAD, U0840 STATION ROAD, B0505 HOLYWOOD ROAD

13/11/2026 16:55:00 : ROADWORKS

UNASSIGNED, THE OLDE FAIRWAYS, FIVEMILETOWN - Lane closure, UNASSIGNED, THE OLDE FAIRWAYS, FIVEMILETOWN

Area of worksRoadworks will operate from 09:30 on Mon 4th Jan 2027 to 16:30 on Wed 13th Jan 2027.
Reason: Lay cable on behalf of NIE, from TX to new site

13/11/2026 16:55:00 : ROADWORKS

A0028, NEWRY ROAD, ARMAGH - Lane closure, A0028, NEWRY ROAD, ARMAGH

NEWRY ROAD, ARMAGHRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: installation of BT duct

13/11/2026 16:55:00 : ROADWORKS

A0005, OMAGH ROAD, BALLYGAWLEY - Lane closure, A0005, OMAGH ROAD, BALLYGAWLEY

Lane ClosureRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Surface retexturing

13/11/2026 16:55:00 : ROADWORKS

B0018, WHITESIDES ROAD, MOUNT HILARY - Road closure, B0018, WHITESIDES ROAD, MOUNT HILARY

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: B0018 WHITESIDES ROAD, C0048 SLAGHT ROAD, C0048 MAGHERALANE ROAD, B0053 STATION ROAD, A0006 BRIDGE STREET, A0006 MAIN STREET, B0052 MAIN STREET, B0052 PORTGLENONE ROAD, B0093 AHOGHILL ROAD

13/11/2026 16:55:00 : ROADWORKS

B0201, CAPTAIN STREET LOWER, COLERAINE - Lane closure, B0201, CAPTAIN STREET LOWER, COLERAINE

lane closure Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: FRAME & COVER

13/11/2026 16:55:00 : ROADWORKS

A0037, DUNHILL ROAD, MACOSQUIN - Lane closure, A0037, DUNHILL ROAD, MACOSQUIN

works location Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: New connection for customer

13/11/2026 16:55:00 : ROADWORKS

C0053, TAYLORSTOWN ROAD, MONEYGLASS - Road closure, C0053, TAYLORSTOWN ROAD, MONEYGLASS

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0053 TAYLORSTOWN ROAD, B0018 ROGUERY ROAD, B0052 PORTGLENONE ROAD

13/11/2026 16:55:00 : ROADWORKS

A5002, MAGHERY ROAD, BALLYCASTLE - Lane closure, A5002, MAGHERY ROAD, BALLYCASTLE

Work location Roadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: New connection for customer

13/11/2026 16:55:00 : ROADWORKS

A0045, BALLYNAKILLY ROAD, COALISLAND - Lane closure, A0045, BALLYNAKILLY ROAD, COALISLAND

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: BT Openreach New Connection

13/11/2026 16:55:00 : ROADWORKS

C0513, LONGLAND ROAD, CLAUDY - Lane closure, C0513, LONGLAND ROAD, CLAUDY

LONGLAND ROAD, KILLYCORRRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: renewal of BT poles

13/11/2026 16:55:00 : ROADWORKS BELFAST

A0501, CASTLE PLACE, BELFAST - Lane closure, A0501, CASTLE PLACE, BELFAST

location of worksRoadworks will operate from Mon 16th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
09:30 16-11-2026 - 16:30 20-11-2026Reason: NIW - NEW SEWER CONNECTION

13/11/2026 16:55:00 : ROADWORKS

B0064, BANN ROAD, RASHARKIN - Lane closure, B0064, BANN ROAD, RASHARKIN

B0064, BANN ROAD, RASHARKINRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Civils on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS

C0091, VOW ROAD, KILREA - Lane closure, C0091, VOW ROAD, KILREA

C0091, VOW ROAD, KILREARoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS

C0091, BALNAMORE ROAD, BALLYMONEY - Lane closure, C0091, BALNAMORE ROAD, BALLYMONEY

C0091, BALNAMORE ROAD, BALLYMONEYRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network: In Conjunction with Works APP ID:84630

13/11/2026 16:55:00 : ROADWORKS

B0072, RAILWAY STREET, STRABANE - Lane closure, B0072, RAILWAY STREET, STRABANE

Area of worksRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Excavate and reinstate joint bay and service cable to new meter position on behalf of NIE

13/11/2026 16:55:00 : ROADWORKS

U1506, IONA PARK BUSINESS PARK, LONDONDERRY - Lane closure, U1506, IONA PARK BUSINESS PARK, LONDONDERRY

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIE Substation Maintenance

13/11/2026 16:55:00 : ROADWORKS

U1553, HAZELBANK ROAD, DRUMAHOE - Lane closure, U1553, HAZELBANK ROAD, DRUMAHOE

os 41 hazelbank roadRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation of new gas service to 41 hazelbank road with stop and go as per chapter 8

13/11/2026 16:55:00 : ROADWORKS

U1542, MOUNTAIN VIEW, LONDONDERRY - Road closure, U1542, MOUNTAIN VIEW, LONDONDERRY

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Trial dig for a new telecommunications mast
Diversion in place.

Alternative Route Via:
Diversion 1: U1542 ANDERSON CRESCENT, C0516 TRENCH ROAD, U1155 STRABANE OLD ROAD, B0523 IRISH STREET

13/11/2026 16:55:00 : ROADWORKS

C0094, CARNCULLAGH ROAD, DERVOCK - Lane closure, C0094, CARNCULLAGH ROAD, DERVOCK

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Pole Testing

13/11/2026 16:55:00 : ROADWORKS

B0059, DOAGH ROAD, NEWTOWNABBEY - Lane closure, B0059, DOAGH ROAD, NEWTOWNABBEY

Works LocationRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: To facilitate cable recovery for Openreach

13/11/2026 16:55:00 : ROADWORKS

U0418, CARNMONEY ROAD, NEWTOWNABBEY - Lane closure, U0418, CARNMONEY ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIW works

13/11/2026 16:55:00 : ROADWORKS

U1126, LOCK ROAD, EGLINTON - Road closure, U1126, LOCK ROAD, EGLINTON

road closure Roadworks will operate from Thu 19th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
23:00 start site to be stood down when safe to do so.Reason: BT POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U1126 DONNYBREWER ROAD, U1126 LOCK ROAD

13/11/2026 16:55:00 : ROADWORKS

U1512, SPRINGTOWN PARK, LONDONDERRY - Lane closure, U1512, SPRINGTOWN PARK, LONDONDERRY

SPRINGTOWN PARK, LONDONDERRYRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: renewal of BT pole

13/11/2026 16:55:00 : ROADWORKS

B0066, ARDREAGH ROAD, COLERAINE - Lane closure, B0066, ARDREAGH ROAD, COLERAINE

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Accessing carriageway chamber

13/11/2026 16:55:00 : ROADWORKS

U6514, DERRYCHARA ROAD, ENNISKILLEN - Road closure, U6514, DERRYCHARA ROAD, ENNISKILLEN

Road ClosureRoadworks will operate as follows:-
7PM to 6AM Reason: Carriageway Resurfacing
Diversion in place.

Alternative Route Via:
Diversion 1: U6514 QUAY PASS, A0004 FRITHS PASS, A0004 DUBLIN ROAD

13/11/2026 16:55:00 : ROADWORKS

B0034, BALLYGAWLEY ROAD, CASTLECAULFIELD - Lane closure, B0034, BALLYGAWLEY ROAD, CASTLECAULFIELD

Works LocationRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: To facilitate cable recovery for Openreach

13/11/2026 16:55:00 : ROADWORKS BELFAST

U0631, NORTH HOWARD STREET, BELFAST - One Way closure, U0631, NORTH HOWARD STREET, BELFAST

One way road closure north boundRoadworks will operate from Mon 16th Nov 2026 to Wed 18th Nov 2026.
Continuously from first day / last day on following times:-
Starting 0800 on 16-11-26 and will finish at 1630 on 18-11-26Reason: NIW works - Water connections
Diversion in place.

Alternative Route Via:
Diversion 1: U0631 NORTH HOWARD STREET, A0501 FALLS ROAD, B0502 NORTHUMBERLAND STREET, U0631 NORTH HOWARD LINK

13/11/2026 16:55:00 : ROADWORKS

B0017, PRIESTLAND ROAD, BUSHMILLS - Lane closure, B0017, PRIESTLAND ROAD, BUSHMILLS

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Full-Service Water Connection

13/11/2026 16:55:00 : ROADWORKS

B0186, CASHEL ROAD, MACOSQUIN - Lane closure, B0186, CASHEL ROAD, MACOSQUIN

B0186, CASHEL ROAD, RINGSENDRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Splicing and Testing on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS

A0046, LOUGH SHORE ROAD, DERRYGONN - Lane closure, A0046, LOUGH SHORE ROAD, DERRYGONN

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 16:55:00 : ROADWORKS

C0645, MULLYBRANNON ROAD, MOYGASHEL - Lane closure, C0645, MAIN ROAD, MOYGASHEL

Roadworks will operate from Mon 16th Nov 2026 to Sun 31st Jan 2027.
Continuously from first day / last day on following times:-
9.15am - 6pm
This Main Road MoygashelReason: Civils work prior to carriageway resurfacing

13/11/2026 16:55:00 : ROADWORKS

B0034, DUNGANNON ROAD, BALLYGAWLEY - Road closure, B0034, DUNGANNON ROAD, BALLYGAWLEY

Roadworks will operate as follows:-
9.30am - 6.30pmReason: Carriageway Surfacing
Diversion in place.

Alternative Route Via:
Diversion 1: B0034 DUNGANNON ROAD, A0005 null, A0005 TULLYVAR ROAD, A5 NEW A5 ROUNDABOUT, A0004 A4 DUAL CARRIAGEWAY (EAST BOUND), B0034 CABRAGH SLIP ROAD SOUTH (WEST BOUND)Diversion 2: B0034 CABRAGH SLIP ROAD SOUTH (WEST BOUND), A0004 A4 DUAL CARRIAGEWAY (WEST BOUND), A5 NEW A5 ROUNDABOUT, A0005 TULLYVAR ROAD, A0005 null, B0034 DUNGANNON ROAD

13/11/2026 16:55:00 : ROADWORKS

U5254, MULNAVOO ROAD, MONEYNEANY - Road closure, U5254, MULNAVOO ROAD, MONEYNEANY

Roadworks will operate from Mon 16th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Closure will need to remain up continuously due to open excavation in carriageway. Works planned to start 8am Monday and Completed by 4pm Friday.Reason: Repair Collapsing Carriageway and Lay 40m of Watermain
Diversion in place.

Alternative Route Via:
Diversion 1: B0040 MONEYNEANY ROAD, B0040 DERRYNOYD ROAD, U5255 CLOANE ROAD

13/11/2026 16:55:00 : ROADWORKS

C0535, GATESIDE ROAD, COLERAINE - Lane closure, C0535, GATESIDE ROAD, COLERAINE

C0535, GATESIDE ROAD, COLERAINERoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Permanently reinstating temporary sites

13/11/2026 16:55:00 : ROADWORKS

U5097, BALLYSCULLION ROAD, BELLAGHY - Lane closure, U5097, BALLYSCULLION ROAD, BELLAGHY

U5097, BALLYSCULLION ROAD, BELLAGHYRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS

B0042, GRANGE ROAD, MAGHERAFELT - Lane closure, B0042, MAGHERAFELT ROAD, MAGHERAFELT

B0042, MAGHERAFELT ROAD GRANGE ROAD, MAGHERAFELTRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Underground + Overhead Cabling and Civils on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS

A0029, MONEYSHARVAN ROAD, SWATRAGH - Lane closure, A0029, MONEYSHARVAN ROAD, SWATRAGH

A0029, MONEYSHARVAN ROAD, SWATRAGHRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Underground and Overhead Cabling and Civils on the Fibrus Network

13/11/2026 16:55:00 : ROADWORKS

A0002, SHORE ROAD, NEWTOWNABBEY - Lane closure, A0002, SHORE ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from Mon 4th Jan 2027 to Wed 13th Jan 2027.
Continuously from first day / last day on following times:-
09:30 04-01-2027 - 16:30 13-01-2027Reason: NIE works

13/11/2026 16:55:00 : ROADWORKS

U0456, MERVILLE GARDEN VILLAGE, NEWTOWNABBEY - Lane closure, U0456, MERVILLE GARDEN VILLAGE, NEWTOWNABBEY

Location of worksRoadworks will operate from Mon 4th Jan 2027 to Wed 13th Jan 2027.
Continuously from first day / last day on following times:-
09:30 04-01-2027 - 16:30 13-01-2027Reason: NIE works

13/11/2026 16:55:00 : ROADWORKS

B0062, BALLYBOGEY ROAD, PORTRUSH - Lane closure, B0062, BALLYBOGEY ROAD, PORTRUSH

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

13/11/2026 16:55:00 : ROADWORKS

A0032, QUEEN STREET, ENNISKILLEN - Lane closure, A0032, QUEEN STREET, ENNISKILLEN

Queen StreetRoadworks will operate as follows:-
20:00-23:00Reason: To remove facade of library

13/11/2026 16:55:00 : ROADWORKS

U8279, CLIFF ROAD, BELLEEK - Lane closure, U8279, CLIFF ROAD, BELLEEK

Area of worksRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Lay cable from edge of kerb to new charging pillar in Car park

13/11/2026 16:55:00 : ROADWORKS

A0004, A4 DUAL CARRIAGEWAY (WEST BOUND), GRANVILLE - Road closure, A0004, A4 DUAL CARRIAGEWAY (WEST BOUND), GRANVILLE

A4 west reaksmore to CabraghRoadworks will operate from 23:00 on Wed 25th Nov 2026 to 06:00 on Mon 30th Nov 2026.
Reason: Routine Maintenance: Grass cutting, sweeping, weed spraying & gully cleaning
Diversion in place.

Alternative Route Via:
Diversion 1: B0034 A4 DUAL CARRIAGEWAY (WEST BOUND), B0034 REASKMORE SLIP ROAD (WEST BOUND), B0034 REASKMORE WEST LINK ROAD, B0034 WOODLOUGH ROAD, B0034 BALLYGAWLEY ROAD, B0034 CABRAGH SLIP ROAD SOUTH (WEST BOUND)

13/11/2026 16:55:00 : ROADWORKS

B0160, SHORE ROAD, BALLYRONAN - 15 min Obstruction, B0160, SHORE ROAD, BALLYRONAN

Work LocationRoadworks will operate as follows:-
1100hrs - 2300hrsReason: To ensure the safety of film crew, pedestrians and road users during filming hours - 71B Application

13/11/2026 16:55:00 : ROADWORKS

U5003, FALLAHOGY ROAD, FALLAHOGEY - Road closure, U5003, FALLAHOGY ROAD, FALLAHOGEY

Roadworks will operate from 09:00 on Mon 16th Nov 2026 to 17:00 on Fri 18th Dec 2026.
Reason: Watermains rehab works for NIW
Diversion in place.

Alternative Route Via:
Diversion 1: C0549 GORSE ROAD, C0548 MONEYSALLIN ROAD

13/11/2026 16:55:00 : ROADWORKS

C0413, MAKENNY ROAD, IRVINESTOWN - Lane closure, C0413, MAKENNY ROAD, IRVINESTOWN

lane closure Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: BLOCKAGES AND CABLING

13/11/2026 16:55:00 : ROADWORKS BELFAST

A0020, UPPER NEWTOWNARDS ROAD, BELFAST - Lane closure, A0020, UPPER NEWTOWNARDS ROAD, BELFAST

Location of worksRoadworks will operate as follows:-
09:30 - 14:00Reason: Replace Manhole Cover and Frame

13/11/2026 16:55:00 : ROADWORKS BELFAST

A0001, BELFAST ROAD, LISBURN - Lane closure, A0001, BELFAST ROAD, LISBURN

Belfast RoadRoadworks will operate from Mon 9th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Continuous closure required in order to provide walkway for pedestriansReason: Construction of entrance into social housing development site

13/11/2026 16:55:00 : ROADWORKS

A0029, HALL STREET, MAGHERA CO L/DERRY - Road closure, A0029, HALL STREET, MAGHERA CO L/DERRY

road closureRoadworks will operate from Sat 28th Nov 2026 to Sat 28th Nov 2026.
Continuously from first day / last day on following times:-
16:00-18:30Reason: Maghera Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: C0551 MAIN STREET, A0042 MAIN STREET, U5322 BANK SQUARE, U5322 MEETING HOUSE AVENUE, A0029 TOBERMORE ROAD, A0029 HALL STREET, U5237 FAIR HILL, C0552 GLEN ROAD

13/11/2026 16:55:00 : ROADWORKS

A0029, WILLIAM STREET, COOKSTOWN - Road closure, A0029, WILLIAM STREET, COOKSTOWN

Roadworks will operate as follows:-
17:00 to 21:15Reason: Cookstown Christmas lights
Diversion in place.

Alternative Route Via:
Diversion 1: U0744 SWEEP ROAD, A0505 Drum Road, U0744 WESTLAND ROAD SOUTH, U0744 WESTLAND ROAD, U0744 MORGANS HILL ROAD

13/11/2026 09:47:00 : ROADWORKS

B0006, CLEA LOUGH ROAD, CROSSGAR - Lane closure, B0006, CLEA LOUGH ROAD, CROSSGAR

Location of worksRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Cut and Prove Comms Pipe

13/11/2026 09:47:00 : ROADWORKS

U4132, CROSSGAR ROAD, DROMARA - Road closure, U4132, CROSSGAR ROAD, DROMARA

road closure Roadworks will operate from 08:00 on Fri 4th Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: civils work
Diversion in place.

Alternative Route Via:
Diversion 1: U4131 PARK ROAD, C0293 DUNDRUM ROAD

13/11/2026 09:47:00 : ROADWORKS

A0002, MAIN STREET, DUNDRUM - Lane closure, A0002, MAIN STREET, DUNDRUM

Works LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to customers house, 167 Main Street

13/11/2026 09:47:00 : ROADWORKS

U6209, BRYANSFORD GARDENS, NEWCASTLE - Road closure, U6209, BRYANSFORD GARDENS, NEWCASTLE

Road ClosureRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U6209 SHIMNA VALE, U6207 SHIMNA ROAD, A0050 CASTLEWELLAN ROAD, A0050 DUNDRUM ROAD, A0002 DUNDRUM ROAD, A0002 RAILWAY STREET, A0002 MAIN STREET

13/11/2026 09:47:00 : ROADWORKS

U0041, CAUSEWAY END ROAD, LISBURN - Lane closure, U0041, CAUSEWAY END ROAD, LISBURN

Location of worksRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Replace or Relevel S Cock Lid

13/11/2026 09:47:00 : ROADWORKS

U0328, DERRYBOY ROAD, CROSSGAR - Road closure, U0328, DERRYBOY ROAD, CROSSGAR

Location of worksRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: NIW - Replace or Relevel SV AV FH Box
Diversion in place.

Alternative Route Via:
Diversion 1: A0022 KILLYLEAGH ROAD, C0271 SAINTFIELD ROAD, U0378 RAFFREY ROAD, C0272 CARRICKMANNON ROAD, B0006 MANSE ROAD

13/11/2026 09:47:00 : ROADWORKS

B0007, RATHFRILAND ROAD, DROMORE - Lane closure, B0007, RATHFRILAND ROAD, DROMORE

Works LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to customers house, 101 Rathfriland Road

13/11/2026 09:47:00 : ROADWORKS

U7316, BRACKNAGH ROAD, KILLYLEA - Road closure, U7316, BRACKNAGH ROAD, KILLYLEA

Roadworks will operate from 08:00 on Wed 11th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: Emergency Surfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: U7311 NAVAN FORT ROAD, A0028 KILLYLEA ROAD, C0185 ELM PARK ROAD, C0185 KNAPPAGH ROAD, B0115 BATTLEFORD ROAD

13/11/2026 09:47:00 : ROADWORKS

A0025, DOWNPATRICK ROAD, CLOUGH CO DOWN - Lane closure, A0025, DOWNPATRICK ROAD, CLOUGH CO DOWN

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Drainage Works

13/11/2026 09:47:00 : ROADWORKS

U7016, CLONMORE PARK, LISBURN - Lane closure, U7016, CLONMORE PARK, LISBURN

22 Clonmore ParkRoadworks will operate from 08:00 on Fri 4th Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0848, SANDHURST DRIVE, BELFAST - Lane closure, U0848, SANDHURST DRIVE, BELFAST

4 Sandhurst DriveRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0648, CLUAIN MOR DRIVE, BELFAST - Lane closure, U0648, CLUAIN MOR DRIVE, BELFAST

2 Cluain Mor LaneRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U7027, KENSINGTON PARK, LISBURN - Lane closure, U7027, KENSINGTON PARK, LISBURN

location of worksRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: NIW - Separation of Supply

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0835, CLARAWOOD CRESCENT, BELFAST - Lane closure, U0835, CLARAWOOD CRESCENT, BELFAST

41 Clarawood CrescentRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U5003, BALLYDOGHERTY ROAD, JERRETTSPASS - Road closure, U5003, BALLYDOGHERTY ROAD, JERRETTSPASS

Location of worksRoadworks will operate from Thu 26th Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
08:00 26-11-2026 - 18:00 27-11-2026Reason: NIW - trail opening
Diversion in place.

Alternative Route Via:
Diversion 1: C0174 TYRONES DITCHES, U5000 DRUMBANAGHER WALL, U5000 CORRINARE ROAD, U5002 BALLYDOGHERTY ROAD, U5003 BALLYDOGHERTY ROAD

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0833, CABIN HILL GARDENS, BELFAST - Lane closure, U0833, CABIN HILL GARDENS, BELFAST

45 Cabin Hill GardensRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

B0180, BRYANSFORD VILLAGE, BRYANSFORD - Lane closure, B0180, BRYANSFORD VILLAGE, BRYANSFORD

location of worksRoadworks will operate from Mon 4th Jan 2027 to Sun 24th Jan 2027.
Continuously from first day / last day on following times:-
09:30 04-01-2026 - 16:30 24-01-2027Reason: NIE works

13/11/2026 09:47:00 : ROADWORKS

B0064, SPRINGMOUNT ROAD, CLOUGH CO ANTRIM - Lane closure, B0064, SPRINGMOUNT ROAD, CLOUGH CO ANTRIM

B0064, SPRINGMOUNT ROAD, CLOUGH CO ANTRIMRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Splicing & Testing on the Fibrus Network - accessing one joint

13/11/2026 09:47:00 : ROADWORKS

U1005, DIAMOND LANE, AGHALEE - Road closure, U1005, DIAMOND LANE, AGHALEE

road closure Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0010 BRANKINSTOWN ROAD, U1024 FEATHERBED ROAD, U1002 BOGHEAD BRIDGE ROAD

13/11/2026 09:47:00 : ROADWORKS

B0007, BALLYNAHINCH ROAD, LISTOODER - Lane closure, B0007, BALLYNAHINCH ROAD, LISTOODER

lane closure Roadworks will operate from 08:00 on Fri 4th Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: POLING - CABLING WORKS

13/11/2026 09:47:00 : ROADWORKS

U2088, GROVE ROAD, KELLS - Road closure, U2088, GROVE ROAD, KELLS

road closure Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0053 STATION ROAD, B0098 MAIN STREET, B0098 GREENFIELD ROAD, B0098 SHANKBRIDGE ROAD

13/11/2026 09:47:00 : ROADWORKS

B0098, CARNCOME ROAD, KELLS - Lane closure, B0098, CARNCOME ROAD, KELLS

lane closure Roadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: POLING WORKS

13/11/2026 09:47:00 : ROADWORKS

B0113, FORKHILL ROAD, MEIGH - Lane closure, B0113, FORKHILL ROAD, MEIGH

LANE CLOSURE Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Fri 4th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS

13/11/2026 09:47:00 : ROADWORKS

U6056, BOG ROAD, HILLTOWN - Road closure, U6056, BOG ROAD, HILLTOWN

road closure Roadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Sat 5th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U6055 DRUMLOUGH CROSS, U6054 DRUMLOUGH SCHOOL ROAD, C0330 CROSS ROAD

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0847, ROSEMARY PARK, BELFAST - Lane closure, U0847, ROSEMARY PARK, BELFAST

17 Rosemary ParkRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

A0002, WARRENPOINT ROAD, NEWRY - Lane closure, A0002, WARRENPOINT ROAD, NEWRY

Lane ClosureRoadworks will operate from Wed 18th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
09:30hrs on 18th Nov until 16:00hrs on 20th NovReason: Core Drilling for proposed VMS

13/11/2026 09:47:00 : ROADWORKS

U4025, BALLYBOLEY ROAD, LARNE - Lane closure, U4025, BALLYBOLEY ROAD, LARNE

Clear water ducting installRoadworks will operate from Tue 10th Nov 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
Tue 10 Nov 2026 6pm Date End Fri 04 Dec 2026 6pm.
Period Restriction will apply : Continuous.
Additional details : Traffic lights to be manned 7am to 6pm.Reason: Clear water ducting install

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0801, CREESLOUGH PARK, BELFAST - Lane closure, U0801, CREESLOUGH PARK, BELFAST

112 Creeslough ParkRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

C0350, LISNAGADE ROAD, SCARVA - Road closure, C0350, LISNAGADE ROAD, SCARVA

road closure Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: BT POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0003 LEGANANNY ROAD, B0003 OLD MILL ROAD, B0003 MAIN STREET, B0003 GLENLOUGHAN ROAD, B0010 GLENLOUGHAN ROAD

13/11/2026 09:47:00 : ROADWORKS BELFAST

U7102, GLENDALE, BELFAST - Lane closure, U7102, GLENDALE, BELFAST

2 GlendaleRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

C0323, SLIEVENABOLEY ROAD, DROMARA - Road closure, C0323, SLIEVENABOLEY ROAD, DROMARA

ROAD CLOSURE Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0308 FINNIS ROAD, B0007 RATHFRILAND ROAD

13/11/2026 09:47:00 : ROADWORKS

U6193, UPPER BURREN ROAD, WARRENPOINT - Lane closure, U6193, UPPER BURREN ROAD, WARRENPOINT

lane closure Roadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0635, DISTILLERY STREET, BELFAST - Lane closure, U0635, DISTILLERY STREET, BELFAST

35 Distillery StreetRoadworks will operate from 08:00 on Thu 3rd Dec 2026 to 18:00 on Thu 3rd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

A0027, MAHON ROAD, PORTADOWN - Lane closure, A0027, MAHON ROAD, PORTADOWN

location of worksRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIW - Replace or Relevel (SV AV FH) Boxes

13/11/2026 09:47:00 : ROADWORKS

U6003, ENTERPRISE DRIVE, DOWNPATRICK - Lane closure, U6003, ENTERPRISE DRIVE, DOWNPATRICK

Roadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: NIE Plant Maintenance

13/11/2026 09:47:00 : ROADWORKS

B0002, MULLAHEAD ROAD, TANDRAGEE - Lane closure, B0002, MULLAHEAD ROAD, TANDRAGEE

Works LocationRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Fibre install to customers house, 76A Mullahead Road

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0607, JOANMOUNT PARK, BELFAST - Lane closure, U0607, JOANMOUNT PARK, BELFAST

111 Joanmount ParkRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0601, KILCOOLE GARDENS, BELFAST - Lane closure, U0601, KILCOOLE GARDENS, BELFAST

31 Kilcoole GardensRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

A0022, KILLYLEAGH ROAD, KILLINCHY - Lane closure, A0022, KILLYLEAGH ROAD, KILLINCHY

Works LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to customers house, 96 Killyleagh Road

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0641, OLIVE STREET, BELFAST - Lane closure, U0641, OLIVE STREET, BELFAST

12 Olive StreetRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

A0002, NEWCASTLE STREET, KILKEEL - Lane closure, A0002, NEWCASTLE STREET, KILKEEL

Works LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to customers house, 42 Newcastle Street

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0602, DOWNVIEW GARDENS, BELFAST - Lane closure, U0602, DOWNVIEW GARDENS, BELFAST

52 Downview GardensRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0628, ARDMOULIN AVENUE, BELFAST - Lane closure, U0628, ARDMOULIN AVENUE, BELFAST

18 Ardmoulin AvenueRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

B0180, BRYANSFORD VILLAGE, BRYANSFORD - Lane closure, B0180, BRYANSFORD VILLAGE, BRYANSFORD

location of worksRoadworks will operate from Mon 23rd Nov 2026 to Wed 23rd Dec 2026.
Continuously from first day / last day on following times:-
09:30 23-11-2026 - 16:30 23-12-2026Reason: NIE works

13/11/2026 09:47:00 : ROADWORKS

A0027, MAHON ROAD, PORTADOWN - Lane closure, A0027, MAHON ROAD, PORTADOWN

location of worksRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIW - Replace or Relevel (SV AV FH) Boxes

13/11/2026 09:47:00 : ROADWORKS

U1050, CLONMORE ROAD, MAGHERY - Lane closure, U1050, CLONMORE ROAD, MAGHERY

Works LocationRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Fibre install to customers house, 176 Clonmore Road

13/11/2026 09:47:00 : ROADWORKS

A0027, TANDRAGEE ROAD, TANDRAGEE - Lane closure, A0027, TANDRAGEE ROAD, TANDRAGEE

Location of worksRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIW - Replace or Relevel SV AV FH Box

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0525, BEECHWOOD MANOR, BELFAST - Lane closure, U0525, BEECHWOOD MANOR, BELFAST

15 Beechwood ManorRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0610, DEERPARK DRIVE, BELFAST - Lane closure, U0610, DEERPARK DRIVE, BELFAST

27 Deerpark DriveRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0647, LYNDHURST DRIVE, BELFAST - Lane closure, U0647, LYNDHURST DRIVE, BELFAST

1 Lyndhurst DriveRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U9001, DONARD AVENUE, NEWTOWNARDS - Lane closure, U9001, DONARD AVENUE, NEWTOWNARDS

42 Donard AvenueRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U9010, ILEX AVENUE, NEWTOWNARDS - Lane closure, U9010, ILEX AVENUE, NEWTOWNARDS

7 ilex AvenueRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

B0002, FRANCIS STREET, LURGAN - Lane closure, B0002, FRANCIS STREET, LURGAN

location of worksRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW - Reset Manhole Cover And Frame

13/11/2026 09:47:00 : ROADWORKS

C0154, MONBRIEF EAST ROAD, CRAIGAVON - Lane closure, C0154, DRUMGASK ROAD, CRAIGAVON

location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIW - New PMA Pressure Monitor

13/11/2026 09:47:00 : ROADWORKS

U9108, DERMOTT AVENUE, COMBER - Lane closure, U9108, DERMOTT AVENUE, COMBER

75 Dermott AvenueRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0620, NORTH STREET, BELFAST - Lane closure, U0620, NORTH STREET, BELFAST

Roadworks will operate as follows:-
06:30 - 12:30Reason: Building safety survey

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0608, TEDBURN PARK, BELFAST - Lane closure, U0608, TEDBURN PARK, BELFAST

21 Tedburn ParkRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0509, LAMBERT AVENUE, BELFAST - Lane closure, U0509, LAMBERT AVENUE, BELFAST

16 Lambert AvenueRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U9008, LAURELBANK AVENUE, NEWTOWNARDS - Lane closure, U9008, LAURELBANK AVENUE, NEWTOWNARDS

13 Laurelbank AvenueRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U9109, LABURNUM CRESCENT, COMBER - Lane closure, U9109, LABURNUM CRESCENT, COMBER

5 Laburnum CrescentRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

B0105, STATION ROAD, MOIRA - Lane closure, B0105, STATION ROAD, MOIRA

Location of worksRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIW -New PMA Pressure Monitor

13/11/2026 09:47:00 : ROADWORKS

U9016, INISHAROAN COURT, NEWTOWNARDS - Lane closure, U9016, INISHAROAN COURT, NEWTOWNARDS

8 Inisharoan CourtRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U7660, MILLVIEW PARK, RICHHILL - Lane closure, U7660, MILLVIEW PARK, RICHHILL

Roadworks will operate from Mon 23rd Nov 2026 to Mon 30th Nov 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 18 millview park as per chapter 8

13/11/2026 09:47:00 : ROADWORKS

U9600, OAKDALE COURT, BALLYGOWAN - Lane closure, U9600, OAKDALE COURT, BALLYGOWAN

12 Oakdale CourtRoadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U5052, CHURCH ROAD, NEWRY - Road closure, U5052, CHURCH ROAD, NEWRY

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW - Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: U5052 CHURCH ROAD, A0028 ARMAGH ROAD, C0216 JOCKEYS BRAE

13/11/2026 09:47:00 : ROADWORKS

U8003, BALLYGOWAN GARDENS, BANGOR - Lane closure, U8003, BALLYGOWAN GARDENS, BANGOR

5 Ballygowan GardensRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

A0055, KNOCK ROAD, BELFAST - Lane closure, A0055, KNOCK ROAD, BELFAST

Lane closureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Tree maintenance

13/11/2026 09:47:00 : ROADWORKS

U2079, BALLYCOWAN ROAD, BALLYMENA - Road closure, U2079, BALLYCOWAN ROAD, BALLYMENA

road closure Roadworks will operate from 08:00 on Wed 2nd Dec 2026 to 18:00 on Wed 2nd Dec 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0046 LIMINARY ROAD, B0053 STATION ROAD, B0098 MAIN STREET, B0098 GREENFIELD ROAD, B0098 SHANKBRIDGE ROAD

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0506, CUMBERLAND ROAD, BELFAST - Road closure, U0506, CUMBERLAND ROAD, BELFAST

Work LocationRoadworks will operate as follows:-
1100hrs - 1900hrsReason: To ensure the safety of road users, pedestrians & Film crew during filming hours
Diversion in place.

Alternative Route Via:
Diversion 1: U0506 CUMBERLAND AVENUE, U0506 REAVILLE PARK, U0506 GALWAY PARK, A0020 UPPER NEWTOWNARDS ROAD, A0022 COMBER ROAD, U0506 CUMBERLAND ROAD

13/11/2026 09:47:00 : ROADWORKS

U8003, LOVEROCK CLOSE, BANGOR - Lane closure, U8003, LOVEROCK CLOSE, BANGOR

4 Loverock CloseRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0602, SERPENTINE GARDENS, BELFAST - Lane closure, U0602, SERPENTINE GARDENS, BELFAST

21 Serpentine GardensRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

B0008, NEWRY ROAD, MAYOBRIDGE - Lane closure, B0008, NEWRY ROAD, MAYOBRIDGE

Roadworks will operate from Sat 14th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Extension to existing Lane closure due to unforeseen circumstances. Traffic lights will be manually operated between 08:00 to 10:00 and 15:30 to 18:30Reason: Extension to existing Lane closure due to unforeseen circumstances. Traffic lights will be manually operated between 08:00 to 10:00 and 15:30 to 18:30

13/11/2026 09:47:00 : ROADWORKS

B0079, PATRICK STREET, NEWRY - Lane closure, B0079, PATRICK STREET, NEWRY

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: installation of new gas service to 7 patrick street as per chapter 8

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0805, MOORELAND PARK, BELFAST - Lane closure, U0805, MOORELAND PARK, BELFAST

56 Mooreland ParkRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS BELFAST

U0801, DUNGLOE CRESCENT, BELFAST - Lane closure, U0801, DUNGLOE CRESCENT, BELFAST

55 Dungloe CrescentRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U1353, WOODLANDS MANOR, PORTADOWN - Lane closure, U1353, WOODLANDS MANOR, PORTADOWN

Roadworks will operate from Fri 6th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Continuously from 08:00 on 06.11.26 to 16:00 on 20.11.26Reason: NI Water Sewer installation

13/11/2026 09:47:00 : ROADWORKS BELFAST

U7108, LAGMORE MEADOWS, BELFAST - Lane closure, U7108, LAGMORE MEADOWS, BELFAST

97 Lagmore MeadowsRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:47:00 : ROADWORKS

U6105, CARLISLE PARK, BALLYNAHINCH - Lane closure, U6105, CARLISLE PARK, BALLYNAHINCH

20 Carlisle ParkRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0023, MALONE ROAD, BELFAST - Lane closure, B0023, MARLBOROUGH PARK, BELFAST

Works locationRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Thu 10th Dec 2026.
Reason: Tree cutting works

13/11/2026 09:46:00 : ROADWORKS

A0026, BANBRIDGE ROAD, LURGAN - Lane closure, A0026, BANBRIDGE ROAD, LURGAN

Roadworks will operate from 09:30 on Sun 22nd Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: installation of new gas service to 1 banbridge road with traffic lights as per chapter 8

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0803, CLONDARA PARADE, BELFAST - Road closure, U0803, CLONDARA PARADE, BELFAST

Road ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: New PMA Pressure Monitor
Diversion in place.

Alternative Route Via:
Diversion 1: U0803 HUGO STREET, A0501 FALLS ROAD, U0803 CLONDARA STREET

13/11/2026 09:46:00 : ROADWORKS

A0021, SAINTFIELD ROAD, BALLYNAHINCH - Lane closure, A0021, SAINTFIELD ROAD, BALLYNAHINCH

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Replace or Relay or Transfer Comms Pipe

13/11/2026 09:46:00 : ROADWORKS

C0005, NETTLEHILL ROAD, LISBURN - Road closure, C0005, NETTLEHILL ROAD, LISBURN

Closure MapRoadworks will operate from 08:00 on Thu 7th Jan 2027 to 18:00 on Fri 19th Mar 2027.
Reason: Footway and Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0030 BALLYMACASH ROAD, A0519 PRINCE WILLIAM ROAD

13/11/2026 09:46:00 : ROADWORKS

C0005, NETTLEHILL ROAD, LISBURN - Road closure, C0005, NETTLEHILL ROAD, LISBURN

Closure MapRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Wed 23rd Dec 2026.
Reason: Footway and Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0030 BALLYMACASH ROAD, A0519 PRINCE WILLIAM ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0138, GRANSHA ROAD, BELFAST - Lane closure, U0138, GRANSHA ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Replace or Inst Boundary Box or S Cock

13/11/2026 09:46:00 : ROADWORKS

U8002, SILVERSTREAM PARK, BANGOR - Road closure, U8002, SILVERSTREAM PARK, BANGOR

Closure MapRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Wed 23rd Dec 2026.
Reason: Footway and Carriageway Resurfacing
Diversion in place.

Alternative Route Via:
Diversion 1: U8002 SILVERSTREAM ROAD, U8002 SILVERSTREAM DRIVE, U8002 SILVERSTREAM CRESCENT

13/11/2026 09:46:00 : ROADWORKS

U8002, SILVERSTREAM GARDENS, BANGOR - Road closure, U8002, SILVERSTREAM GARDENS, BANGOR

Closure MapRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Wed 23rd Dec 2026.
Reason: Footway and Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: U8002 SILVERSTREAM ROAD, U8002 SILVERSTREAM DRIVE, U8002 SILVERSTREAM CRESCENT

13/11/2026 09:46:00 : ROADWORKS

U8002, SILVERSTREAM CRESCENT, BANGOR - Road closure, U8002, SILVERSTREAM CRESCENT, BANGOR

Closure MapRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Wed 23rd Dec 2026.
Reason: Footway and Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: U8002 SILVERSTREAM ROAD, U8002 SILVERSTREAM DRIVE

13/11/2026 09:46:00 : ROADWORKS

B0170, WHINNEY HILL, NEWTOWNARDS - Lane closure, B0170, WHINNEY HILL, NEWTOWNARDS

Carriageway excavations for cable faults.Roadworks will operate as follows:-
0600 - 1300Reason: Carriageway excavations for cable faults.

13/11/2026 09:46:00 : ROADWORKS

U0318, VIANSTOWN ROAD, DOWNPATRICK - Lane closure, U0318, VIANSTOWN ROAD, DOWNPATRICK

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Minor Works Installation NWR

13/11/2026 09:46:00 : ROADWORKS

U0424, KIMBERLEY ROAD, CARNMONEY - Lane closure, U0424, KIMBERLEY ROAD, CARNMONEY

27 Kimberley RoadRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0042, CARNLOUGH ROAD, BROUGHSHANE - Lane closure, A0042, CARNLOUGH ROAD, BROUGHSHANE

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

U3109, VICTORIA CRESCENT, CARRICKFERGUS - Lane closure, U3109, VICTORIA CRESCENT, CARRICKFERGUS

10 Victoria CrescentRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U4141, KERNAN ROAD, GILFORD - Road closure, U4141, KERNAN ROAD, GILFORD

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U4141 KERNAN ROAD, U4138 DRUMARAN ROAD, U4139 KERNAN LOUGH ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0648, COLINVIEW STREET, BELFAST - Lane closure, U0648, COLINVIEW STREET, BELFAST

17 Colinview StreetRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U4096, OAKDENE, LARNE - Lane closure, U4096, OAKDENE, LARNE

11 OakdeneRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0050, NEWCASTLE ROAD, CASTLEWELLAN - Lane closure, A0050, NEWCASTLE ROAD, CASTLEWELLAN

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Trial Opening

13/11/2026 09:46:00 : ROADWORKS

U9201, ASHBROOKE, DONAGHADEE - Lane closure, U9201, ASHBROOKE, DONAGHADEE

16 AshbrookeRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection
Diversion in place.

Alternative Route Via:
Diversion 2:

13/11/2026 09:46:00 : ROADWORKS

U0427, MONUMENT ROAD, LISBURN - Road closure, U0427, MONUMENT ROAD, LISBURN

Road ClosureRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: Replace or Inst Boundary Box or S Cock
Diversion in place.

Alternative Route Via:
Diversion 1: B0177 DROMORE ROAD, U0427 OLD COACH ROAD, U0427 MONUMENT ROAD

13/11/2026 09:46:00 : ROADWORKS

A0049, OLD BALLYNAHINCH ROAD, LISBURN - Lane closure, A0049, OLD BALLYNAHINCH ROAD, LISBURN

Location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Full Service Water Connection

13/11/2026 09:46:00 : ROADWORKS

A0007, CROSSGAR ROAD, SAINTFIELD - Lane closure, A0007, CROSSGAR ROAD, SAINTFIELD

Works LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to customers house, 79 Crossgar Road

13/11/2026 09:46:00 : ROADWORKS

U9200, WILLIAM STREET, DONAGHADEE - Lane closure, U9200, WILLIAM STREET, DONAGHADEE

11 William StreetRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0132, FARMHILL ROAD, HOLYWOOD CULTRA - Road closure, U0132, FARMHILL ROAD, HOLYWOOD CULTRA

Road ClosureRoadworks will operate from 08:00 on Tue 1st Dec 2026 to 18:00 on Tue 1st Dec 2026.
Reason: Full Service Water Connection
Diversion in place.

Alternative Route Via:
Diversion 1: U0132 FARMHILL ROAD, U0132 CLANBRASSIL ROAD, U0132 CULTRA AVENUE, U0132 OLD CULTRA ROAD

13/11/2026 09:46:00 : ROADWORKS

U9200, MEADOWBANK AVENUE, DONAGHADEE - Lane closure, U9200, MEADOWBANK AVENUE, DONAGHADEE

35 Meadowbank AvenueRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0025, NEWRY ROAD, RATHFRILAND - Lane closure, A0025, NEWRY ROAD, RATHFRILAND

Works LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to customers house, 107 Newry Road

13/11/2026 09:46:00 : ROADWORKS

B0176, KILLOUGH ROAD, DOWNPATRICK - Lane closure, B0176, KILLOUGH ROAD, DOWNPATRICK

Killough Road, Downpatrick Roadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

U0159, COPELAND AVENUE, MILLISLE - Lane closure, U0159, COPELAND AVENUE, MILLISLE

11 Copeland AvenueRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U8017, SEACLIFF ROAD, BANGOR - Lane closure, U8017, SEACLIFF ROAD, BANGOR

Location of worksRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Replace Lead Pipe

13/11/2026 09:46:00 : ROADWORKS

U2001, GORTGOLE ROAD, PORTGLENONE - Lane closure, U2001, GORTGOLE ROAD, PORTGLENONE

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 73A Gortgole Road

13/11/2026 09:46:00 : ROADWORKS

U4097, CUMBRAE HEIGHTS, LARNE - Lane closure, U4097, CUMBRAE HEIGHTS, LARNE

11 Cumbrae HeightsRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0366, BALLYNAHINCH ROAD, LISTOODER - Lane closure, U0366, BALLYNAHINCH ROAD, LISTOODER

Location of worksRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Meter Works

13/11/2026 09:46:00 : ROADWORKS

U8105, STRATHEARN COURT, HOLYWOOD - Lane closure, U8105, STRATHEARN COURT, HOLYWOOD

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U8108, ARDNAGREENA GARDENS, HOLYWOOD - Lane closure, U8108, ARDNAGREENA GARDENS, HOLYWOOD

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U3107, MEADOW HILL, CARRICKFERGUS - Lane closure, U3107, MEADOW HILL, CARRICKFERGUS

25 Meadow HillRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0307, KILKINAMURRY ROAD, KATESBRIDGE - Lane closure, C0307, KILKINAMURRY ROAD, KATESBRIDGE

C0307, KILKINAMURRY ROAD, Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0604, SOMERTON ROAD, BELFAST - Road closure, U0604, SOMERTON ROAD, BELFAST

Road ClosureRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Install FH
Diversion in place.

Alternative Route Via:
Diversion 1: U0604 LANSDOWNE ROAD, A0006 ANTRIM ROAD, U0604 PARKMOUNT ROAD, U0604 SOMERTON ROAD

13/11/2026 09:46:00 : ROADWORKS

U4097, ARGYLL VIEW, LARNE - Lane closure, U4097, ARGYLL VIEW, LARNE

28 Argyll ViewRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0322, GLEN ROAD, KILKINAMURRY - Lane closure, C0322, GLEN ROAD, KILKINAMURRY

C0322, GLEN ROAD, KILKINAMURRYRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U3112, TUDOR ROAD, CARRICKFERGUS - Lane closure, U3112, TUDOR ROAD, CARRICKFERGUS

1 Tudor RoadRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0307, KATESBRIDGE ROAD, KINALLEN - Lane closure, C0307, KATESBRIDGE ROAD, KINALLEN

C0307, KATEBRIDGE ROAD KINALLEN ROAD, KILKINAMURRYRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U0115, PINE HILL, LISBURN - Road closure, U0115, PINE HILL, LISBURN

Roadworks will operate from 09:00 on Mon 30th Nov 2026 to 17:00 on Mon 30th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U0115 PINE HILL, A0049 SAINTFIELD ROAD, B0006 SAINTFIELD ROAD, C0298 TULLYARD ROAD, U0152 BRANIEL ROAD

13/11/2026 09:46:00 : ROADWORKS

U3140, WINDSOR AVENUE, WHITEHEAD - Lane closure, U3140, WINDSOR AVENUE, WHITEHEAD

47 Windsor AvenueRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U3109, RED FORT PARK, CARRICKFERGUS - Lane closure, U3109, RED FORT PARK, CARRICKFERGUS

17 Red Fort ParkRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0003, LURGAN ROAD, MOIRA - Lane closure, A0003, LURGAN ROAD, MOIRA

A0003, LURGAN ROAD, MOIRARoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

C0359, BALLYGOWAN ROAD, LISBURN - Lane closure, C0359, BALLYGOWAN ROAD, LISBURN

C0359, BALLYGOWAN ROAD, DROMORE CO DOWNRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

B0177, DROMORE ROAD, HILLSBOROUGH - Lane closure, B0177, DROMORE ROAD, HILLSBOROUGH

B0177, DROMORE ROAD, HILLSBOROUGHRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U9201, ROBBYS POINT, DONAGHADEE - Lane closure, U9201, ROBBYS POINT, DONAGHADEE

15 Robbys PointRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U4075, NEW ROAD, BANBRIDGE - Lane closure, U4075, NEW ROAD, BANBRIDGE

U4075, NEW ROAD, BANBRIDGERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U9202, ERINDEE DRIVE, DONAGHADEE - Lane closure, U9202, ERINDEE DRIVE, DONAGHADEE

14 Erindee DriveRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0026, DROMORE ROAD, BANBRIDGE - Lane closure, A0026, DROMORE ROAD, BANBRIDGE

A0026, DROMORE ROAD, BANBRIDGERoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Test Rod and Roping with Possible Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U9201, ROBBYS POINT, DONAGHADEE - Lane closure, U9201, ROBBYS POINT, DONAGHADEE

20 Robbys PointRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U9201, SEAHILL PARK, DONAGHADEE - Lane closure, U9201, SEAHILL PARK, DONAGHADEE

12 Seahill ParkRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0026, BALLYMONEY ROAD, BALLYMENA - Lane closure, A0026, BALLYMONEY ROAD, BALLYMENA

Lane ClosureRoadworks will operate as follows:-
Overnight from 7pm on 09.12 to 6am on 10.12 and 7pm on 10.12 to 6am on 11.12Reason: Installation of CIPP Liner

13/11/2026 09:46:00 : ROADWORKS

U3141, OLD FORDE GARDENS, WHITEHEAD - Lane closure, U3141, OLD FORDE GARDENS, WHITEHEAD

26 Old Forde GardensRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0523, QUEEN STREET, BALLYMENA - Lane closure, A0523, TOOME ROAD, BALLYMENA

Lane ClosuresRoadworks will operate as follows:-
Overnight from 7pm on 8/12 to 6am on 9/12 & 7pm on 9/12 to 6am on 10/12Reason: Installation of CIPP Liner

13/11/2026 09:46:00 : ROADWORKS

U9200, GENERALS WALK, DONAGHADEE - Lane closure, U9200, GENERALS WALK, DONAGHADEE

32 Millisle RoadRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U9014, CRONSTOWN ROAD, NEWTOWNARDS - Lane closure, U9014, CRONSTOWN ROAD, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Fri 11th Dec 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

B0003, MOYROURKAN ROAD, MARKETHILL - Road closure, B0003, MOYROURKAN ROAD, MARKETHILL

Roadworks will operate from 09:30 on Wed 11th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Emergency Verge slips
Diversion in place.

Alternative Route Via:
Diversion 1: C0176 MAGHERYDOGHERTY ROAD, U7764 LOUGH ROAD, B0131 DRUMNAMETHER ROAD, B0003 MOYROURKAN ROADDiversion 2:

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0265, BELFAST - Lane closure, C0265, OLD DUNDONALD ROAD, BELFAST

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Meter Works

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0002, FINAGHY ROAD NORTH, BELFAST - Lane closure, C0002, FINAGHY ROAD NORTH, BELFAST

138 Finaghy Road NorthRoadworks will operate from 09:30 on Sun 29th Nov 2026 to 16:30 on Sun 29th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0258, VICTORIA ROAD, BALLYHALBERT - Lane closure, C0258, VICTORIA ROAD, BALLYHALBERT

C0258, VICTORIA ROAD, BALLYHALBERTRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U6600, STRANGFORD - Road closure, U6600, STRANGFORD

Road ClosureRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Replace or Relay or Transfer Comms Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U6600 null, A0002 THE SLIP, A0002 THE SQUARE

13/11/2026 09:46:00 : ROADWORKS

C0285, BALLYCLANDER ROAD, DOWNPATRICK - Road closure, C0285, BALLYCLANDER ROAD, DOWNPATRICK

Work LocationRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Fibre install to 19 Ballyclander Road
Diversion in place.

Alternative Route Via:
Diversion 1: U0246 BALLYCLANDER ROAD, U0245 QUARTER ROAD, B0001 ARDGLASS ROAD, C0285 BALLYCLANDER ROAD

13/11/2026 09:46:00 : ROADWORKS

A0076, WILLIAM STREET, LURGAN - Lane closure, A0076, WILLIAM STREET, LURGAN

Work LocationRoadworks will operate as follows:-
0700hrs - 1300hrsReason: Fibre install to 6 William Street

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0820, LOOPLAND ROAD, BELFAST - Lane closure, U0820, LOOPLAND ROAD, BELFAST

21 loopland roadRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0008, NEWRY ROAD, MAYOBRIDGE - Lane closure, B0008, NEWRY ROAD, MAYOBRIDGE

Works LocationRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Fibre install to customers house, 111 Newry Road

13/11/2026 09:46:00 : ROADWORKS

U0071, GRAVELHILL ROAD, LISBURN - Road closure, U0071, GRAVELHILL ROAD, LISBURN

Road closureRoadworks will operate from Mon 14th Dec 2026 to Mon 21st Dec 2026.
Continuously from first day / last day on following times:-
Starting at 0930 on 14-12-26 to 1630 on 21-12-26Reason: NIW works - NEW SEWER CONNECTION
Diversion in place.

Alternative Route Via:
Diversion 1: U0071 GRAVELHILL ROAD, A0003 MOIRA ROAD, A0003 LISBURN ROAD, C0008 MEADOW ROAD, C0008 HILLSBOROUGH ROAD, C0363 LANY ROAD, C0363 MOIRA ROAD, U0411 TRENCH ROAD, U0411 KESH ROAD

13/11/2026 09:46:00 : ROADWORKS

U2126, LONGMORE ROAD, BROUGHSHANE - Road closure, U2126, LONGMORE ROAD, BROUGHSHANE

Roadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U2126 LONGMORE ROAD, A0042 CARNLOUGH ROAD, C0068 TULLYMORE ROAD, C0068 POLLEE ROAD

13/11/2026 09:46:00 : ROADWORKS

A0027, MAHON ROAD, PORTADOWN - Lane closure, A0027, MAHON ROAD, PORTADOWN

Roadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: installation of new gas service to 6 mahon terrace with traffic lights as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U6290, BALLYHOLLAND ROAD, NEWRY - Road closure, U6290, BALLYHOLLAND ROAD, NEWRY

Road ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 53 Ballyholland Road
Diversion in place.

Alternative Route Via:
Diversion 1: C0334 DERRYLECKAGH ROAD, B0007 BRIDGE ROAD, C0334 AUGHNAGON ROAD, C0371 GREENAN ROAD, B0007 MILLTOWN STREET, U6192 GREENAN LOUGH ROAD, C0333 GREENAN LOUGH ROAD, U6159 BETTYS HILL ROAD

13/11/2026 09:46:00 : ROADWORKS

C0305, HILLSBOROUGH OLD ROAD, LISBURN - Lane closure, C0305, HILLSBOROUGH OLD ROAD, LISBURN

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Trial Opening

13/11/2026 09:46:00 : ROADWORKS

B0027, MOYAD ROAD, KILKEEL - Lane closure, B0027, MOYAD ROAD, KILKEEL

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 189 Moyad Road

13/11/2026 09:46:00 : ROADWORKS

C0270, GLEN ROAD, COMBER - Lane closure, C0270, GLEN ROAD, COMBER

Location of worksRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Replace or Inst Boundary Box or S Cock

13/11/2026 09:46:00 : ROADWORKS

C0379, SPRINGHILL ROAD, BANGOR - Lane closure, C0379, SPRINGHILL ROAD, BANGOR

Location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Replace Manhole Cover and Frame

13/11/2026 09:46:00 : ROADWORKS

B0115, BATTLEFORD ROAD, ARMAGH - Lane closure, B0115, BATTLEFORD ROAD, ARMAGH

Work LocationRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Fibre install to 186 Battleford Road

13/11/2026 09:46:00 : ROADWORKS

U9204, BENNETTS AVENUE, DONAGHADEE - Road closure, U9204, BENNETTS AVENUE, DONAGHADEE

Road closure Roadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: NIW works - Separation of Supply
Diversion in place.

Alternative Route Via:
Diversion 1: B0021 NEW ROAD, A0002 WARREN ROAD, U9204 EAST STREET

13/11/2026 09:46:00 : ROADWORKS

U8106, DOWNSHIRE ROAD, HOLYWOOD - Road closure, U8106, DOWNSHIRE ROAD, HOLYWOOD

Road closure Roadworks will operate as follows:-
0800 to 1500Reason: NIW works - Separation of supply
Diversion in place.

Alternative Route Via:
Diversion 1: U8106 DOWNSHIRE ROAD, U8106 CHURCH VIEW, U8108 MY LADY'S MILE, C0303 DEMESNE ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0520, CULROSS DRIVE, BELFAST - Road closure, U0520, CULROSS DRIVE, BELFAST

Road closure Roadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW works - Replace manhole cover and frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0520 CULROSS DRIVE, U0520 CAIRNSMORE AVENUE, U0520 CRAIGLEITH DRIVE, U0514 DRUMADOON DRIVE, U0520 BEAULY DRIVE

13/11/2026 09:46:00 : ROADWORKS

U0167, BLOOMFIELD ROAD SOUTH, BANGOR - Lane closure, U0167, BLOOMFIELD ROAD SOUTH, BANGOR

Line marking new entranceRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Asphalting and line marking to do at the front entrance to the store

13/11/2026 09:46:00 : ROADWORKS

A0026, BANBRIDGE ROAD, LURGAN - Lane closure, A0026, BANBRIDGE ROAD, LURGAN

os 1 banbridge roadRoadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: installation of new gas service to 1 banbridge road with stop and go as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U0127, CRABTREE ROAD, BALLYNAHINCH - Road closure, U0127, CRABTREE ROAD, BALLYNAHINCH

Road ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Fibre install to customers house, 58 Crabtree Road
Diversion in place.

Alternative Route Via:
Diversion 1: U0127 CRABTREE ROAD, B0002 DOWNPATRICK ROAD, A0024 DRUMANESS ROAD, C0388 DRUMANESS ROAD

13/11/2026 09:46:00 : ROADWORKS

B0002, CHARLESTOWN ROAD, PORTADOWN - Road closure, B0002, CHARLESTOWN ROAD, PORTADOWN

Roadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: B0002 CHARLESTOWN ROAD, B0002 DERRYTRASNA ROAD, B0002 DERRYMACASH ROAD, C0157 KILVERGAN ROAD, U1175 CARBET ROAD, U1361 DRUMNAGOON ROAD, U1176 CARN ROAD

13/11/2026 09:46:00 : ROADWORKS

U1386, LEGAHORY COURT, CRAIGAVON - Lane closure, U1386, DRUMGOR ROAD, CRAIGAVON

lane closureRoadworks will operate from Wed 9th Dec 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
Continuous from 9.30am Wednesday 9th December to 6am Friday 11th December
lights will be removed at night.Reason: Installation of CIPP Liner from existing manholes

13/11/2026 09:46:00 : ROADWORKS

U1115, LENAMORE ROAD, LONDONDERRY - Lane closure, U1115, LENAMORE ROAD, LONDONDERRY

Lenamore RoadRoadworks will operate from Mon 9th Nov 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
Traffic Management will be manually controlled during periods of peak traffic flow.Reason: Road Strengthening Works to existing retaining wall adj. Sandale Park

13/11/2026 09:46:00 : ROADWORKS

U1408, VICTORIA STREET, LURGAN - Lane closure with Diversionary Measures, U1408, VICTORIA STREET, LURGAN

VICTORIA STREET, LURGANRoadworks will operate from 09:30 on Mon 14th Dec 2026 to 16:30 on Mon 21st Dec 2026.
Reason: installation of NIE duct
Diversion in place.

Alternative Route Via:
Diversion 1: C0153 LAKE STREET, B0012 LOWER NORTH STREET, B0012 NORTH STREET, A0003 CHURCH PLACE, A0076 WILLIAM STREET

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0178, COMBER ROAD, BELFAST - Lane closure, B0178, COMBER ROAD, BELFAST

Works LocationRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Fibre install to customers house, 46 Comber Road

13/11/2026 09:46:00 : ROADWORKS

C0371, OLD WARRENPOINT ROAD, NEWRY - One Way closure, C0371, OLD WARRENPOINT ROAD, NEWRY

Roadworks will operate from Sun 8th Nov 2026 to Sun 22nd Nov 2026.
Continuously from first day / last day on following times:-
Road Closed Monday 12th October 08:00am
Road Opened Sunday 22nd November 17:00pmReason: Surfacing WorksPTS Operatives manning closure daily PERMIT EXTENSION
Diversion in place.

Alternative Route Via:
Diversion 1: C0371 OLD WARRENPOINT ROAD, A0002 WARRENPOINT ROAD, U6194 OLD WARRENPOINT ROAD

13/11/2026 09:46:00 : ROADWORKS

U0418, CARNMONEY ROAD, NEWTOWNABBEY - Lane closure, U0418, CARNMONEY ROAD, NEWTOWNABBEY

226 Carnmoney RoadRoadworks will operate from 08:00 on Sat 28th Nov 2026 to 18:00 on Sat 28th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0003, GROVEHILL ROAD, LOUGHBRICKLAND - Lane closure, B0003, GROVEHILL ROAD, LOUGHBRICKLAND

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 105 Grovehill Road

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0843, NORTH GREEN, BELFAST - Lane closure, U0843, NORTH GREEN, BELFAST

3 North Green Roadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0411, KESH ROAD, LISBURN - Lane closure, U0411, KESH ROAD, LISBURN

14 Kesh RoadRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0820, GIBSON PARK GARDENS, BELFAST - Lane closure, U0820, GIBSON PARK GARDENS, BELFAST

14 Gibson Park GardensRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0064, STATION ROAD, DUNGIVEN - One Way closure, B0064, STATION ROAD, DUNGIVEN

Roadworks will operate from Wed 11th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Closure will need to remain up continuously due to deep open excavation. Works planned to start 8am Wednesday 11th Nov and Completed by 4pm Friday 20th Nov.Reason: Foul and Storm Sewer Connection to new development site
Diversion in place.

Alternative Route Via:
Diversion 1: B0068 BALLYQUIN ROAD, A0006 MAIN STREET, B0064 GARVAGH ROADDiversion 2: B0068 BALLYQUIN ROAD, B0064 DRY ARCH ROAD, B0064 LEGAVALLON ROAD, B0064 GARVAGH ROAD

13/11/2026 09:46:00 : ROADWORKS

C0447, LOUGHSIDE ROAD, GARRISON - Road closure, C0447, LOUGHSIDE ROAD, GARRISON

Roadworks will operate from Fri 13th Nov 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Continuous Road Closure for Pipeline InstallationReason: Pipeline Installation
Diversion in place.

Alternative Route Via:
Diversion 1: C0447 MELVIN ROAD, B0052 BROLLAGH ROAD, U8465 DERRYNAMEEO ROAD, U6300 DERRYNAMEEO ROAD, U0544 DERRYNAMEEO ROAD, U9331 DERRYNAMEEO ROAD, U8482 DERRYNACROSS ROAD, C0447 LOUGHSIDE ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0848, CAIRO STREET, BELFAST - Lane closure, U0848, CAIRO STREET, BELFAST

2 Cairo StreetRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0512, FOUR WINDS PARK, BELFAST - Lane closure, U0512, FOUR WINDS PARK, BELFAST

2 Four Winds ParkRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A2002, SEACOAST ROAD, DOWNHILL - Lane closure, A2002, SEACOAST ROAD, DOWNHILL

Roadworks will operate from Mon 23rd Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Traffic Control will need to remain up continuously due to depth of excavation. Works planned to start 8am Monday and Completed by 4pm Friday. Reason: Sewer Connection

13/11/2026 09:46:00 : ROADWORKS

A0006, HILLHEAD ROAD, THE CREAGH - Lane closure, A0006, HILLHEAD ROAD, THE CREAGH

Roadworks will operate from 08:00 on Mon 9th Nov 2026 to 18:00 on Fri 4th Dec 2026.
Reason: Required to carry out new footway construction

13/11/2026 09:46:00 : ROADWORKS

U7106, LENWOOD DRIVE, DUNMURRY - Lane closure, U7106, LENWOOD DRIVE, DUNMURRY

11 Lenwood DriveRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0834, KENSINGTON ROAD, BELFAST - Road closure, U0834, KENSINGTON ROAD, BELFAST

Location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW -Separation of Supply
Diversion in place.

Alternative Route Via:
Diversion 1: U0834 KENSINGTON ROAD, A0055 KNOCK ROAD, C0265 KINGS ROAD, C0269 GILNAHIRK ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0820, LOOPLAND GARDENS, BELFAST - Lane closure, U0820, LOOPLAND GARDENS, BELFAST

43 Loopland GardensRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7201, DOWNSHIRE PARK, LISBURN - Lane closure, U7201, DOWNSHIRE PARK, LISBURN

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIE Generator Parking

13/11/2026 09:46:00 : ROADWORKS

U7024, WESLEY STREET, LISBURN - Lane closure, U7024, WESLEY STREET, LISBURN

56 Wesley StreetRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0002, DONEGALL QUAY, BELFAST - Lane closure, A0002, DONEGALL QUAY, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIE Substation Maintenance

13/11/2026 09:46:00 : ROADWORKS

U8014, KILLAIRE AVENUE, BANGOR - Road closure, U8014, KILLAIRE AVENUE, BANGOR

Location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW - REPLACE COMM
Diversion in place.

Alternative Route Via:
Diversion 1: U8014 KILLAIRE PARK, B0020 CRAWFORDSBURN ROAD, U8014 STATION ROAD, U8014 KILLAIRE AVENUE

13/11/2026 09:46:00 : ROADWORKS

A0004, DUNGANNON ROAD, PORTADOWN - Lane closure, A0004, DUNGANNON ROAD, PORTADOWN

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 142 Dungannon Road

13/11/2026 09:46:00 : ROADWORKS

U1025, CLOGHOG ROAD, CLONOE - Road closure, U1025, CLOGHOG ROAD, CLONOE

CLOGHOG ROAD, CLONOERoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: renewal of NIE poles and NIE cables
Diversion in place.

Alternative Route Via:
Diversion 1: C0642 WASHINGBAY ROAD, B0520 MOOR ROAD, B0161 MOOR ROAD, B0161 MOUNTJOY ROAD

13/11/2026 09:46:00 : ROADWORKS

B0131, KILMORE ROAD, KILMORE CO ARMAGH - Lane closure, B0131, KILMORE ROAD, KILMORE CO ARMAGH

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 102 Kilmore Road

13/11/2026 09:46:00 : ROADWORKS

U7013, KENILWORTH DRIVE, LISBURN - Lane closure, U7013, KENILWORTH DRIVE, LISBURN

1 Kenilworth DriveRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0329, CASTLERAINEY ROAD, LISTOODER - Road closure, U0329, CASTLERAINEY ROAD, LISTOODER

Road ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 7 Castlerainey Road
Diversion in place.

Alternative Route Via:
Diversion 1: U0329 BALLYALGAN ROAD, C0275 DERRYBOY ROAD, U0369 GLASSWATER ROAD, C0274 BARNAMAGHERY ROAD

13/11/2026 09:46:00 : ROADWORKS

B0520, MOOR ROAD, CLONOE - Lane closure, B0520, MOOR ROAD, CLONOE

MOOR ROAD, CLONOERoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: renewal of NIE pole and cable

13/11/2026 09:46:00 : ROADWORKS

U7008, CAIRNMORE CRESCENT, LISBURN - Lane closure, U7008, CAIRNMORE CRESCENT, LISBURN

23 Cairnmore ParkRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7106, GARDENMORE ROAD, DUNMURRY - Lane closure, U7106, GARDENMORE ROAD, DUNMURRY

Roadworks will operate from 08:00 on Mon 7th Dec 2026 to 18:00 on Fri 11th Dec 2026.
Reason: Resurfacing Works on behalf of DFI roadsTTM - 2-way TL for road end

13/11/2026 09:46:00 : ROADWORKS

U7106, JASMINE CORNER, DUNMURRY - Road closure, U7106, JASMINE CORNER, DUNMURRY

Roadworks will operate from 08:00 on Mon 7th Dec 2026 to 18:00 on Fri 11th Dec 2026.
Reason: Resurfacing Works on behalf of DFI roads
Diversion in place.

Alternative Route Via:
Diversion 1: U7106 GARDENMORE ROAD, U7106 JUNIPER PARK, U7106 JASMINE END, U7106 JASMINE CORNER

13/11/2026 09:46:00 : ROADWORKS

U7006, ADDISON PARK, LISBURN - Lane closure, U7006, ADDISON PARK, LISBURN

38 Addison ParkRoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0811, SICILY PARK, BELFAST - Lane closure, U0811, SICILY PARK, BELFAST

33 Sicily ParkRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0407, MILL ROAD, NEWTOWNABBEY - Lane closure, U0407, MILL ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from 09:30 on Sun 22nd Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: NIW - Full Service Water Connx

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0813, PENGE GARDENS, BELFAST - Lane closure, U0813, PENGE GARDENS, BELFAST

12 Penge GardensRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0002, LURGAN ROAD, DROMORE CO DOWN - Lane closure, B0002, LURGAN ROAD, DROMORE CO DOWN

Works LocationRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Fibre install to customers house, 16 Ballynaris Hill

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0833, BARNETTS ROAD, BELFAST - Lane closure, U0833, BARNETTS ROAD, BELFAST

20 Barnetts RoadRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0177, DRUMALIG ROAD, CARRYDUFF - Road closure, U0177, DRUMALIG ROAD, CARRYDUFF

DRUMALIG ROAD, CARRYDUFFRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: renewal of NIE poles and cable
Diversion in place.

Alternative Route Via:
Diversion 1: A0024 BALLYNAHINCH ROAD, A0024 CARRYDUFF ROAD, B0006 SAINTFIELD ROAD, C0296 DRUMALIG ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0803, ST JAMES PLACE, BELFAST - Lane closure, U0803, ST JAMES PLACE, BELFAST

1 St James PlaceRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0278, LOUGHINISLAND ROAD, LOUGHINISLAND - Lane closure, C0278, LOUGHINISLAND ROAD, LOUGHINISLAND

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 126 Loughinisland Road

13/11/2026 09:46:00 : ROADWORKS

U7531, PARK ROAD, DUNGANNON - One Way closure, U7531, PARK ROAD, DUNGANNON

Roadworks will operate from Tue 10th Nov 2026 to Sat 28th Nov 2026.
Continuously from first day / last day on following times:-
NAReason: Installation of new gas mains
Diversion in place.

Alternative Route Via:
Diversion 1: U7533 VICTORIA ROAD, A0045 MILLTOWN, A0045 MILLTOWN STREET, A0045 BROOKE STREET, A0045 WELLINGTON ROAD, A0029 RANFURLY ROAD, U7536 PERRY STREET

13/11/2026 09:46:00 : ROADWORKS

B0009, DRUMLIN ROAD, DONAGHCLONEY - Lane closure, B0009, DRUMLIN ROAD, DONAGHCLONEY

Work LocationRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Fibre install to 5 Drumlin Road

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0820, REDCAR STREET, BELFAST - Lane closure, U0820, REDCAR STREET, BELFAST

32 Redcar StreetRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0804, BENBURB STREET, BELFAST - Lane closure, U0804, BENBURB STREET, BELFAST

122 Benburb StreetRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0837, EVELYN AVENUE, BELFAST - Road closure, U0837, EVELYN AVENUE, BELFAST

location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW - Separation of Supply
Diversion in place.

Alternative Route Via:
Diversion 1: A0020 UPPER NEWTOWNARDS ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0831, GREENWOOD PARK, BELFAST - Lane closure, U0831, GREENWOOD PARK, BELFAST

14 Greenwood ParkRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0067, BUCKNA ROAD, BALLYMENA - Lane closure, C0067, BUCKNA ROAD, BALLYMENA

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 115 Buckna Road

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0820, HATTON DRIVE, BELFAST - Road closure, U0820, HATTON DRIVE, BELFAST

Location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 WOODSTOCK ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0837, LORD STREET, BELFAST - Lane closure, U0837, LORD STREET, BELFAST

113 Lord Street Roadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0055, KNOCK ROAD, BELFAST - Lane closure, A0055, KNOCK ROAD, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Sun 29th Nov 2026 to 16:30 on Sun 29th Nov 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0632, ROCKVILLE STREET, BELFAST - Lane closure, U0632, ROCKVILLE STREET, BELFAST

21 Rockville StreetRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0025, DUBLIN ROAD, NEWRY KILCOO - Lane closure, A0025, DUBLIN ROAD, NEWRY KILCOO

location of worksRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: NIW - Relevel or Replace Cover and Frame

13/11/2026 09:46:00 : ROADWORKS

U0379, RINGDUFFERIN ROAD, KILLYLEAGH - Road closure, U0379, RINGDUFFERIN ROAD, KILLYLEAGH

Location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW - Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: U0379 RINGDUFFERIN ROAD, U0380 RINGDUFFERIN ROAD

13/11/2026 09:46:00 : ROADWORKS

C0529, DRUMSURN ROAD, LIMAVADY - Lane closure, C0529, DRUMSURN ROAD, LIMAVADY

C0529, DRUMSURN ROAD, DRUMSURNRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Cabling, Splicing & Testing on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

C0530, TERRYDOO ROAD, TERRYDOO - Lane closure, C0530, TERRYDOO ROAD, TERRYDOO

C5030, TERRYDOO ROAD, TERRYDOORoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Cabling, Splicing & Testing on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0812, OSBORNE PARK, BELFAST - Lane closure, U0812, OSBORNE PARK, BELFAST

39 Osborne ParkRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0802, ANDERSONSTOWN PARK WEST, BELFAST - Lane closure, U0802, ANDERSONSTOWN PARK WEST, BELFAST

35 Andersonstown Park WestRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U2055, CROSSKEYS ROAD, GRANGE - Road closure, U2055, CROSSKEYS ROAD, GRANGE

Roadworks will operate from 09:00 on Fri 27th Nov 2026 to 17:00 on Fri 27th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0053 TAYLORSTOWN ROAD, U2054 GRANGE ROAD, U2055 CROSSKEYS ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0806, RIVER CLOSE, BELFAST - Lane closure, U0806, RIVER CLOSE, BELFAST

20 River CloseRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0648, IRIS GROVE, BELFAST - Lane closure, U0648, IRIS GROVE, BELFAST

16 Iris GroveRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0648, CROCUS STREET, BELFAST - Lane closure, U0648, CROCUS STREET, BELFAST

15 Crocus StreetRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0193, MANSE ROAD, COMBER - Road closure, U0193, MANSE ROAD, COMBER

Manse Road closureRoadworks will operate from Thu 26th Nov 2026 to Wed 16th Dec 2026.
Continuously from first day / last day on following times:-
Access maintained for Residents Reason: NIW Watermain extension - extension to existing scheme
Diversion in place.

Alternative Route Via:
Diversion 1: U0193 MANSE ROAD, U0190 CLONTONACALLY ROAD, B0178 COMBER ROAD, A0007 SAINTFIELD ROAD, A0024 SAINTFIELD ROAD

13/11/2026 09:46:00 : ROADWORKS

U8002, CROFT STREET, BANGOR - Lane closure, U8002, CROFT STREET, BANGOR

14 Croft StreetRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0604, FAIRHILL PARK, BELFAST - Lane closure, U0604, FAIRHILL PARK, BELFAST

85 Fairhill ParkRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0077, MANSE ROAD, BALLYCARRY - Lane closure, C0077, MANSE ROAD, BALLYCARRY

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 2 Minnibrook

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0001, MARKET SQUARE SOUTH, LISBURN - Road closure, A0001, MARKET SQUARE, LISBURN

Closure LoactionRoadworks will operate as follows:-
Closure extends to Market Square, Market Square North, Market Square South, Market Square East,
Market Street, Castle Street, Bridge Street
Road closure deployment 1700hrs
Road closure recovery 2200hrsReason: To facilitate public safety at Christmas Lights switch on at Market Square.
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 LINENHALL STREET, A0001 QUEENS ROADDiversion 2: A0001 QUEENS ROAD, A0001 SEYMOUR STREET, A0001 BELFAST ROAD

13/11/2026 09:46:00 : ROADWORKS

C0351, BALLYGOWAN ROAD, BANBRIDGE - Lane closure, C0351, BALLYGOWAN ROAD, BANBRIDGE

Works LocationRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Fibre install to customers house, 90 Ballygowan Road

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0631, MOUNTJOY STREET, BELFAST - Lane closure, U0631, MOUNTJOY STREET, BELFAST

34 Mountjoy StreetRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0615, GLENCAIRN STREET, BELFAST - Lane closure, U0615, GLENCAIRN STREET, BELFAST

27 Glencairn StreetRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0131, TAMNAMORE ROAD, MAGHERY - Lane closure, B0131, TAMNAMORE ROAD, MAGHERY

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Traffic Lights in place for Motorway fencing repair works

13/11/2026 09:46:00 : ROADWORKS

U2130, KNOWEHEAD ROAD, BROUGHSHANE - Road closure, U2130, KNOWEHEAD ROAD, BROUGHSHANE

ClosureRoadworks will operate from Mon 16th Nov 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
Continuous Closure. Brian Patterson has issued this as an emergency as there is little to no support to the roadside on a 40 metre section. Could openreach work within our closure and change diversion route? If not possible please speak to Brian.
Local Access Maintained up to point of Hard Closure.
Advance Notice Boards to be put in place.
Translink and Educational Authority to be notified.Reason: Road Stabilisation
Diversion in place.

Alternative Route Via:
Diversion 1: B0094 KNOCKAN ROAD, U2131 BALLYCLOGHAN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U4033, DEERPARK ROAD, BELFAST - Lane closure, U4033, DEERPARK ROAD, BELFAST

17 Deerpark RoadRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0610, BALHOLM DRIVE, BELFAST - Lane closure, U0610, BALHOLM DRIVE, BELFAST

62 Balholm DriveRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0611, CLIFTONVILLE AVENUE, BELFAST - Lane closure, U0611, CLIFTONVILLE AVENUE, BELFAST

33f 38 Cliftonville AvenueRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0615, GLENCAIRN STREET, BELFAST - Lane closure, U0615, GLENCAIRN STREET, BELFAST

79 Glencairn StreetRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0345, COILY HILL ROAD, SHRIGLEY - Lane closure, U0345, COILY HILL ROAD, SHRIGLEY

location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: NIW - meter works

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0013, BALLYNACOY ROAD, LISBURN - Road closure, C0013, BALLYNACOY ROAD, LISBURN

Road ClosureRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Fibre install to customers house, 11 Ballynacoy Road
Diversion in place.

Alternative Route Via:
Diversion 1: B0038 BELFAST ROAD, C0017 Y BRIDGE ROAD, U2072 MOSS ROAD, C0016 BALLYPITMAVE ROAD, C0017 STONEYFORD ROAD, C0016 TULLYNEWBANK ROAD

13/11/2026 09:46:00 : ROADWORKS

C0640, COOLE ROAD, KILLEEN - Road closure, C0640, COOLE ROAD, KILLEEN

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Required to carry out carriageway re-surfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: B0161 MOUNTJOY ROAD, U1016 BALLYBEG ROAD

13/11/2026 09:46:00 : ROADWORKS

U8024, SPRINGFIELD ROAD, BANGOR - Lane closure, U8024, SPRINGFIELD ROAD, BANGOR

10 Springfield RoadRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0377, TEMPLEBURN ROAD, CROSSGAR - Road closure, U0377, TEMPLEBURN ROAD, CROSSGAR

location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: U0329 TEMPLEBURN ROAD, B0006 MANSE ROAD, C0274 BARNAMAGHERY ROAD

13/11/2026 09:46:00 : ROADWORKS

U8034, CLANMORRIS AVENUE, BANGOR - Lane closure, U8034, CLANMORRIS AVENUE, BANGOR

20 Clanmorris AvenueRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0028, CALEDON ROAD, AUGHNACLOY - Lane closure, A0028, CALEDON ROAD, AUGHNACLOY

Works LocationRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Fibre install to customers house, 145 Caledon Road

13/11/2026 09:46:00 : ROADWORKS

U0221, COOLAGHY ROAD, ARDSTRAW - Road closure, U0221, COOLAGHY ROAD, ARDSTRAW

Roadworks will operate from 00:00 on Sat 7th Nov 2026 to 23:59 on Sat 28th Nov 2026.
Reason: NIE cable laying works
Diversion in place.

Alternative Route Via:
Diversion 1: B0164 DEERPARK ROAD, C0679 MAGHERACOLTAN ROAD, C0679 MILLTOWN ROAD, U0221 COOLAGHY ROAD

13/11/2026 09:46:00 : ROADWORKS

C0680, CARNKENNY ROAD, ARDSTRAW - Road closure, C0680, CARNKENNY ROAD, ARDSTRAW

Roadworks will operate from 00:00 on Sat 7th Nov 2026 to 23:59 on Sat 28th Nov 2026.
Reason: NIE Cable laying works
Diversion in place.

Alternative Route Via:
Diversion 1: B0164 CARNKENNY ROAD, B0164 TIEVENNY ROAD, C0672 GREENVILLE ROAD, C0680 CARNKENNY ROAD, C0680 CREW ROAD, C0672 DRUMCLAMPH ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0839, ONSLOW GARDENS, BELFAST - Road closure, U0839, ONSLOW GARDENS, BELFAST

Road ClosureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0839 SHELBOURNE ROAD, U0839 HADDINGTON GARDENS, C0704 CREGAGH ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0123, MOSS ROAD, BALLYNAHINCH - Road closure, U0123, MOSS ROAD, BALLYNAHINCH

Road ClosureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: Replace or Rebuild Chamber (SV AV FH)
Diversion in place.

Alternative Route Via:
Diversion 1: A0024 BELFAST ROAD, U0123 MOSS ROAD, A0024 MAIN STREET, B0007 CROSSGAR ROAD, C0370 BALLYLONE ROAD

13/11/2026 09:46:00 : ROADWORKS

U2222, COOLAGH ROAD, GREYSTEEL - Road closure, U2222, COOLAGH ROAD, GREYSTEEL

Roadworks will operate from 09:00 on Mon 30th Nov 2026 to 17:00 on Mon 30th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U2222 COOLAGH ROAD, C0518 DUNLADE ROAD, A2002 CLOONEY ROAD

13/11/2026 09:46:00 : ROADWORKS

U5285, HILLHEAD ROAD, NEWRY - Road closure, U5285, HILLHEAD ROAD, NEWRY

HILLHEAD ROAD, NEWRYRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: C0219 FLAGSTAFF ROAD, A0001 DUBLIN ROAD, B0079 DRUMALANE ROAD

13/11/2026 09:46:00 : ROADWORKS

U8034, WHITEHILL AVENUE, BANGOR - Lane closure, U8034, WHITEHILL AVENUE, BANGOR

45 Whitehill AvenueRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0104, LOWER BALLINDERRY ROAD, BALLINDERRY - Lane closure, B0104, LOWER BALLINDERRY ROAD, BALLINDERRY

Location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Meter Works

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0124, CHURCH ROAD, BELFAST - Lane closure, U0124, CHURCH ROAD, BELFAST

Leadhill Primary SchoolRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U4471, MEADOW BANK, BANBRIDGE - Lane closure, U4471, MEADOW BANK, BANBRIDGE

Roadworks will operate from Tue 1st Dec 2026 to Tue 8th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 97 meadow bank as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U0417, CARNREAGH, HILLSBOROUGH - Lane closure, U0417, CARNREAGH, HILLSBOROUGH

CARNREAGH, HILLSBOROUGHRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: removing blockage on BT duct

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0836, GROVE STREET EAST, BELFAST - Road closure, U0836, GROVE STREET EAST, BELFAST

Road ClosureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: Replacement PRV
Diversion in place.

Alternative Route Via:
Diversion 1: U0836 GROVE STREET EAST, U0836 CHANNING STREET, U0836 WAYLAND STREET, A0023 CASTLEREAGH ROAD, U0836 CLARA STREET, B0505 BEERSBRIDGE ROAD

13/11/2026 09:46:00 : ROADWORKS

U6287, ARDAVEEN AVENUE, NEWRY - Lane closure, U6287, ARDAVEEN AVENUE, NEWRY

Roadworks will operate from Mon 30th Nov 2026 to Mon 7th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 23 ardaveen avenue as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U8026, LARAGH PARK, BANGOR - Lane closure, U8026, LARAGH PARK, BANGOR

24 Laragh ParkRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6285, HAWTHORN HILL, NEWRY - Lane closure, U6285, HAWTHORN HILL, NEWRY

os 51 hawthorn hillRoadworks will operate from Mon 30th Nov 2026 to Mon 7th Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 51 hawthorn hill as per chapter 8

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0836, CLARENDON AVENUE, BELFAST - Road closure, U0836, CLARENDON AVENUE, BELFAST

Location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0836 GRACE AVENUE, U0836 BLOOMFIELD GARDENS, U0836 BLOOMFIELD ROAD

13/11/2026 09:46:00 : ROADWORKS

U0417, ELDERBURN, MOSSLEY - Lane closure, U0417, ELDERBURN, MOSSLEY

10 ElderburnRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0131, KILMORE ROAD, KILMORE CO ARMAGH - Lane closure, B0131, KILMORE ROAD, KILMORE CO ARMAGH

Works LocationRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Fibre install to customers house, 102 Kilmore Road

13/11/2026 09:46:00 : ROADWORKS

U0106, CUMBER ROAD, BALLYNAHINCH - Road closure, U0106, CUMBER ROAD, BALLYNAHINCH

Location of worksRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIW -Replace or Rebuild Chamber
Diversion in place.

Alternative Route Via:
Diversion 1: C0388 DRUMANESS ROAD, A0024 NEWCASTLE ROAD, A0024 DRUMANESS ROAD, B0002 DOWNPATRICK ROAD

13/11/2026 09:46:00 : ROADWORKS

U4129, HEATHERBANK, KINALLEN - Lane closure, U4129, HEATHERBANK, KINALLEN

Location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Install FH

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0303, OLD HOLYWOOD ROAD, BELFAST - Lane closure, C0303, OLD HOLYWOOD ROAD, BELFAST

Lane closureRoadworks will operate as follows:-
10pm - 6amReason: Vodafone - Cabling works

13/11/2026 09:46:00 : ROADWORKS

U1353, ARDMORE CRESCENT, PORTADOWN - Lane closure, U1353, ARDMORE CRESCENT, PORTADOWN

Roadworks will operate from Thu 26th Nov 2026 to Thu 3rd Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 18 ardmore crescent as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U0085, COCHRANSTOWN ROAD, LISBURN - Road closure, U0085, COCHRANSTOWN ROAD, LISBURN

Road ClosureRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: REPAIR COMM
Diversion in place.

Alternative Route Via:
Diversion 1: B0101 LEATHEMSTOWN ROAD, U0080 TULLYRUSK ROAD

13/11/2026 09:46:00 : ROADWORKS

A0002, SHORE ROAD, GREENISLAND - Lane closure, A0002, SHORE ROAD, GREENISLAND

83a Shore Road Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: New gas connection

13/11/2026 09:46:00 : ROADWORKS

U8108, MY LADY'S MILE, HOLYWOOD - Lane closure, U8108, MY LADY'S MILE, HOLYWOOD

Location of worksRoadworks will operate as follows:-
0930 to 1500Reason: Replace or Inst Boundary Box or S Cock

13/11/2026 09:46:00 : ROADWORKS

U1351, ALEXANDRA AVENUE, PORTADOWN - Lane closure, U1351, ALEXANDRA AVENUE, PORTADOWN

os 10 alexandra avenueRoadworks will operate from Thu 26th Nov 2026 to Thu 3rd Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 10 alexandra avenue as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

B0066, RINGSEND ROAD, LIMAVADY - Lane closure, B0066, RINGSEND ROAD, LIMAVADY

B0066, RINGSEND ROAD, LIMAVADYRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Cabling & blowing fibre on the Fibrus network

13/11/2026 09:46:00 : ROADWORKS

U1365, DIVINY DRIVE, PORTADOWN - Lane closure, U1365, DIVINY DRIVE, PORTADOWN

Roadworks will operate from Tue 24th Nov 2026 to Tue 1st Dec 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 1abcd Diviny Drive as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U0042, OLD MOIRA ROAD, LISBURN - Road closure, U0042, OLD MOIRA ROAD, LISBURN

Road ClosureRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: Trial Opening
Diversion in place.

Alternative Route Via:
Diversion 1: U0043 CREWE PARK ROAD, C0015 CREWE ROAD, U0048 CARNKILLY ROAD

13/11/2026 09:46:00 : ROADWORKS

U8003, BALLIGAN GARDENS, BANGOR - Lane closure, U8003, BALLIGAN GARDENS, BANGOR

74 balligan gardensRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6292, ST. CLARES AVENUE, NEWRY - Lane closure, U6292, ST. CLARES AVENUE, NEWRY

Roadworks will operate from Mon 16th Nov 2026 to Mon 23rd Nov 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 38 st Clares avenue as per chapter 8

13/11/2026 09:46:00 : ROADWORKS

U0420, FERNAGH AVENUE, NEWTOWNABBEY - Lane closure, U0420, FERNAGH AVENUE, NEWTOWNABBEY

7 Fernagh AvenueRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0405, BURNEYS LANE, GLENGORMLEY - Lane closure, U0405, BURNEYS LANE, GLENGORMLEY

31 Burneys Lane Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U8007, HENDERSON ROAD, BANGOR - Lane closure, U8007, HENDERSON ROAD, BANGOR

14 Henderson RoadRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0068, BALLYQUIN ROAD, DUNGIVEN - Lane closure, B0068, BALLYQUIN ROAD, DUNGIVEN

B0068, BALLYQUIN ROAD, DUNGIVENRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Cabling on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U0420, KINGS CRESCENT, NEWTOWNABBEY - Lane closure, U0420, KINGS CRESCENT, NEWTOWNABBEY

28 Kings CrescentRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U8034, ABBEY DRIVE, BANGOR - Lane closure, U8034, ABBEY DRIVE, BANGOR

11 Abbey DriveRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0422, BLACKTHORN ROAD, MONKSTOWN - Lane closure, U0422, BLACKTHORN ROAD, MONKSTOWN

7 Blackthorn RoadRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0106, BOVEAN ROAD, DUNGANNON - Lane closure, B0106, BOVEAN ROAD, DUNGANNON

Works LocationRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Fibre install to customers house, 82 Bovean Road

13/11/2026 09:46:00 : ROADWORKS

B0178, HILLSBOROUGH ROAD, COMBER - Lane closure, B0178, HILLSBOROUGH ROAD, COMBER

HILLSBOROUGH ROAD, COMBERRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: renewal of BT pole

13/11/2026 09:46:00 : ROADWORKS

U0118, MONLOUGH ROAD WEST, COMBER - Road closure, U0118, MONLOUGH ROAD WEST, COMBER

MONLOUGH ROAD WEST, COMBERRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: renewal of BT Pole
Diversion in place.

Alternative Route Via:
Diversion 1: U0189 MONLOUGH ROAD, U0216 TULLYHUBBERT ROAD, B0178 HILLSBOROUGH ROAD

13/11/2026 09:46:00 : ROADWORKS

U0071, CROSS LANE, LISBURN - Road closure, U0071, CROSS LANE, LISBURN

CROSS LANE, LISBURNRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: A0003 MOIRA ROAD, U0071 DAGGER ROAD

13/11/2026 09:46:00 : ROADWORKS

A0523, WAVENEY ROAD, BALLYMENA - Road closure, A0523, WAVENEY ROAD, BALLYMENA

Roadworks will operate as follows:-
20:00 TO 06:00 EACH NIGHT
Local residents to be made aware of works
Advanced notice boards to be put in place
Translink to be notifiedReason: INSTALLING NEW IRON WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0523 BRIDGE STREET, A0026 NORTH ROAD, A0042 GALGORM ROAD

13/11/2026 09:46:00 : ROADWORKS

B0096, TOWNHILL ROAD, RASHARKIN - Lane closure, B0096, TOWNHILL ROAD, RASHARKIN

TOWNHILL ROAD, RASHARKINRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: renewal of BT pole

13/11/2026 09:46:00 : ROADWORKS

U0424, BALLYDUFF GARDENS, CARNMONEY - Lane closure, U0424, BALLYDUFF GARDENS, CARNMONEY

22 Ballyduff GardensRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0839, WILLOWHOLME STREET, BELFAST - Road closure, U0839, WILLOWHOLME STREET, BELFAST

Location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW - Separation of Supply
Diversion in place.

Alternative Route Via:
Diversion 1: U0839 WILLOWHOLME STREET, C0704 CREGAGH ROAD, U0303 RAVENHILL AVENUE, U0839 RAVENHILL PARADE

13/11/2026 09:46:00 : ROADWORKS

U0407, LONGLANDS COURT, NEWTOWNABBEY - Lane closure, U0407, LONGLANDS COURT, NEWTOWNABBEY

9 Longlands CourtRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0837, MOORFIELD STREET, BELFAST - Road closure, U0837, MOORFIELD STREET, BELFAST

location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0837 RAVENSCROFT AVENUE

13/11/2026 09:46:00 : ROADWORKS

U8021, SHERWOOD PARK, BANGOR - Lane closure, U8021, SHERWOOD PARK, BANGOR

8 Sherwood ParkRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U1365, DIVINY DRIVE, PORTADOWN - Lane closure, U1365, DIVINY DRIVE, PORTADOWN

Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: NIE Generator Parking

13/11/2026 09:46:00 : ROADWORKS

U1356, WOODHOUSE STREET, PORTADOWN - Lane closure, U1356, WOODHOUSE STREET, PORTADOWN

Roadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIE Generator Parking

13/11/2026 09:46:00 : ROADWORKS

U7106, RAILWAY STREET, DUNMURRY - Road closure, U7106, RAILWAY STREET, DUNMURRY

location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: C0003 UPPER DUNMURRY LANE

13/11/2026 09:46:00 : ROADWORKS

A2002, AGHANLOO ROAD, LIMAVADY - Lane closure, A2002, AGHANLOO ROAD, LIMAVADY

Roadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

B0520, MOOR ROAD, DERNAGH - Lane closure, B0520, MOOR ROAD, DERNAGH

MOOR ROAD, DERNAGHRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: renewal of NIE cable and poles

13/11/2026 09:46:00 : ROADWORKS

U8037, CRANLEY PARK, BANGOR - Lane closure, U8037, CRANLEY PARK, BANGOR

35 Cranley ParkRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U8039, LORD WARDEN'S PARADE, BANGOR - Lane closure, U8039, LORD WARDEN'S PARADE, BANGOR

4 Lord Wardens ParadeRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0298, TULLYARD ROAD, LISBURN - Lane closure, C0298, TULLYARD ROAD, LISBURN

location of worksRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIW works

13/11/2026 09:46:00 : ROADWORKS

U1010, LISNASTRANE ROAD, COALISLAND - Road closure, U1010, SHANLISS ROAD, COALISLAND

LISNASTRANE ROAD, COALISLANDRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: renewal of NIE poles and cable
Diversion in place.

Alternative Route Via:
Diversion 1: U1010 LISNASTRANE ROAD, B0520 MOOR ROAD, B0520 STEWARTSTOWN ROAD

13/11/2026 09:46:00 : ROADWORKS

U0154, GLEN ROAD, LISBURN - Road closure, U0154, GLEN ROAD, LISBURN

location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: C0298 TULLYARD ROAD, C0298 DRUMBO ROAD, B0023 HILLHALL ROAD

13/11/2026 09:46:00 : ROADWORKS

U8025, DELLMOUNT ROAD, BANGOR - Lane closure, U8025, DELLMOUNT ROAD, BANGOR

18 Dellmount RoadRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U8002, SILVERSTREAM PARK, BANGOR - Lane closure, U8002, SILVERSTREAM PARK, BANGOR

7 Silverstream ParkRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0644, OLD EGLISH ROAD, DUNGANNON - Lane closure, C0644, OLD EGLISH ROAD, DUNGANNON

Works LocationRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Fibre install to customers house, 103 Old Eglish Road

13/11/2026 09:46:00 : ROADWORKS

A0002, LARNE ROAD, CARRICKFERGUS - Lane closure, A0002, LARNE ROAD, CARRICKFERGUS

166 Larne RoadRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0410, AGHNATRISK ROAD, LISBURN - Road closure, U0410, AGHNATRISK ROAD, LISBURN

Location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW - Replace or Relevel (SV AV FH) Boxes
Diversion in place.

Alternative Route Via:
Diversion 1: U0410 AGHNATRISK ROAD, U0411 KESH ROAD, U0071 GRAVELHILL ROAD, U0400 BOG ROAD, C0006 HALFTOWN ROAD, C0006 CULCAVY ROAD

13/11/2026 09:46:00 : ROADWORKS

C0290, DEMESNE ROAD, SEAFORDE - Lane closure, C0290, DEMESNE ROAD, SEAFORDE

Works LocationRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Fibre install to customers house, 83 Demesne Road

13/11/2026 09:46:00 : ROADWORKS

U0106, BALLYMULLAN ROAD, CRAWFORDSBURN - Road closure, U0106, BALLYMULLAN ROAD, CRAWFORDSBURN

location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW - Replace or Inst Boundary Box or S Cock
Diversion in place.

Alternative Route Via:
Diversion 1: B0020 BALLYROBERT ROAD, U0106 BALLYMULLAN ROAD

13/11/2026 09:46:00 : ROADWORKS

U2054, GRANGE ROAD, GRANGE - Road closure, U2054, GRANGE ROAD, GRANGE

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U2054 GRANGE ROAD, U2060 GILLISTOWN ROAD, B0052 LARGY ROAD, C0053 TAYLORSTOWN ROAD

13/11/2026 09:46:00 : ROADWORKS

C0283, CHURCHTOWN ROAD, STRANGFORD - Road closure, C0283, CHURCHTOWN ROAD, STRANGFORD

Location of worksRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: NIW - Replace or Inst Boundary Box or S Cock
Diversion in place.

Alternative Route Via:
Diversion 1: C0283 CREW ROAD, C0366 LISMORE ROAD, A0002 ARDGLASS ROAD, A0002 SHORE ROAD, A0025 DOWNPATRICK ROAD, A0025 CASTLEWARD ROAD, C0283 CHURCHTOWN ROAD

13/11/2026 09:46:00 : ROADWORKS

U1317, GLASS MOSS ROAD, GILFORD - Road closure, U1317, GLASS MOSS ROAD, GILFORD

road closure Roadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIE CIVLS AND CCABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U1318 HUNTERS HILL ROAD, U4100 HUNTERS HILL ROAD, U4101 BALLYMACANALLEN ROAD

13/11/2026 09:46:00 : ROADWORKS

U1027, GOUDY BRIDGE ROAD, AGHAGALLON - Road closure, U1027, GOUDY BRIDGE ROAD, AGHAGALLON

road closure Roadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0012 AGHALEE ROAD, B0012 LURGAN ROAD, B0156 WHITEHALL ROAD, B0156 DERRYHIRK ROAD, U1024 FEATHERBED ROAD

13/11/2026 09:46:00 : ROADWORKS

U6065, BARNMEEN ROAD, RATHFRILAND - Road closure, U6065, BARNMEEN ROAD, RATHFRILAND

road closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: UG & OH CABLING
Diversion in place.

Alternative Route Via:
Diversion 1: A0025 NEWRY ROAD, U6067 GREENHILL ROAD, B0007 DRUMLOUGH ROAD

13/11/2026 09:46:00 : ROADWORKS

U1015, AUGHRIMDERG ROAD, STEWARTSTOWN - Road closure, U1015, AUGHRIMDERG ROAD, STEWARTSTOWN

AUGHRIMDERG ROAD, STEWARTSTOWNRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: renewal of NIE poles and NIE cable
Diversion in place.

Alternative Route Via:
Diversion 1: C0640 LISACLARE ROAD, U1014 BALLYGITTLE ROAD

13/11/2026 09:46:00 : ROADWORKS

U6054, DRUMLOUGH SCHOOL ROAD, HILLTOWN - Road closure, U6054, DRUMLOUGH SCHOOL ROAD, HILLTOWN

road closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: UG & OH CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0330 CROSS ROAD, B0025 HILLTOWN ROAD, A0025 DOWNPATRICK STREET, U4405 CADDELLS LANE, U4405 JOHN STREET, B0007 DRUMLOUGH ROAD

13/11/2026 09:46:00 : ROADWORKS

U8038, DUNKELD DRIVE, BANGOR - Lane closure, U8038, DUNKELD DRIVE, BANGOR

1 Dunkeld ParkRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0006, ANTRIM ROAD, NEWTOWNABBEY - Lane closure, A0006, ANTRIM ROAD, NEWTOWNABBEY

ANTRIM ROAD, NEWTOWNABBEYRoadworks will operate from Mon 16th Nov 2026 to Wed 18th Nov 2026.
Continuously from first day / last day on following times:-
installation 0930 first dayReason: installation of BT duct

13/11/2026 09:46:00 : ROADWORKS

A0008, BALLYNURE ROAD, NEWTOWNABBEY - Lane closure, A0008, BALLYNURE ROAD, NEWTOWNABBEY

Work location Roadworks will operate from Mon 30th Nov 2026 to Tue 1st Dec 2026.
Continuously from first day / last day on following times:-
Installed 30.11.26 @09:30 to be removed 01.12.2026 @17:00Reason: Drainage works along road side

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0810, ORPEN PARK, BELFAST - Road closure, U0810, ORPEN PARK, BELFAST

road closure Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 UPPER LISBURN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0001, UPPER LISBURN ROAD, BELFAST - Lane closure, A0001, UPPER LISBURN ROAD, BELFAST

lane closure Roadworks will operate as follows:-
07:00 - 12:00Reason: cabling works

13/11/2026 09:46:00 : ROADWORKS

U0214, MARKET ROAD, NEWRY KILCOO - Road closure, U0214, MARKET ROAD, NEWRY KILCOO

road closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: BT POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0325 MONEYSCALP ROAD, A0025 DUBLIN ROAD

13/11/2026 09:46:00 : ROADWORKS

B0006, SAINTFIELD ROAD, TEMPLE - Lane closure, B0006, SAINTFIELD ROAD, TEMPLE

lane closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: FRAME & COVER

13/11/2026 09:46:00 : ROADWORKS

A0001, A1 DROMORE ROAD, BANBRIDGE - Road closure, A0001, A1 DROMORE ROAD, BANBRIDGE

Right turn lane onto Gracreystown RdRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Right turn lane closure onto Graceystown Rd
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 DROMORE ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 BANBRIDGE BY-PASS OFF-SLIP ROAD (SOUTH BOUND), A0001 DROMORE ROAD, A0026 DROMORE ROAD, A0026 DROMORE STREET, U4072 HILL STREET, U4072 BALLYMONEY ROAD

13/11/2026 09:46:00 : ROADWORKS

B0010, MONTEITH ROAD, ANNACLONE - Lane closure, B0010, MONTEITH ROAD, ANNACLONE

B0010, MONTEITH ROAD, ANNACLONERoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Repairing damaged cable on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U6253, DRUMMANMORE ROAD, KILKEEL - Lane closure, U6253, DRUMMANMORE ROAD, KILKEEL

U6253, DRUMMANMORE ROAD, KILKEELRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Cabling on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U4074, GRACEYSTOWN ROAD, BANBRIDGE - Road closure, U4074, GRACEYSTOWN ROAD, BANBRIDGE

Pole Swap from 7m to 10mRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Pole to be swapped from 7m to 10m to allow for spanning over trees and Housing
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 DROMORE ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1001 DROMORE ROAD DUAL CARRIAGEWAY (NORTH BOUND), U4073 HALFWAY ROAD, C0349 SKELTONS ROAD, U4072 BALLYMONEY ROADDiversion 2: U4072 BALLYMONEY ROAD, U4072 HILL STREET, A0026 DROMORE STREET, A0026 DROMORE ROAD, A0001 DROMORE ROAD, A0001 A1 BANBRIDGE BY-PASS ON-SLIP ROAD (NORTH BOUND), A0001 A1 DROMORE ROAD DUAL CARRIAGEWAY (NORTH BOUND)

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0608, BENVIEW PARK, BELFAST - Road closure, U0608, BENVIEW PARK, BELFAST

Roadworks will operate from 09:00 on Tue 24th Nov 2026 to 17:00 on Fri 4th Dec 2026.
Reason: Lead pipe replacement for NIW
Diversion in place.

Alternative Route Via:
Diversion 1: U0608 BENVIEW PARK, U0200 BALLYSILLAN PARK, A0055 BALLYSILLAN ROAD

13/11/2026 09:46:00 : ROADWORKS

C0288, CRAWFORDSTOWN ROAD, DRUMANESS - Road closure, C0288, CRAWFORDSTOWN ROAD, DRUMANESS

Road ClosureRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Fibre install to customers house, 56A Crawfordsburn Road
Diversion in place.

Alternative Route Via:
Diversion 1: C0288 CRAWFORDSTOWN ROAD, U0138 THE HEIGHTS, C0278 LOUGHINISLAND ROAD, C0278 NEWCASTLE ROAD, A0024 NEWCASTLE ROAD, C0388 DRUMANESS ROAD

13/11/2026 09:46:00 : ROADWORKS

B0007, CROSSGAR ROAD, SHRIGLEY - Lane closure, B0007, CROSSGAR ROAD, SHRIGLEY

Works LocationRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Fibre install to customers house, 49 Crossgar Road

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0619, DUNCRUE STREET, BELFAST - Lane closure, U0619, DUNCRUE STREET, BELFAST

location of worksRoadworks will operate from 09:30 on Fri 1st Jan 2027 to 16:30 on Fri 1st Jan 2027.
Reason: NIE works

13/11/2026 09:46:00 : ROADWORKS

B0025, CASTLEVENNON ROAD, KATESBRIDGE - Road closure, B0025, CASTLEVENNON ROAD, KATESBRIDGE

Location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIW - Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: B0025 KNOCKGORM ROAD, C0328 GALL BOG ROAD, C0310 TULLINISKY ROAD, U4115 TULLINISKY ROAD, C0310 ENAGH ROAD, C0307 KATESBRIDGE ROAD, C0307 KINALLEN ROAD, C0322 GLEN ROAD, C0307 KILKINAMURRY ROAD, A0050 KATESBRIDGE ROAD

13/11/2026 09:46:00 : ROADWORKS

U7017, SKYLINE DRIVE, LISBURN - Lane closure, U7017, SKYLINE DRIVE, LISBURN

2a Skyline Drive Roadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: New gas connection

13/11/2026 09:46:00 : ROADWORKS

A0006, DUBLIN ROAD, ANTRIM - Lane closure, A0006, DUBLIN ROAD, ANTRIM

Roadworks will operate as follows:-
21:00 - 06:00Reason: DFI Roads - Carriageway Patching

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0006, BELMONT ROAD, ANTRIM - Road closure, A0006, BELMONT ROAD, ANTRIM

Roadworks will operate as follows:-
21:00 - 06:00Reason: DFI Roads - Carriageway Patching
Diversion in place.

Alternative Route Via:
Diversion 1: A0006 DUBLIN ROAD, A0006 null, A0522 CASTLE WAY, A0522 FOUNTAIN STREET, U1189 CUNNINGHAM WAY, A0522 BELFAST ROADDiversion 2: A0006 DUBLIN ROAD, C0024 DUBLIN ROAD, C0024 BELFAST ROAD, U1114 ANTRIM ROAD, A0057 AIRPORT ROAD, A0057 BALLYROBIN ROAD, A0006 BELFAST ROAD

13/11/2026 09:46:00 : ROADWORKS

U4018, MAYPOLE ROAD, DROMORE - Road closure, U4018, MAYPOLE ROAD, DROMORE

location of worksRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Sun 6th Dec 2026.
Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: U4018 MAYPOLE ROAD, U4450 MILEBUSH ROAD, C0360 MAGHERABEG ROAD, U4016 MOORFIELD ROAD, C0360 KILNTOWN ROAD, U4017 CONNELLYSTOWN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0006, LISBURN ROAD, SAINTFIELD - Road closure, B0006, LISBURN ROAD, SAINTFIELD

location of worksRoadworks will operate from Thu 7th Jan 2027 to Wed 20th Jan 2027.
Continuously from first day / last day on following times:-
08:00 07-01-2026 - 18:00 20-01-2026Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: B0006 LISBURN ROAD, B0006 SAINTFIELD ROAD, A0024 CARRYDUFF ROAD, A0024 BELFAST ROAD, A0021 SAINTFIELD ROAD, A0021 BALLYNAHINCH ROAD

13/11/2026 09:46:00 : ROADWORKS

U2112, WOODSIDE ROAD, BALLYMENA - Lane closure, U2112, WOODSIDE ROAD, BALLYMENA

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

C0263, WHINNEY HILL, NEWTOWNARDS - Lane closure, C0263, WHINNEY HILL, NEWTOWNARDS

Roadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Felling trees along the roadside

13/11/2026 09:46:00 : ROADWORKS

U0400, BLARIS ROAD, LISBURN - Lane closure, U0400, BLARIS ROAD, LISBURN

Location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: NIW - Repair or Replace C + F

13/11/2026 09:46:00 : ROADWORKS

U1010, TUMPHER ROAD, COALISLAND - Road closure, U1010, TUMPHER ROAD, COALISLAND

Closure locationRoadworks will operate as follows:-
0930hrs - 1200hrs
Race start 10amReason: To ensure the safety of road users and runners during local running event
Diversion in place.

Alternative Route Via:
Diversion 1: C0636 MULLAGHMOYLE ROAD, U1010 MOUSETOWN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0137, BALLYHANWOOD ROAD, BELFAST - Road closure, U0137, BALLYHANWOOD ROAD, BELFAST

Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: U0137 BALLYHANWOOD ROAD, C0265 OLD DUNDONALD ROAD, C0265 KINGS ROAD, C0269 GILNAHIRK ROAD, U0196 GILNAHIRK ROAD WEST

13/11/2026 09:46:00 : ROADWORKS

B0079, PATRICK STREET, NEWRY - Lane closure, B0079, PATRICK STREET, NEWRY

PATRICK STREET, NEWRYRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: installation of NIE duct

13/11/2026 09:46:00 : ROADWORKS

U0203, BALLYMURPHY ROAD, LISBURN - Road closure, U0203, BALLYMURPHY ROAD, LISBURN

BALLYMURPHY ROAD, LISBURNRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: U0204 CARGYGRAY ROAD, C0294 BURN ROAD, B0177 BALLYNAHINCH ROAD

13/11/2026 09:46:00 : ROADWORKS

A0002, WARREN ROAD, DONAGHADEE - Lane closure, A0002, WARREN ROAD, DONAGHADEE

Roadworks will operate from Mon 9th Nov 2026 to Mon 30th Nov 2026.
Continuously from first day / last day on following times:-
Continuously from 08:00 on 09.11.26 to 16:00 on 30.11.26Reason: NI Water sewer installation

13/11/2026 09:46:00 : ROADWORKS

U6224, DRUMCRO ROAD, KILKEEL - Road closure, U6224, DRUMCRO ROAD, KILKEEL

DRUMCRO ROAD, KILKEELRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: renewal of BT poles
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 NEWRY ROAD, A0002 NEWRY STREET, A0002 THE SQUARE, B0027 MOUNTAIN ROADDiversion 2:

13/11/2026 09:46:00 : ROADWORKS

B0003, PLANTATION ROAD, BLEARY - Lane closure, B0003, PLANTATION ROAD, BLEARY

Works LocationRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Fibre install to customers house, 122 Plantation Road

13/11/2026 09:46:00 : ROADWORKS

U1009, COLLIERS LANE, COALISLAND - Road closure, U1009, COLLIERS LANE, COALISLAND

Closure locationRoadworks will operate as follows:-
0930hrs - 1200hrs
Race Start 10amReason: To ensure the safety of road users and runners during local running event
Diversion in place.

Alternative Route Via:
Diversion 1: C0636 MULLAGHMOYLE ROAD, C0638 BRACKAVILLE ROAD, C0638 BARRACK STREET, B0520 THE SQUARE, B0520 MAIN STREET, B0520 STEWARTSTOWN ROAD

13/11/2026 09:46:00 : ROADWORKS

U6132, ISLAND ROAD, ATTICAL - Road closure, U6132, ISLAND ROAD, ATTICAL

ISLAND ROAD, KILKEELRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: renewal of BT pole
Diversion in place.

Alternative Route Via:
Diversion 1: C0318 TULLYFRAME ROAD, U6131 ATTICAL ROAD

13/11/2026 09:46:00 : ROADWORKS

B0118, WOODVALE ROAD, EGLINTON - Lane closure, B0118, WOODVALE ROAD, EGLINTON

Roadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

U0400, BLARIS ROAD, LISBURN - Lane closure, U0400, BLARIS ROAD, LISBURN

location of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: NIW - Repair or Replace Cover + Frame

13/11/2026 09:46:00 : ROADWORKS

U0209, BALLYKEIGLE ROAD, BALLYGOWAN - Road closure, U0209, BALLYKEIGLE ROAD, BALLYGOWAN

Roadworks will operate from 09:00 on Tue 24th Nov 2026 to 17:00 on Tue 24th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U0209 BALLYKEIGLE ROAD, U0207 TULLYNAGEE ROAD, U0199 LISBARNET ROAD, C0367 MOSS ROAD

13/11/2026 09:46:00 : ROADWORKS

B0520, STEWARTSTOWN ROAD, COALISLAND - Road closure, B0520, STEWARTSTOWN ROAD, COALISLAND

Closure LocationRoadworks will operate as follows:-
0930hrs - 1200hrs
Race Start 10amReason: To ensure the safety of road users and runners during local running event
Diversion in place.

Alternative Route Via:
Diversion 1: B0520 STEWARTSTOWN ROAD, B0161 ANNAGHER ROAD, B0161 MOOR ROAD, B0520 MOOR ROAD

13/11/2026 09:46:00 : ROADWORKS

U0040, LISGLASS ROAD, BALLYCLARE - Lane closure, U0040, LISGLASS ROAD, BALLYCLARE

Works LocationRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Fibre install to customers house, 18 Lisglass Road

13/11/2026 09:46:00 : ROADWORKS

A0501, SHEEPWALK ROAD, LISBURN - Lane closure, A0501, SHEEPWALK ROAD, LISBURN

location of worksRoadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW -Replace or Inst Boundary Box or S Cock

13/11/2026 09:46:00 : ROADWORKS

U8106, SPENCER STREET, HOLYWOOD - Road closure, U8106, SPENCER STREET, HOLYWOOD

SPENCER STREET, HOLYWOODRoadworks will operate as follows:-
0700 - 1200 (noon)Reason: installation of BT duct on footway
Diversion in place.

Alternative Route Via:
Diversion 1: U8106 DOWNSHIRE ROAD, U8106 CHURCH VIEW

13/11/2026 09:46:00 : ROADWORKS

U4035, DRUMILLER HILL, LARNE - Road closure, U4035, DRUMILLER HILL, LARNE

Location of worksRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: NIW - Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: U4037 LAGANGREEN ROAD, C0309 BLACK BOG ROAD, C0309 DROMARA ROAD

13/11/2026 09:46:00 : ROADWORKS

A0021, NEWTOWNARDS ROAD, BANGOR - Lane closure, A0021, NEWTOWNARDS ROAD, BANGOR

Roadworks will operate from 09:30 on Wed 6th Jan 2027 to 16:30 on Fri 8th Jan 2027.
Reason: Telecoms Works

13/11/2026 09:46:00 : ROADWORKS

U1120, DERRYOGHILL ROAD, BLACKWATERTOWN - Road closure, U1120, DERRYOGHILL ROAD, BLACKWATERTOWN

road closure Roadworks will operate from 09:00 on Mon 30th Nov 2026 to 17:00 on Mon 30th Nov 2026.
Reason: nie civils and cabling works
Diversion in place.

Alternative Route Via:
Diversion 1: U1120 DRUMLEE ROAD, U6657 DRUMLEE ROAD, B0106 BENBURB ROAD

13/11/2026 09:46:00 : ROADWORKS

U6169, TAMNAHARRY HILL, MAYOBRIDGE - Road closure, U6169, TAMNAHARRY HILL, MAYOBRIDGE

ROAD CLOSURERoadworks will operate from 08:00 on Fri 27th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0007 CHAPEL HILL, U6170 MAYO ROAD

13/11/2026 09:46:00 : ROADWORKS

C0315, LONGSTONE ROAD, ANNALONG - Road closure, C0315, LONGSTONE ROAD, ANNALONG

road closure Roadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIE CIVILS & CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0315 BALLYVEAGHMORE ROAD, C0313 HEAD ROAD, U6199 OLDTOWN ROAD

13/11/2026 09:46:00 : ROADWORKS

U7660, IRISH STREET, RICHHILL - Lane closure, U7660, IRISH STREET, RICHHILL

lane closureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS

13/11/2026 09:46:00 : ROADWORKS

C0335, CULLION ROAD, MAYOBRIDGE - Road closure, C0335, CULLION ROAD, MAYOBRIDGE

road closure Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: NIE CIVILS & CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0007 BAVAN ROAD, U6071 BALLYKEEL ROAD, U6070 BALLYKEEL ROAD, U6069 OLD NEWRY ROAD

13/11/2026 09:46:00 : ROADWORKS

C0207, SEAGAHAN ROAD, ARMAGH - Road closure, C0207, SEAGAHAN ROAD, ARMAGH

road closureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: oh & ug cabling works
Diversion in place.

Alternative Route Via:
Diversion 1: U8241 CARNAVANAGHAN ROAD, C0206 REDROCK ROAD, U8015 KILLEEN ROAD, C0202 KILLYCAPPLE ROAD, A0028 MARKETHILL ROAD, A0028 NEWRY ROAD

13/11/2026 09:46:00 : ROADWORKS

C0206, REDROCK ROAD, ARMAGH - Road closure, C0206, REDROCK ROAD, ARMAGH

road closure Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: oh & ug cabling works
Diversion in place.

Alternative Route Via:
Diversion 1: C0207 SEAGAHAN ROAD, U8241 CARNAVANAGHAN ROAD

13/11/2026 09:46:00 : ROADWORKS

A0051, HAMILTONSBAWN ROAD, ARMAGH - Lane closure, A0051, HAMILTONSBAWN ROAD, ARMAGH

LANE CLOSURE Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: UG & OH CABLING WORKS

13/11/2026 09:46:00 : ROADWORKS

U7754, BRYANDRUM ROAD, MARKETHILL - Road closure, U7754, BRYANDRUM ROAD, MARKETHILL

road closure Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Sat 28th Nov 2026.
Reason: oh & ug cabling works
Diversion in place.

Alternative Route Via:
Diversion 1: B0003 TANDRAGEE ROAD, A0028 GOSFORD ROAD, B0078 MULLAGHBRACK ROAD, B0111 MULLAGHBRACK ROAD, U7751 TANNAGHMORE ROAD

13/11/2026 09:46:00 : ROADWORKS

C0077, BALLYPOLLARD ROAD, LARNE - Lane closure, C0077, BALLYPOLLARD ROAD, LARNE

Work locationRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

C0321, NEWTOWN ROAD, ROSTREVOR - Lane closure, C0321, NEWTOWN ROAD, ROSTREVOR

Newtown Road, Rostrevor Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

C0254, BALLYBLACK ROAD, CARROWDORE - Lane closure, C0254, BALLYBLACK ROAD, CARROWDORE

Ballyblack Road, Carrowdore Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

B0114, TANNYOKY ROAD, POYNTZPASS - Lane closure, B0114, TANNYOKY ROAD, POYNTZPASS

Tannyoky Road, Poyntzpass Roadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

U0118, MAGHERATIMPANY ROAD, DRUMANESS - Road closure, U0118, CHERRYHILL ROAD, DRUMANESS

Work location Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: New connection for customer
Diversion in place.

Alternative Route Via:
Diversion 1: U0383 CHERRYHILL ROAD, C0291 DRUMSNADE ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0800, HANNAHSTOWN HILL, BELFAST - Lane closure, U0800, HANNAHSTOWN HILL, BELFAST

LANE CLOSURERoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: CABLING WORKS

13/11/2026 09:46:00 : ROADWORKS

A0042, CARNLOUGH ROAD, BROUGHSHANE - Lane closure, A0042, CARNLOUGH ROAD, BROUGHSHANE

Carnlough Road, Aughafatten Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

U8103, BROOK STREET, HOLYWOOD - Road closure, U8103, BROOK STREET, HOLYWOOD

road closure Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U8102 VICTORIA ROAD, B0198 HIGH STREET, C0303 CHURCH ROAD

13/11/2026 09:46:00 : ROADWORKS

A0020, PORTAFERRY ROAD, NEWTOWNARDS - Lane closure, A0020, PORTAFERRY ROAD, NEWTOWNARDS

lane closureRoadworks will operate from 08:00 on Mon 11th Jan 2027 to 18:00 on Fri 22nd Jan 2027.
Reason: OH & UG CABLING WORKS

13/11/2026 09:46:00 : ROADWORKS

U6291, MOOR HILL ROAD, NEWRY - Road closure, U6291, MOOR HILL ROAD, NEWRY

road closure Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: CIVILS WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U6291 COMMONS SCHOOL ROAD, C0333 CHAPEL ROAD, C0333 UPPER CHAPEL STREET, C0333 CHAPEL STREET, C0333 BOAT STREET, U6290 COURTNEY HILL, U6290 BALLYHOLLAND ROAD

13/11/2026 09:46:00 : ROADWORKS

U4147, HUNTLY ROAD, LENADERG - Lane closure, U4147, HUNTLY ROAD, LENADERG

Work locationRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

A0003, LURGAN ROAD, MOIRA - Lane closure, A0003, LURGAN ROAD, MOIRA

lane closureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: FRAME & COVER

13/11/2026 09:46:00 : ROADWORKS

U7751, TANNAGHMORE ROAD, MARKETHILL - Road closure, U7751, TANNAGHMORE ROAD, MARKETHILL

road closure Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U7753 null, B0003 TANDRAGEE ROAD, C0176 MAGHERYDOGHERTY ROAD

13/11/2026 09:46:00 : ROADWORKS

B0114, TANNYOKY ROAD, POYNTZPASS - Lane closure, B0114, TANNYOKY ROAD, POYNTZPASS

lane closure Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: PIDOC

13/11/2026 09:46:00 : ROADWORKS

B0068, BALLYQUIN ROAD, LIMAVADY - Lane closure, B0068, BALLYQUIN ROAD, LIMAVADY

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

C0307, KATESBRIDGE ROAD, KINALLEN - Road closure, C0307, KATESBRIDGE ROAD, KINALLEN

Road ClosureRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: REPLACE FH
Diversion in place.

Alternative Route Via:
Diversion 1: C0310 ENAGH ROAD, C0308 GROVE ROAD, C0323 SLIEVENABOLEY ROAD, B0007 RATHFRILAND ROAD, B0007 MONEYSLANE ROAD, A0050 KATESBRIDGE ROAD, C0307 KILKINAMURRY ROAD, C0322 GLEN ROAD, C0307 KINALLEN ROAD, C0307 KATESBRIDGE ROAD

13/11/2026 09:46:00 : ROADWORKS

U3565, GLEBE CRESCENT, CASTLEROCK - Lane closure, U3565, GLEBE CRESCENT, CASTLEROCK

Roadworks will operate from 09:30 on Fri 13th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0844, MEADOWBANK STREET, BELFAST - Road closure, U0844, MEADOWBANK STREET, BELFAST

Road ClosureRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0844 null, U0844 GREAT NORTHERN STREET, U0844 LOWER WINDSOR AVENUE

13/11/2026 09:46:00 : ROADWORKS

B0007, RATHFRILAND ROAD, DROMORE - Lane closure, B0007, RATHFRILAND ROAD, DROMORE

Location of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Replace or Inst Boundary Box or S Cock

13/11/2026 09:46:00 : ROADWORKS

C0155, KNOCK ROAD, PORTADOWN - Lane closure, C0155, KNOCK ROAD, PORTADOWN

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Fibre install for customer

13/11/2026 09:46:00 : ROADWORKS BELFAST

U8105, SULLIVAN PLACE, HOLYWOOD - One Way closure, U8105, SULLIVAN PLACE, HOLYWOOD

Road ClosureRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace or Inst Boundary Box or S Cock
Diversion in place.

Alternative Route Via:
Diversion 1: B0198 HIGH STREET, B0198 BELFAST ROAD, A0002 null, A0002 HOLYWOOD BY-PASS

13/11/2026 09:46:00 : ROADWORKS

U3110, MADIGAN PARK, CARRICKFERGUS - Lane closure, U3110, MADIGAN PARK, CARRICKFERGUS

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0265, SANDOWN ROAD, BELFAST - Lane closure, C0265, SANDOWN ROAD, BELFAST

Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0828, GARNERVILLE ROAD, BELFAST - Lane closure, U0828, GARNERVILLE ROAD, BELFAST

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: NIE Substation Maintenance

13/11/2026 09:46:00 : ROADWORKS

U7101, COLINVALE, DUNMURRY - Lane closure, U7101, COLINVALE, DUNMURRY

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0839, LISMAIN STREET, BELFAST - Lane closure, U0839, LISMAIN STREET, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7117, KILLUNEY ROAD, ARMAGH - Lane closure, U7117, KILLUNEY ROAD, ARMAGH

Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0815, FLORENCEVILLE AVENUE, BELFAST - Lane closure, U0815, FLORENCEVILLE AVENUE, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7012, LINSEYS HILL, ARMAGH - Road closure, U7012, LINSEYS HILL, ARMAGH

Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: NIE Overhead Line Work & Crane Parking
Diversion in place.

Alternative Route Via:
Diversion 1: U7012 LINSEYS HILL, U7012 LINSEY'S HEIGHTS, U7012 KILLUNEY MEADOWS

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0500, KILWARLIN CRESCENT, BELFAST - Lane closure, U0500, KILWARLIN CRESCENT, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0512, GLENHOLM DRIVE, BELFAST - Lane closure, U0512, GLENHOLM DRIVE, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0024, SAINTFIELD ROAD, BELFAST - Lane closure, A0024, SAINTFIELD ROAD, BELFAST

Roadworks will operate as follows:-
9.30 - 16.00Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0511, GREER PARK HEIGHTS, BELFAST - Lane closure, U0511, GREER PARK HEIGHTS, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A0003, PORTADOWN ROAD, ARMAGH - Lane closure, A0003, PORTADOWN ROAD, ARMAGH

Roadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0512, GLENHOLM AVENUE, BELFAST - Lane closure, U0512, GLENHOLM AVENUE, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7026, HOLBORN HALL, LISBURN - Lane closure, U7026, HOLBORN HALL, LISBURN

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7105, RIVER COURT, DUNMURRY - Lane closure, U7105, RIVER COURT, DUNMURRY

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U7108, LAGMORE DRIVE, BELFAST - Lane closure, U7108, LAGMORE DRIVE, BELFAST

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U0524, TERRYGLASSOG ROAD, EGLISH - Road closure, U0524, TERRYGLASSOG ROAD, EGLISH

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Fibre Install for customers
Diversion in place.

Alternative Route Via:
Diversion 1: B0045 EGLISH ROAD, C0646 KILLYLISS ROAD, U0520 CADIAN ROAD, U0522 CADIAN ROAD, U0522 null

13/11/2026 09:46:00 : ROADWORKS

A0027, SCARVA ROAD, TANDRAGEE - Road closure, A0027, TANDRAGEE ROAD, TANDRAGEE

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Surfacing Works & PatchingLocal-Residential Access Maintained
Diversion in place.

Alternative Route Via:
Diversion 1: A0027 TANDRAGEE ROAD, A0027 CHAPEL STREET, A0027 CHURCH STREET, A0027 NEWRY ROAD, A0028 ARMAGH ROAD, A0028 GOSFORD ROAD, B0003 TANDRAGEE ROAD, B0003 MARKETHILL ROAD

13/11/2026 09:46:00 : ROADWORKS

A0049, OLD BALLYNAHINCH ROAD, LISBURN - Lane closure, A0049, OLD BALLYNAHINCH ROAD, LISBURN

A0049, OLD BALLYNAHINCH ROAD, LISBURNRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Test Rod and Roping with Possible Minor Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

A0026, DROMORE ROAD, BANBRIDGE - Road closure, A0026, DROMORE ROAD, BANBRIDGE

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Surfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 DROMORE ROAD, A0001 A1 BANBRIDGE BY-PASS ON-SLIP ROAD (SOUTH BOUND), A0001 A1 BANBRIDGE BY-PASS OFF-SLIP ROAD (NORTH BOUND), A0001 A1 DROMORE ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 DROMORE ROAD DUAL CARRIAGEWAY (SOUTH BOUND), B0010 A1 DROMORE ROAD ON-SLIP ROAD (NORTH BOUND), B0010 A1 DROMORE ROAD OFF-SLIP ROAD (SOUTH BOUND), B0010 RATHFRILAND ROAD, U4465 KENLIS STREET, B0010 RATHFRILAND STREET, A0026 NEWRY STREET, A0026 NEWRY ROAD, A0026 BRIDGE STREET, A0026 CHURCH SQUARE, A0026 DROMORE STREET, A0050 CASTLEWELLAN ROADDiversion 2: U4147 DOWNSHIRE ROAD, U4470 DOWNSHIRE PLACE, B0010 SCARVA STREET, U4469 COMMERCIAL ROAD, C0351 COMMERCIAL ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0269, GILNAHIRK ROAD, BELFAST - Lane closure, C0269, GILNAHIRK ROAD, BELFAST

C0269, GILNAHIRK ROAD, BELFASTRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Test Rod and Roping with Possible Minor Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

A0051, TANDRAGEE ROAD, GILFORD - Lane closure, A0051, TANDRAGEE ROAD, GILFORD

Works locationRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0270, GRANSHA ROAD, BELFAST - Lane closure, C0270, GRANSHA ROAD, BELFAST

C0270, GRANSHA ROAD, BELFASTRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Test Rod and Roping with Possible Minor Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

A0023, BALLYGOWAN ROAD, CROSSNACREEVY - Lane closure, A0023, BALLYGOWAN ROAD, CROSSNACREEVY

A0023, BALLYGOWAN ROAD, CROSSNACREEVYRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Test Rod and Roping with Possible Minor Excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

C0278, LOUGHINISLAND ROAD, LOUGHINISLAND - Lane closure, C0278, LOUGHINISLAND ROAD, LOUGHINISLAND

Loughinisland Road, Loughinisland Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

B0007, RATHFRILAND ROAD, MONEYSLANE - Lane closure, B0007, RATHFRILAND ROAD, MONEYSLANE

Moneyslane Road, Moneyslane Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

A0005, BELTANY ROAD, MOUNTJOY - Lane closure, A0005, BELTANY ROAD, MOUNTJOY

Roadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: PMCL drain cleaning and tree mulching

13/11/2026 09:46:00 : ROADWORKS

B0053, FERNISKY ROAD, KELLS - Lane closure, B0053, FERNISKY ROAD, KELLS

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

C0045, STEEPLE ROAD, KELLS - Lane closure, C0045, STEEPLE ROAD, KELLS

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0270, KNOCKBRACKEN ROAD, BELFAST - Lane closure, C0270, KNOCKBRACKEN ROAD, BELFAST

C0270, KNOCKBRACKEN ROAD, BELFASTRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Testing, Rodding & Roping and Civils on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0520, BALLYBEEN PARK, BELFAST - Lane closure, U0520, BALLYBEEN PARK, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0125, LOWER BRANIEL ROAD, BELFAST - Lane closure, U0125, LOWER BRANIEL ROAD, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0504, WARREN GROVE, BELFAST - Lane closure, U0504, WARREN GROVE, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0836, ABETTA PARADE, BELFAST - Lane closure, U0836, ABETTA PARADE, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS

C0300, CARR ROAD, LISBURN - Lane closure, C0300, CARR ROAD, LISBURN

C0300, CARR ROAD, LISBURNRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0828, GLENDHU GROVE, BELFAST - Lane closure, U0828, GLENDHU GROVE, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS

B0178, COMBER ROAD, LISBURN - Lane closure, B0178, COMBER ROAD, LISBURN

B0178, COMBER ROAD, LISBURNRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0836, GLENBROOK AVENUE, BELFAST - Lane closure, U0836, GLENBROOK AVENUE, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0836, NENDRUM GARDENS, BELFAST - Lane closure, U0836, NENDRUM GARDENS, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0835, ORANGEFIELD DRIVE SOUTH, BELFAST - Lane closure, U0835, ORANGEFIELD DRIVE SOUTH, BELFAST

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6105, GLENLOUGH, BALLYNAHINCH - Lane closure, U6105, GLENLOUGH, BALLYNAHINCH

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

C0388, DRUMANESS ROAD, DRUMANESS - Lane closure, C0388, DRUMANESS ROAD, DRUMANESS

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U4451, BISHOPSHILL, DROMORE CO DOWN - Lane closure, U4451, BISHOPSHILL, DROMORE CO DOWN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6103, BRIAN DRIVE, BALLYNAHINCH - Lane closure, U6103, BRIAN DRIVE, BALLYNAHINCH

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6105, LOUGHSIDE DRIVE, BALLYNAHINCH - Lane closure, U6105, LOUGHSIDE DRIVE, BALLYNAHINCH

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7850, GLENVIEW, LISBURN - Lane closure, U7850, GLENVIEW, LISBURN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0118, WOODVALE ROAD, EGLINTON - Lane closure, B0118, WOODVALE ROAD, EGLINTON

Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS

U7109, BEECHILL GROVE, LISBURN - Lane closure, U7109, BEECHILL GROVE, LISBURN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0015, CLARE ROAD, BALLYCASTLE - Lane closure, B0015, CLARE ROAD, BALLYCASTLE

lane closure Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: BT POLING WORKS

13/11/2026 09:46:00 : ROADWORKS

U7013, BEECHDENE DRIVE, LISBURN - Lane closure, U7013, BEECHDENE DRIVE, LISBURN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6103, QUOILE TERRACE, BALLYNAHINCH - Lane closure, U6103, QUOILE TERRACE, BALLYNAHINCH

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U4453, CASTLE WOOD, DROMORE CO DOWN - Lane closure, U4453, CASTLE WOOD, DROMORE CO DOWN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U6106, ASHBURN, BALLYNAHINCH - Lane closure, U6106, ASHBURN, BALLYNAHINCH

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0818, RUTLAND STREET, BELFAST - Road closure, U0818, RUTLAND STREET, BELFAST

Location of worksRoadworks will operate from Mon 21st Dec 2026 to Wed 23rd Dec 2026.
Continuously from first day / last day on following times:-
08:00 21-12-2026 - 18:00 23-12-2026Reason: NIW -NEW SEWER CONNECTION
Diversion in place.

Alternative Route Via:
Diversion 1: U0818 BALFOUR AVENUE, U0818 HATFIELD STREET, A0024 ORMEAU ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0021, NEWTOWNARDS ROAD, BANGOR - Lane closure, A0021, BELFAST ROAD, BANGOR

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace or Relevel (SV AV FH) Boxes

13/11/2026 09:46:00 : ROADWORKS

U8016, PRIMROSE STREET, BANGOR - Road closure, U8016, PRIMROSE STREET, BANGOR

Location of worksRoadworks will operate from Mon 4th Jan 2027 to Fri 8th Jan 2027.
Continuously from first day / last day on following times:-
0930 04-01-27 - 1600 08-01-27Reason: NIW - NEW SEWER CONNECTION
Diversion in place.

Alternative Route Via:
Diversion 1: U8016 PRIMROSE AVENUE, B0020 GRAY'S HILL, B0020 PRINCETOWN ROAD, U8004 DUFFERIN AVENUE, U8016 CENTRAL AVENUE, U8016 SOUTHWELL ROADDiversion 2: B0020 GRAY'S HILL, U8016 SOUTHWELL ROAD

13/11/2026 09:46:00 : ROADWORKS

U7023, BURNBRAE AVENUE, LISBURN - Road closure, U7023, BURNBRAE AVENUE, LISBURN

Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: B0023 HILLHALL ROAD

13/11/2026 09:46:00 : ROADWORKS

U0023, BALLYCOLIN ROAD, DUNMURRY - Road closure, U0023, BALLYCOLIN ROAD, DUNMURRY

Road ClosureRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: Full Service Water Connection
Diversion in place.

Alternative Route Via:
Diversion 1: B0038 HANNAHSTOWN ROAD, U0035 RUSHEYHILL ROAD, U0023 FLOWBOG ROAD, U0023 BALLYCOLIN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0055, BELVOIR ROAD, BELFAST - Lane closure, A0055, BELVOIR ROAD, BELFAST

Roadworks will operate as follows:-
Daily - 09:30 to 15:00Reason: Telecoms Works

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0635, LA SALLE GARDENS, BELFAST - Lane closure, U0635, LA SALLE GARDENS, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS

C0298, DRUMBO ROAD, LISBURN - Road closure, C0298, DRUMBO ROAD, LISBURN

Road ClosureRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: Full Service Water Connection
Diversion in place.

Alternative Route Via:
Diversion 1: C0298 DRUMBO ROAD, U0123 PINEHILL ROAD, B0023 BALLYLESSON ROAD

13/11/2026 09:46:00 : ROADWORKS

B0113, DUBLIN ROAD, NEWRY - Lane closure, B0113, DUBLIN ROAD, NEWRY

Work locationRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS

U7000, BLARIS PARK, LISBURN - Road closure, U7000, BLARIS PARK, LISBURN

Location of worksRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: NIW - Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U7000 BLARIS PARK, U7000 AVONMORE PARK

13/11/2026 09:46:00 : ROADWORKS

U0111, SPRINGWELL ROAD, GROOMSPORT - Road closure, U0111, SPRINGWELL ROAD, GROOMSPORT

Road ClosureRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0111 SPRINGWELL ROAD, B0021 HIGH BANGOR ROAD, U0133 KYLESTONE ROAD, U0133 LOWER BALLOO ROAD, A0002 DONAGHADEE ROAD, A0002 GROOMSPORT BY-PASS

13/11/2026 09:46:00 : ROADWORKS

U1131, DUNDESERT ROAD, CRUMLIN - Road closure, U1131, DUNDESERT ROAD, CRUMLIN

DUNDESERT ROAD, CRUMLINRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: A0052 NUTTS CORNER ROAD, A0026 MOIRA ROAD, A0026 TULLY ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0024, BELFAST ROAD, BALLYNAHINCH - Lane closure, A0024, BELFAST ROAD, BALLYNAHINCH

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Repair Gravity Sewer

13/11/2026 09:46:00 : ROADWORKS

U4085, UPPER CROSS STREET, LARNE - Lane closure, U4085, UPPER CROSS STREET, LARNE

Location of worksRoadworks will operate as follows:-
Sun 22 Nov 2026 : 08:00 - 13:00.Reason: Replace or Relevel SV AV FH Box

13/11/2026 09:46:00 : ROADWORKS

U0424, WOODFORD PARK EAST, CARNMONEY - Road closure, U0424, WOODFORD PARK EAST, CARNMONEY

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIE Parking of a crane and vans for substation works
Diversion in place.

Alternative Route Via:
Diversion 1: U0424 WOODFORD PARK, U0424 WOODFORD AVENUE

13/11/2026 09:46:00 : ROADWORKS

B0016, MILLFORT DRIVE, KILLYRAMMER - Lane closure, B0016, MILLFORT DRIVE, KILLYRAMMER

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE - Generator Parking

13/11/2026 09:46:00 : ROADWORKS

B0016, KILRAUGHTS ROAD, KILLYRAMMER - Lane closure, B0016, KILRAUGHTS ROAD, KILLYRAMMER

Lane closureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE - Generator Parking

13/11/2026 09:46:00 : ROADWORKS

U0325, BALLYMACREELLY ROAD, KILLINCHY - Road closure, U0325, BALLYMACREELLY ROAD, KILLINCHY

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: BT Openreach New Connection
Diversion in place.

Alternative Route Via:
Diversion 1: C0271 SAINTFIELD ROAD, U0326 BALLYMACASHEN ROAD, C0273 THORNYHILL ROAD

13/11/2026 09:46:00 : ROADWORKS

B0001, ARDGLASS ROAD, DOWNPATRICK - Lane closure, B0001, ARDGLASS ROAD, DOWNPATRICK

location of worksRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW works

13/11/2026 09:46:00 : ROADWORKS

B0020, CRAWFORDSBURN ROAD, BANGOR - Lane closure, B0020, RATHMORE ROAD, BANGOR

location of worksRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW - Replace or Relevel SV AV FH Box

13/11/2026 09:46:00 : ROADWORKS

C0267, TULLYNAKILL ROAD, KILLINCHY - Road closure, C0267, TULLYNAKILL ROAD, KILLINCHY

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: BT Openreach New Connection
Diversion in place.

Alternative Route Via:
Diversion 1: C0267 null, C0267 BALLYDRAIN ROAD, A0022 KILLINCHY ROAD, U0257 ARDMILLAN ROAD, U0257 TULLYNAKILL ROAD, C0267 TULLYNAKILL ROAD

13/11/2026 09:46:00 : ROADWORKS

A0002, CLANMAGHERY ROAD, DOWNPATRICK - Lane closure, A0002, CLANMAGHERY ROAD, DOWNPATRICK

location of worksRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW works

13/11/2026 09:46:00 : ROADWORKS

B0027, MOYAD ROAD, ATTICAL - Lane closure, B0027, MOYAD ROAD, ATTICAL

location of worksRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: NIW works

13/11/2026 09:46:00 : ROADWORKS

B0150, MIDDLE ROAD, ISLANDMAGEE - Lane closure, B0150, MIDDLE ROAD, ISLANDMAGEE

Location of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIW - Repack SV

13/11/2026 09:46:00 : ROADWORKS

B0150, MIDDLE ROAD, ISLANDMAGEE - Lane closure, B0150, MIDDLE ROAD, ISLANDMAGEE

location of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIW - New frame & Lid

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0612, ALEXANDRA PARK AVENUE, BELFAST - One Way closure, U0612, ALEXANDRA PARK AVENUE, BELFAST

Location of worksRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: NIW - Full Service Water Connx
Diversion in place.

Alternative Route Via:
Diversion 1: B0126 NORTH QUEEN STREET, U0612 GAINSBOROUGH DRIVE, U0612 ESTHER STREET

13/11/2026 09:46:00 : ROADWORKS

U0405, BURNEYS LANE, GLENGORMLEY - Lane closure, U0405, BURNEYS LANE, GLENGORMLEY

Lane ClosureRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0408, GLENMOUNT ROAD, NEWTOWNABBEY - Lane closure, U0408, GLENMOUNT ROAD, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0400, GLENWELL DRIVE, MALLUSK - Lane closure, U0400, GLENWELL DRIVE, MALLUSK

Lane ClosureRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0825, WYE STREET, BELFAST - Road closure, U0825, WYE STREET, BELFAST

location of worksRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: U0825 WYE STREET, U0825 DERWENT STREET, A0020 NEWTOWNARDS ROAD, U0825 DEE STREET

13/11/2026 09:46:00 : ROADWORKS

U0154, BALLYWILLWILL ROAD, DRUMAROAD - Road closure, U0154, BALLYWILLWILL ROAD, DRUMAROAD

Roadworks will operate from 09:00 on Fri 20th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: NIE Tree Cutting
Diversion in place.

Alternative Route Via:
Diversion 1: U0154 BALLYWILLWILL ROAD, C0308 CLONVARAGHAN ROAD, B0175 BALLYLOUGH ROAD

13/11/2026 09:46:00 : ROADWORKS

U0400, HOLLYBROOK HEIGHTS, MALLUSK - Lane closure, U0400, HOLLYBROOK HEIGHTS, MALLUSK

Lane ClosureRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0505, ELSMERE PARK, BELFAST - Lane closure, U0505, ELSMERE PARK, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0407, NEWTON GARDENS, NEWTOWNABBEY - Lane closure, U0407, NEWTON GARDENS, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

A0008, BALLYCLARE ROAD, NEWTOWNABBEY - Lane closure, A0008, BALLYCLARE ROAD, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Fri 4th Dec 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U8017, CROSBY STREET, BANGOR - Road closure, U8017, CROSBY STREET, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: x1 Borehole - NIW
Diversion in place.

Alternative Route Via:
Diversion 1: U8017 ALBERT STREET, U8017 VICTORIA ROAD, U8017 QUAY STREET

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0632, GLENALINA CRESCENT, BELFAST - Lane closure, U0632, GLENALINA CRESCENT, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0813, HILLSIDE DRIVE, BELFAST - Lane closure, U0813, HILLSIDE DRIVE, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0804, DONEGALL AVENUE, BELFAST - Lane closure, U0804, DONEGALL AVENUE, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0514, CROMARTY PLACE, BELFAST - Lane closure, U0514, CROMARTY PLACE, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS

A0025, BLANEY ROAD, NEWTOWNHAMILTON - Lane closure, A0025, BLANEY ROAD, NEWTOWNHAMILTON

Blaney Road, NewtownhamiltonRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: New connection for customer

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0520, BROOKLANDS GARDENS, BELFAST - Lane closure, U0520, BROOKLANDS GARDENS, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0508, DUNLADY MANOR, BELFAST - Lane closure, U0508, DUNLADY MANOR, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0844, SURREY STREET, BELFAST - Lane closure, U0844, SURREY STREET, BELFAST

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0648, BEECHMOUNT GROVE, BELFAST - Lane closure, U0648, BEECHMOUNT GROVE, BELFAST

Roadworks will operate as follows:-
0800-1500Reason: NEW GAS CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0038, GROSVENOR ROAD, BELFAST - Road closure, B0038, GROSVENOR ROAD, BELFAST

ROAD CLOSURE Roadworks will operate as follows:-
07:00 - 12:00Reason: SPLICING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0038 DURHAM STREET (ONSLIP), B0503 DURHAM STREET, B0503 DURHAM STREET (OFFSLIP), B0503 BOYNE BRIDGE PLACE, U0638 BRUCE STREET, U0642 BRUCE STREET, A0001 GREAT VICTORIA STREET

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0001, GREAT VICTORIA STREET, BELFAST - Lane closure, A0001, GREAT VICTORIA STREET, BELFAST

lane closure Roadworks will operate as follows:-
07:00- 12:00Reason: splicing works

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0002, GARMOYLE STREET, BELFAST - Lane closure, A0002, GARMOYLE STREET, BELFAST

lane closure Roadworks will operate from 09:30 on Sun 22nd Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: FRAME & COVER

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0024, ORMEAU ROAD, BELFAST - Lane closure, A0024, ORMEAU ROAD, BELFAST

lane closure Roadworks will operate as follows:-
07:00 - 12:00Reason: FRAME & COVER

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0813, LAGANVALE MANOR, BELFAST - Lane closure, U0813, LOCKVIEW ROAD, BELFAST

Location of worksRoadworks will operate from Mon 7th Dec 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
09:30 07-12-2026 - 16:30 11-12-2026Reason: NIW - NEW SEWER CONNECTION

13/11/2026 09:46:00 : ROADWORKS

B0536, SPOUT ROAD, STRABANE - Road closure, B0536, SPOUT ROAD, STRABANE

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: B0536 SPOUT ROAD, B0536 LIGFORD ROAD, B0536 MAIN STREET, B0047 DERGBROUGH ROAD, B0047 PLUMBRIDGE ROAD, B0046 PLUMBRIDGE ROAD, B0165 DOUGLAS ROAD, B0165 SHANNONY ROAD, B0165 CAMUS ROAD, B0165 LISKEY ROAD, B0074 FEENY ROAD, B0072 FYFIN ROAD, B0072 MILLTOWN ROAD, B0072 TOWNSEND STREET, B0536 FOUNTAIN STREET

13/11/2026 09:46:00 : ROADWORKS

A0002, GROOMSPORT BY-PASS, GROOMSPORT - Lane closure, A0002, GROOMSPORT BY-PASS, GROOMSPORT

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: BT Openreach Cabling Works

13/11/2026 09:46:00 : ROADWORKS

U2255, THORNBROOKE, AHOGHILL - Lane closure, U2255, OLD PORTGLENONE ROAD, AHOGHILL

lane closure Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: POLING WORKS

13/11/2026 09:46:00 : ROADWORKS

B0066, KNOCK ROAD, BALLYMONEY - Lane closure, B0066, KNOCK ROAD, BALLYMONEY

lane closure Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: POLING WORKS

13/11/2026 09:46:00 : ROADWORKS

B0084, BARONSCOURT ROAD, NEWTOWNSTEWART - Lane closure, B0084, BARONSCOURT ROAD, NEWTOWNSTEWART

lane closure Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: POLING WORKS

13/11/2026 09:46:00 : ROADWORKS

B0178, COMBER ROAD, ROYAL HILLSBOROUGH - Lane closure, B0178, COMBER ROAD, ROYAL HILLSBOROUGH

lane closure Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS

13/11/2026 09:46:00 : ROADWORKS

U0400, HIGHTOWN RISE, MALLUSK - Lane closure, U0400, HIGHTOWN RISE, MALLUSK

Lane ClosureRoadworks will operate from 09:30 on Wed 9th Dec 2026 to 16:30 on Wed 9th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0413, ASHFORD LODGE, GLENGORMLEY - Lane closure, U0413, ASHFORD LODGE, GLENGORMLEY

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

B0086, TOBERDONEY ROAD, DERVOCK - Lane closure, B0086, TOBERDONEY ROAD, DERVOCK

B0086, TOBERDONEY ROAD, DERVOCKRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils to clear blockages on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

U0412, BALLYHENRY ROAD, NEWTOWNABBEY - Lane closure, U0412, BALLYHENRY ROAD, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 08:00 on Sun 6th Dec 2026 to 18:00 on Sun 6th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

A0006, ANTRIM ROAD, GLENGORMLEY - Lane closure, A0006, ANTRIM ROAD, GLENGORMLEY

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0417, BALLYEARL CLOSE, MOSSLEY - Lane closure, U0417, BALLYEARL CLOSE, MOSSLEY

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0417, CARNREAGH, HILLSBOROUGH - Lane closure, U0417, CARNREAGH, HILLSBOROUGH

location of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIW works

13/11/2026 09:46:00 : ROADWORKS

B0090, BALLYHENRY ROAD, NEWTOWNABBEY - Lane closure, B0090, BALLYHENRY ROAD, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 08:00 on Sun 6th Dec 2026 to 18:00 on Sun 6th Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

U0413, LAUREL HILL, GLENGORMLEY - Lane closure, U0413, LAUREL HILL, GLENGORMLEY

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0269, GILNAHIRK ROAD, BELFAST - Lane closure, C0269, GILNAHIRK ROAD, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0815, DERAMORE AVENUE, BELFAST - Road closure, U0815, DERAMORE AVENUE, BELFAST

Location of worksRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: NIW - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0815 DERAMORE AVENUE, A0024 ORMEAU ROAD, U0815 HAYWOOD AVENUE

13/11/2026 09:46:00 : ROADWORKS

U0319, ABBACY ROAD, ARDKEEN - Road closure, U0319, ABBACY ROAD, ARDKEEN

LOCATION OF WORKSRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: U0319 ABBACY ROAD, A0020 DEER PARK ROAD, U0318 LOUGH COWEY ROAD

13/11/2026 09:46:00 : ROADWORKS

B0023, OLD SCHOOL YARD, LISBURN - Lane closure, B0023, OLD SCHOOL YARD, LISBURN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIE Generator Parking

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0055, PARKWAY, BELFAST - Lane closure, A0055, PARKWAY, BELFAST

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Telecoms Works

13/11/2026 09:46:00 : ROADWORKS

U0152, BRANIEL ROAD, LISBURN - Road closure, U0152, BRANIEL ROAD, LISBURN

Roadworks will operate from 09:00 on Thu 19th Nov 2026 to 17:00 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Work
Diversion in place.

Alternative Route Via:
Diversion 1: B0023 HILLHALL ROAD, C0298 DRUMBO ROAD, C0298 TULLYARD ROAD, U0152 BRANIEL ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0827, TILLYSBURN PARK, BELFAST - Lane closure, U0827, TILLYSBURN PARK, BELFAST

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Telecoms Works

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0003, UPPER DUNMURRY LANE, BELFAST - Road closure, C0003, UPPER DUNMURRY LANE, BELFAST

Work locationRoadworks will operate from 23:00 on Mon 16th Nov 2026 to 06:00 on Sat 28th Nov 2026.
Reason: NI Railway bridge maintenance and repairs
Diversion in place.

Alternative Route Via:
Diversion 1: C0003 UPPER DUNMURRY LANE, U7106 GLEBE ROAD, A0001 KINGSWAY

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0613, NEWINGTON AVENUE, BELFAST - Road closure, U0613, PONSONBY AVENUE, BELFAST

LOCATION OF WORKSRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0613 NEWINGTON STREET, B0501 LIMESTONE ROAD, U0613 ATLANTIC AVENUE

13/11/2026 09:46:00 : ROADWORKS

B0118, WOODVALE ROAD, EGLINTON - Lane closure, B0118, WOODVALE ROAD, EGLINTON

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Work

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0815, ELGIN STREET, BELFAST - Road closure, U0815, ELGIN STREET, BELFAST

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW - Replace Lead Pipe
Diversion in place.

Alternative Route Via:
Diversion 1: U0815 AVA AVENUE, U0815 DELHI PARADE, U0815 CANDAHAR STREET, U0815 ELGIN STREET

13/11/2026 09:46:00 : ROADWORKS BELFAST

U7108, LAGMORE DALE, BELFAST - Lane closure, U7108, LAGMORE DALE, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

U7108, LAGMORE DRIVE, BELFAST - Lane closure, U7108, LAGMORE DRIVE, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS

C0099, TOBERDONEY ROAD, BALLYMONEY - Lane closure, C0099, TOBERDONEY ROAD, BALLYMONEY

C0099, TOBERDONEY ROAD, LISCOLMANRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS

B0015, MAIN STREET, BALLINTOY - Lane closure, B0015, MAIN STREET, BALLINTOY

B0015, WHITEPARK ROAD, BALLINTOYRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0839, ARDENLEE AVENUE, BELFAST - Lane closure, U0839, ARDENLEE AVENUE, BELFAST

Location of worksRoadworks will operate from Mon 7th Dec 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
Continuous for 5 days 07-12-26 to 11-12-26Reason: NEW SEWER CONNECTION

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0813, LOCKVIEW ROAD, BELFAST - Lane closure, U0813, LOCKVIEW ROAD, BELFAST

Location of worksRoadworks will operate from Mon 30th Nov 2026 to Wed 2nd Dec 2026.
Continuously from first day / last day on following times:-
Continuous for 3 days 30-11-26 to 02-12-26Reason: Sewer Connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0634, LEESON STREET, BELFAST - Lane closure, U0634, LEESON STREET, BELFAST

86 Leeson StreetRoadworks will operate as follows:-
0930-1500Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0800, MEADOWHILL, BELFAST - Lane closure, U0800, MEADOWHILL, BELFAST

46 MeadowhillRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0801, DUNGLOE CRESCENT, BELFAST - Lane closure, U0801, DUNGLOE CRESCENT, BELFAST

35 Dungloe CrescentRoadworks will operate as follows:-
0930-1500Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

B0066, CASTLECAT ROAD, DERRYKEIGHAN - Lane closure, B0066, CASTLECAT ROAD, DERRYKEIGHAN

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Pole Testing

13/11/2026 09:46:00 : ROADWORKS

U1369, PRINCESS WAY, PORTADOWN - Lane closure, U1369, PRINCESS WAY, PORTADOWN

Roadworks will operate as follows:-
08:00 - 17:30Reason: Surfacing prep Works - CivilsTTM - Temporary Traffic Signals

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0843, COOLNASILLA PARK EAST, BELFAST - Lane closure, U0843, COOLNASILLA PARK EAST, BELFAST

32 Coolnasilla Park EastRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0802, LAKE GLEN DRIVE, BELFAST - Lane closure, U0802, LAKE GLEN DRIVE, BELFAST

31 Lake Glen DriveRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

A2002, SEACOAST ROAD, DOWNHILL - Lane closure, A2002, SEACOAST ROAD, DOWNHILL

Roadworks will operate from Mon 16th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Works planned to start 8am Monday 16th and Completed by 4pm Friday 20th. Traffic Lights will need to remain up continuously due to open excavation in carriageway.Reason: Foul Sewer Connection

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0821, TEMPLEMORE AVENUE, BELFAST - Road closure, U0821, TEMPLEMORE AVENUE, BELFAST

location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: A0020 ALBERTBRIDGE ROAD, A0020 NEWTOWNARDS ROAD, A0020 UPPER NEWTOWNARDS ROAD, B0505 BEERSBRIDGE ROAD, A0023 CASTLEREAGH STREET, U0821 TEMPLEMORE AVENUEDiversion 2: A0020 ALBERTBRIDGE ROAD, A0020 ALBERTSBRIDGE ROAD, C0704 WOODSTOCK LINK, C0704 WOODSTOCK ROAD, B0505 BEERSBRIDGE ROAD, U0821 TEMPLEMORE AVENUE

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0624, UPPER QUEEN STREET, BELFAST - Lane closure, U0624, UPPER QUEEN STREET, BELFAST

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Rebuild FH Chamber

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0803, RODNEY PARADE, BELFAST - Lane closure, U0803, RODNEY PARADE, BELFAST

21 Rodney ParadeRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: new gas connection

13/11/2026 09:46:00 : ROADWORKS

U7000, WILLAND CRESCENT, FIVEMILETOWN - Road closure, U7000, WILLAND CRESCENT, FIVEMILETOWN

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NI Water - CSO Duct & Kiosk Installation
Diversion in place.

Alternative Route Via:
Diversion 1: U7000 WILLAND CRESCENT

13/11/2026 09:46:00 : ROADWORKS

U0155, PLANTATION ROAD, LISBURN - Lane closure, U0155, PLANTATION ROAD, LISBURN

location of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIW works

13/11/2026 09:46:00 : ROADWORKS

B0021, HIGH STREET, BANGOR - Lane closure, B0021, HIGH STREET, BANGOR

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Cut and Prove Comms Pipe

13/11/2026 09:46:00 : ROADWORKS

B0513, STATION ROAD, NEWTOWNABBEY - Lane closure, B0513, STATION ROAD, NEWTOWNABBEY

Works LocationRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: To facilitate cable recovey for Openreach

13/11/2026 09:46:00 : ROADWORKS

U4115, TULLINISKY ROAD, KINALLEN - Road closure, U4115, TULLINISKY ROAD, KINALLEN

Road ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: To facilitate civils for Openreach
Diversion in place.

Alternative Route Via:
Diversion 1: U4115 TULLINISKY ROAD, C0310 TULLINISKY ROAD, C0328 BANBRIDGE ROAD

13/11/2026 09:46:00 : ROADWORKS

B0067, BENVARDIN ROAD, DERRYKEIGHAN - Lane closure, B0067, BENVARDIN ROAD, DERRYKEIGHAN

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Pole Testing

13/11/2026 09:46:00 : ROADWORKS

C0039, BURNSIDE ROAD, DOAGH - Lane closure, C0039, BURNSIDE ROAD, DOAGH

Roadworks will operate from 09:30 on Wed 11th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0006, ROYAL AVENUE, BELFAST - Lane closure, A0006, ROYAL AVENUE, BELFAST

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace or Rebuild Chamber

13/11/2026 09:46:00 : ROADWORKS

B0147, BALLINLEA ROAD, ARMOY - Lane closure, B0147, BALLINLEA ROAD, ARMOY

Work AreaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Pole Testing

13/11/2026 09:46:00 : ROADWORKS

C0298, TULLYARD ROAD, LISBURN - Road closure, C0298, TULLYARD ROAD, LISBURN

location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: U0152 BRANIEL ROAD, B0023 HILLHALL ROAD, U0154 GLEN ROAD, C0298 TULLYARD ROAD

13/11/2026 09:46:00 : ROADWORKS

B0095, HIGHTOWN ROAD, GLENGORMLEY - Lane closure, B0095, HIGHTOWN ROAD, GLENGORMLEY

Location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Minor Sewer Improvements

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0844, MARYVILLE AVENUE, BELFAST - Road closure, U0844, MARYVILLE AVENUE, BELFAST

Crane installRoadworks will operate from Mon 30th Nov 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
8am on the 30th of Nov to 6pm on 4th of DecReason: Crane build for new apartments
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 LISBURN ROAD, U0844 CHARLEVILLE AVENUE, U0844 HUGH STREETDiversion 2: U0844 HUGH STREET, U0844 CHARLEVILLE AVENUE, A0001 LISBURN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0020, UPPER NEWTOWNARDS ROAD, BELFAST - Lane closure, A0020, UPPER NEWTOWNARDS ROAD, BELFAST

lane closure Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: FRAME & COVER

13/11/2026 09:46:00 : ROADWORKS

U0048, CHAPEL ROAD, GLENAVY - Road closure, U0048, CHAPEL ROAD, GLENAVY

Road ClosureRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: Trial Opening
Diversion in place.

Alternative Route Via:
Diversion 1: B0012 LURGAN ROAD, B0012 EDENTURCHER ROAD, U0047 GLEN ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0039, SHANKILL ROAD, BELFAST - Lane closure, B0039, SHANKILL ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIW Meter Works

13/11/2026 09:46:00 : ROADWORKS

U0065, DRUMCILL ROAD, LISBURN - Road closure, U0065, DRUMCILL ROAD, LISBURN

location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: U2079 BUSHFIELD ROAD, U0095 BUSHFIELD ROAD, A0003 MOIRA ROAD, U0071 DAGGER ROAD, U0071 CROSS LANE

13/11/2026 09:46:00 : ROADWORKS

B0147, KIRK ROAD, BALLYMONEY - Road closure, B0147, KIRK ROAD, BALLYMONEY

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 4th Dec 2026.
Reason: Carriageway resurfacing
Diversion in place.

Alternative Route Via:
Diversion 1: B0147 KIRK ROAD, C0081 FIVEY ROAD, B0015 GRACEHILL ROAD, B0016 KILRAUGHTS ROAD, A0026 FROSSES ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0815, DERAMORE STREET, BELFAST - Road closure, U0815, DERAMORE STREET, BELFAST

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: A0024 ORMEAU ROAD, U0815 HAYWOOD AVENUE

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0844, GREAT NORTHERN STREET, BELFAST - Road closure, U0844, GREAT NORTHERN STREET, BELFAST

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: NI Water - CSO Duct & Kiosk Installation
Diversion in place.

Alternative Route Via:
Diversion 1: U0844 LISBURN AVENUE, A0001 LISBURN ROAD, U0844 RATHCOOL STREET, U0844 GREAT NORTHERN STREETDiversion 2: U0844 BROOKLAND STREET, A0001 LISBURN ROAD, U0844 ETHEL STREET, U0844 GREAT NORTHERN STREET

13/11/2026 09:46:00 : ROADWORKS

U0061, AGARS ROAD, LISBURN - Road closure, U0061, AGARS ROAD, LISBURN

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW works
Diversion in place.

Alternative Route Via:
Diversion 1: U0065 DRUMCILL ROAD, U2079 BUSHFIELD ROAD, U0095 BUSHFIELD ROAD, A0003 MOIRA ROAD, U0061 MOYRUSK ROAD, U0061 AGARS ROAD

13/11/2026 09:46:00 : ROADWORKS

A0006, MAIN STREET, DUNGIVEN - Lane closure, A0006, MAIN STREET, DUNGIVEN

lane closure Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: BT POLING WORKS

13/11/2026 09:46:00 : ROADWORKS

B0177, LISBURN ROAD, HILLSBOROUGH - Lane closure, B0177, LISBURN ROAD, HILLSBOROUGH

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Defective apparatus

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0840, PALMERSTON ROAD, BELFAST - Road closure, U0840, PALMERSTON ROAD, BELFAST

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW - Trial Opening
Diversion in place.

Alternative Route Via:
Diversion 1: U0840 STATION ROAD, U0840 INVERARY DRIVE, U0840 LARKFIELD DRIVE, U0840 LARKFIELD ROAD, U0840 PALMERSTON ROAD

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0847, HARBERTON DRIVE, BELFAST - Road closure, U0847, HARBERTON DRIVE, BELFAST

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW - Replace or Relevel FH Box
Diversion in place.

Alternative Route Via:
Diversion 1: U0847 STRANGFORD AVENUE, U0847 HARBERTON PARK, A0055 BALMORAL AVENUE

13/11/2026 09:46:00 : ROADWORKS

U0106, BALLYMULLAN ROAD, CRAWFORDSBURN - Road closure, U0106, BALLYMULLAN ROAD, CRAWFORDSBURN

BALLYMULLAN ROAD, CRAWFORDSBURNRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: B0020 BALLYROBERT ROAD

13/11/2026 09:46:00 : ROADWORKS

C0254, FINLAYS ROAD, NEWTOWNARDS - Road closure, C0254, FINLAYS ROAD, NEWTOWNARDS

FINLAYS ROAD, NEWTOWNARDSRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: installation of BT cable
Diversion in place.

Alternative Route Via:
Diversion 1: C0254 BALLYBLACK ROAD, U0125 CUNNINGBURN ROAD, A0020 PORTAFERRY ROAD

13/11/2026 09:46:00 : ROADWORKS

A0020, PORTAFERRY ROAD, NEWTOWNARDS - Lane closure, A0020, PORTAFERRY ROAD, NEWTOWNARDS

PORTAFERRY ROAD, NEWTOWNARDSRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: installation of BT duct

13/11/2026 09:46:00 : ROADWORKS

A0002, CIRCULAR ROAD, LARNE - Lane closure, A0002, CIRCULAR ROAD, LARNE

Location of worksRoadworks will operate as follows:-
Sun 22 Nov 2026 : 07:00 - 12:00.
Additional details : Lane 1 closure from entrance to roundabout where lane splits.Reason: NIW - Replace or Relevel SV AV FH Box

13/11/2026 09:46:00 : ROADWORKS

A0002, SHORE ROAD, NEWTOWNABBEY - Lane closure, A0002, SHORE ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Desilt Sewer

13/11/2026 09:46:00 : ROADWORKS

U1230, PARKFIELD, CRUMLIN - Lane closure, U1230, PARKFIELD, CRUMLIN

Roadworks will operate from 08:00 on Tue 17th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: Installing new gas connection to customer os 18 as per chapter 8

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0023, UPPER MALONE ROAD, BELFAST - Lane closure, B0023, UPPER MALONE ROAD, BELFAST

location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Replace or Relevel (SV AV FH) Boxes

13/11/2026 09:46:00 : ROADWORKS BELFAST

B0038, SPRINGFIELD ROAD, BELFAST - Lane closure, B0038, SPRINGFIELD ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIW - meter works

13/11/2026 09:46:00 : ROADWORKS

B0145, BALLAGHMORE ROAD, PORTBALLINTRAE - Lane closure, B0145, BALLAGHMORE ROAD, PORTBALLINTRAE

3-Way LightsRoadworks will operate from Mon 16th Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Traffic Lights will need to remain up continuously due to open excavation in carriageway. Works planned to start 8am Monday and completed by 4pm FridayReason: Storm Sewer Connection with New Manhole

13/11/2026 09:46:00 : ROADWORKS BELFAST

C0303, OLD HOLYWOOD ROAD, BELFAST - Lane closure, C0303, OLD HOLYWOOD ROAD, BELFAST

Lane closureRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Resurfacing of 189 Old Holywood Road driveway

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0812, FOUNTAINVILLE AVENUE, BELFAST - Road closure, U0812, FOUNTAINVILLE AVENUE, BELFAST

Road closureRoadworks will operate as follows:-
0700 to 1200Reason: NIW works - Replace manhole cover and frame
Diversion in place.

Alternative Route Via:
Diversion 1: B0023 UNIVERSITY ROAD, U0812 FITZWILLIAM STREET, A0001 LISBURN ROAD, U0812 FOUNTAINVILLE AVENUEDiversion 2:

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0812, OSBORNE GARDENS, BELFAST - Road closure, U0812, OSBORNE GARDENS, BELFAST

Road closureRoadworks will operate as follows:-
0700 to 1200Reason: NIW works - Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0812 OSBORNE GARDENS, U0812 OSBORNE PARK, A0001 LISBURN ROAD, U0812 CRANMORE PARK

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0815, COLLEGE DRIVE, BELFAST - Lane closure, U0815, ANNADALE EMBANKMENT, BELFAST

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Replace Manhole Cover and Frame

13/11/2026 09:46:00 : ROADWORKS BELFAST

A0052, CRUMLIN ROAD, BELFAST - Lane closure, A0052, CRUMLIN ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIW - Rebuild FH Chamber

13/11/2026 09:46:00 : ROADWORKS BELFAST

U0834, SHANDON PARK, BELFAST - Road closure, U0834, SHANDON PARK, BELFAST

Road closureRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIW works - Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0834 KENSINGTON ROAD, C0269 GILNAHIRK ROAD, U0834 CHERRYVALLEY, A0055 KNOCK ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0644, BROMPTON PARK, BELFAST - Road closure, U0644, BROMPTON PARK, BELFAST

Road closureRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIW works - Replace manhole cover and frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0644 BROMPTON PARK, U0610 BALHOLM DRIVE, U0610 LADBROOK DRIVE, U0610 HIGHBURY GARDENS, U0610 ETNA DRIVE

13/11/2026 09:45:00 : ROADWORKS

U3009, LISANELLY AVENUE, OMAGH - Lane closure, U3009, LISANELLY AVENUE, OMAGH

Area of worksRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Excavate joint hole, road crossing and 10m cable track.

13/11/2026 09:45:00 : ROADWORKS BELFAST

B0501, CAVEHILL ROAD, BELFAST - Lane closure, B0501, CAVEHILL ROAD, BELFAST

Cavehill RoadRoadworks will operate from 09:30 on Tue 1st Dec 2026 to 16:30 on Tue 1st Dec 2026.
Reason: NIW Inspection

13/11/2026 09:45:00 : ROADWORKS

U1003, MOSS LANE, AGHALEE - Road closure, U1003, MOSS LANE, AGHALEE

MOSS LANE, AGHALEERoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: renewal of BT pole
Diversion in place.

Alternative Route Via:
Diversion 1: U1005 DIAMOND LANE, U1006 ORKEN LANE, B0012 AGHALEE ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0025, DOWNPATRICK ROAD, CLOUGH CO DOWN - Road closure, A0025, DOWNPATRICK ROAD, CLOUGH CO DOWN

Closure MapRoadworks will operate as follows:-
Monday to Friday
9am-4pm Reason: Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0025 DOWNPATRICK ROAD, A0024 NEWCASTLE ROAD, A0024 DRUMANESS ROAD, B0002 DOWNPATRICK ROAD, B0002 ANNACLOY ROAD, A0007 BELFAST ROAD, A0025 NEW BRIDGE STREET, A0025 CHURCH STREET, A0025 IRISH STREET, A0025 MARKET STREET, A0025 BALLYDUGAN ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0840, VICTORIA ROAD, BELFAST - Road closure, U0840, VICTORIA ROAD, BELFAST

Location of worksRoadworks will operate from Tue 24th Nov 2026 to Tue 1st Dec 2026.
Continuously from first day / last day on following times:-
08:00 24-11-2026 - 18:00 01-12-2026Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: U0840 VICTORIA ROAD, U0840 INVERARY DRIVE, U0840 STATION ROAD, U0840 PALMERSTON ROAD

13/11/2026 09:45:00 : ROADWORKS

B0066, CASTLECAT ROAD, BUSHMILLS - Lane closure, B0066, CASTLECAT ROAD, BUSHMILLS

B0066, CASTLECAT ROAD, BUSHMILLSRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Poling Works on the Fibrus Network

13/11/2026 09:45:00 : ROADWORKS BELFAST

C0703, DONEGALL ROAD, BELFAST - Lane closure, C0703, DONEGALL ROAD, BELFAST

Roadworks will operate from 08:00 on Sat 30th Jan 2027 to 18:00 on Sat 30th Jan 2027.
Reason: Telecoms Works

13/11/2026 09:45:00 : ROADWORKS

B0064, EDENBANE ROAD, KILREA - Lane closure, B0064, EDENBANE ROAD, KILREA

B0064, EDENBANE ROAD, KILREARoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Permanently reinstating temporary sites

13/11/2026 09:45:00 : ROADWORKS

C0030, SCULLIONS ROAD, NEWTOWNABBEY - Lane closure, C0030, SCULLIONS ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Replace Manhole Cover and Frame

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0812, MARLBOROUGH PARK NORTH, BELFAST - Road closure, U0812, MARLBOROUGH PARK NORTH, BELFAST

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW -Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0812 MARLBOROUGH PARK NORTH, U0812 MARLBOROUGH PARK SOUTH

13/11/2026 09:45:00 : ROADWORKS

U8023, BALLYMACONNELL ROAD, BANGOR - One Way closure, U8023, BALLYMACONNELL ROAD, BANGOR

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Relevel or Replace Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 EAST CIRCULAR ROAD, B0511 GROOMSPORT ROAD, U8023 BALLYMACONNELL ROADDiversion 2: A0002 EAST CIRCULAR ROAD, A0002 DONAGHADEE ROAD, B0021 DONAGHADEE ROAD, B0511 GROOMSPORT ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0812, EGLANTINE AVENUE, BELFAST - Road closure, U0812, EGLANTINE AVENUE, BELFAST

Road ClosureRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0812 EGLANTINE AVENUE, A0001 LISBURN ROAD, U0812 WELLINGTON PARK, B0023 MALONE ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0812, ELMWOOD AVENUE, BELFAST - Road closure, U0812, ELMWOOD AVENUE, BELFAST

Road ClosureRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 LISBURN ROAD, U0812 EGLANTINE AVENUE, B0023 MALONE ROAD, B0023 UNIVERSITY ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

F0848, COLLEGE PARK, BELFAST - Lane closure, F0848, BOTANIC AVENUE, BELFAST

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace Manhole Cover and Frame

13/11/2026 09:45:00 : ROADWORKS

A0003, MAIN STREET, BANGOR - Lane closure, A0003, CASTLE STREET, BANGOR

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replacement PRV

13/11/2026 09:45:00 : ROADWORKS

B0095, HIGHTOWN ROAD, NEWTOWNABBEY - Lane closure, B0095, HIGHTOWN ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate as follows:-
Evening lid 19:00 - 22:00Reason: Replace Manhole Cover and Frame

13/11/2026 09:45:00 : ROADWORKS

U0017, PARK ROAD, MALLUSK - One Way closure, U0017, PARK ROAD, MALLUSK

Road ClosureRoadworks will operate as follows:-
Evening lid 19:00 - 22:00Reason: Replace Manhole Cover and Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0017 PARK ROAD, A0006 ANTRIM ROAD, A0006 BALLYCLARE ROAD, C0030 SCULLIONS ROAD, B0095 MALLUSK ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0020, UPPER NEWTOWNARDS ROAD, BELFAST - Lane closure, A0020, UPPER NEWTOWNARDS ROAD, BELFAST

Location of worksRoadworks will operate as follows:-
0700 to 1200Reason: NIW - Replace or Inst Boundary Box or S Cock

13/11/2026 09:45:00 : ROADWORKS

M0001, M1 MOTORWAY (WEST BOUND), LISBURN - Road closure, M0001, M1 MOTORWAY (WEST BOUND), LISBURN

M1 Westbound J6-J7Roadworks will operate from 23:00 on Wed 18th Nov 2026 to 06:00 on Thu 19th Nov 2026.
Reason: CAT 2 Carriageway Repairs
Diversion in place.

Alternative Route Via:
Diversion 1: M0001 M1 SAINTFIELD ROAD SOUTH OFF-SLIP ROAD (WEST BOUND), A0049 SAINTFIELD ROAD, A0049 SLOAN STREET, A0001 QUEENS ROAD, A0001 LAGANBANK ROAD, A0001 HILLSBOROUGH ROAD, A0101 A1 SPRUCEFIELD ROUNDABOUT, A0101 A1 HILLSBOROUGH ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 HILLSBOROUGH BY-PASS ROUNDABOUT, A0101 A101 MAGHERAGEERY ROAD DUAL CARRIAGEWAY (WEST BOUND)

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0002, M2 MOTORWAY (NORTH BOUND), BELFAST - Lane closure, M0002, M2 MOTORWAY (NORTH BOUND), BELFAST

York St - Fortwilliam Lane 5Roadworks will operate from 23:00 on Sat 21st Nov 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: DBFO1 Routine Maintenance

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0003, M3 MOTORWAY (WEST BOUND), BELFAST - Lane closure with Diversionary Measures, M0003, M3 MOTORWAY (WEST BOUND), BELFAST

M3 Westbound Lanes 3 & 4Roadworks will operate from 23:00 on Sat 21st Nov 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: DBFO1 Routine Maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: M0003 M3 NELSON STREET OFF-SLIP ROAD (WEST BOUND), M0003 M3, A0002 GREAT GEORGES STREET, A0002 YORK STREET, M0002 M2 MOTORWAY (NORTH BOUND)

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0003, M3 MOTORWAY (WEST BOUND), BELFAST - Road closure, M0003, M3 MOTORWAY (WEST BOUND), BELFAST

Bridge End - Middlepath Street FCRoadworks will operate from 23:00 on Sat 21st Nov 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: DBFO1 Routine Maintnenance
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 SYDENHAM BY-PASS OFF-SLIP, A0002 BRIDGE END FLYOVER, A0002 BRIDGE END, U0824 BRIDGE END, M0003 M3 MIDDLEPATH STREET ON-SLIP ROAD (WEST BOUND)

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0003, M3 MOTORWAY (WEST BOUND), BELFAST - Lane closure, M0003, M3 MOTORWAY (WEST BOUND), BELFAST

Bridge End - Middlepath ONS Lane 1Roadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: DBFO1 Routine Maintenance

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0003, M3 MOTORWAY (WEST BOUND), BELFAST - Lane closure with Diversionary Measures, M0003, M3 MOTORWAY (WEST BOUND), BELFAST

M3 Westbound Lanes 1 & 2Roadworks will operate from 23:00 on Wed 18th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: DBFO1 Routine Maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: M0003 M3 MOTORWAY (NORTH BOUND), M0003 M3, M0002 M2 MOTORWAY (NORTH BOUND), M0002 M2 FORTWILLIAM RBT OFF-SLIP ROAD (NORTH BOUND), U0619 DARGAN ROAD, M0002 M2 FORTWILLIAM RBT ON-SLIP ROAD (SOUTH BOUND), M0002 M2 MOTORWAY (SOUTH BOUND)

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0002, MIDDLEPATH STREET, BELFAST - Road closure, A0002, M3 MIDDLEPATH STREET ON-SLIP ROAD (WEST BOUND), BELFAST

M3 Westbound Middlepath ONSRoadworks will operate from 23:00 on Wed 18th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: DBFO1 Routine Maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 MIDDLEPATH STREET, A0002 BRIDGE END, A0002 ANN STREET, A0002 VICTORIA STREET, A0002 DUNBAR LINK, A0002 GREAT PATRICK STREET, A0002 YORK STREET

13/11/2026 09:45:00 : ROADWORKS

A0048, DONAGHADEE ROAD, NEWTOWNARDS - Lane closure, A0048, DONAGHADEE ROAD, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Defective apparatus

13/11/2026 09:45:00 : ROADWORKS BELFAST

C0262, ROBBS ROAD, BELFAST - Lane closure, C0262, ROBBS ROAD, BELFAST

Roadworks will operate from 08:00 on Sun 13th Dec 2026 to 18:00 on Sun 13th Dec 2026.
Reason: Telecoms Works

13/11/2026 09:45:00 : ROADWORKS

C0676, LURGANBOY ROAD, CASTLEDERG - Lane closure, C0676, LURGANBOY ROAD, CASTLEDERG

Roadworks will operate from 09:00 on Mon 16th Nov 2026 to 17:00 on Thu 19th Nov 2026.
Reason: New Meter Chamber on the verge

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0003, M3 MOTORWAY (EAST BOUND), BELFAST - Lane closure with Diversionary Measures, M0003, M3 MOTORWAY (EAST BOUND), BELFAST

M3 Eastbound Lanes 1 & 2Roadworks will operate from 23:00 on Tue 17th Nov 2026 to 06:00 on Wed 18th Nov 2026.
Reason: DBFO1 Routine Maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: M0003 M3 MOTORWAY (EAST BOUND), A0002 A2 SYDENHAM BY-PASS DUAL CARRIAGEWAY (EAST BOUND), A0002 SYDENHAM BY-PASS, U0825 DEE STREET, UNASSIGNED SYDENHAM ROAD, U0824 SYDENHAM ROAD, U0824 STATION STREET, A0002 MIDDLEPATH STREET

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0003, M3 NELSON STREET ON-SLIP ROAD (EAST BOUND), BELFAST - Road closure, M0003, M3 NELSON STREET ON-SLIP ROAD (EAST BOUND), BELFAST

Nelson St OnslipRoadworks will operate from 23:00 on Mon 16th Nov 2026 to 06:00 on Wed 18th Nov 2026.
Reason: DBFO1 Routine Maintenance
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 NELSON STREET, A0002 DUNBAR LINK, A0002 VICTORIA STREET, A0002 WARING STREET, A0002 ALBERT SQUARE, A0002 DONEGALL QUAY, A0002 QUEEN ELIZABETH BRIDGE, A0002 MIDDLEPATH STREET, A0002 A2 SYDENHAM BY-PASS ON-SLIP ROAD (EAST BOUND)

13/11/2026 09:45:00 : ROADWORKS

A0026, TULLY ROAD, NUTTS CORNER - Lane closure, A0026, TULLY ROAD, NUTTS CORNER

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0022, COMBER ROAD, BELFAST - Road closure, A0022, COMBER ROAD, BELFAST

Road ClosureRoadworks will operate as follows:-
08:00-12:00Reason: Defective apparatus
Diversion in place.

Alternative Route Via:
Diversion 1: C0378 EAST LINK ROAD, C0265 OLD DUNDONALD ROAD, A0022 COMBER ROAD, A0020 UPPER NEWTOWNARDS ROAD

13/11/2026 09:45:00 : ROADWORKS

U4101, LINN ROAD, LARNE - Lane closure, U4101, LINN ROAD, LARNE

Lane ClosureRoadworks will operate as follows:-
Sun 29 Nov 2026 : 7:00 to 12:00.Reason: Defective apparatus

13/11/2026 09:45:00 : ROADWORKS

U1662, KEVLIN ROAD, OMAGH - Lane closure, U1662, KEVLIN ROAD, OMAGH

Replacing damaged column and cablesRoadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Replacing damaged column and cables

13/11/2026 09:45:00 : ROADWORKS

B0016, KILRAUGHTS ROAD, KILRAGHTS - Lane closure, B0016, KILRAUGHTS ROAD, KILRAGHTS

Lane closureRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIE overhead line work

13/11/2026 09:45:00 : ROADWORKS

B0016, KILRAUGHTS ROAD, KILRAGHTS - Lane closure, B0016, KILRAUGHTS ROAD, KILRAGHTS

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIE overhead line work

13/11/2026 09:45:00 : ROADWORKS

U4112, CRAIGATEMPIN ROAD, KILRAGHTS - Road closure, U4112, CRAIGATEMPIN ROAD, KILRAGHTS

Road closureRoadworks will operate from 09:00 on Mon 23rd Nov 2026 to 17:00 on Mon 23rd Nov 2026.
Reason: NIE overhead line work
Diversion in place.

Alternative Route Via:
Diversion 1: C0090 TUMMOCK ROAD, U4110 CUSHNAHANS ROAD, U4110 LISBOY ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0835, CLARA PARK, BELFAST - Road closure, U0835, CLARA PARK, BELFAST

Roadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Surfacing Works - Residential Access Maintained
Diversion in place.

Alternative Route Via:
Diversion 1: U0835 SANDHILL PARADE, U0835 SANDHILL GARDENS, U0835 CLARA PARK, U0835 SANDOWN ROAD, U0835 CLARA ROADDiversion 2: U0835 CLARAWOOD PARK, U0835 KNOCKWOOD PARK, A0055 KNOCK ROAD, U0835 SANDOWN ROAD

13/11/2026 09:45:00 : ROADWORKS

U8002, SILVERSTREAM AVENUE, BANGOR - Road closure, U8002, SILVERSTREAM AVENUE, BANGOR

Closure MapRoadworks will operate from 08:00 on Mon 2nd Nov 2026 to 18:00 on Fri 4th Dec 2026.
Reason: Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: U8002 HAWTHORNE DRIVE, U8002 SILVERSTREAM DRIVE, U8002 SILVERSTREAM ROAD

13/11/2026 09:45:00 : ROADWORKS

U4010, FIVE ACRES, STRABANE - Road closure, U4010, FIVE ACRES, STRABANE

Site Location MapRoadworks will operate from 09:00 on Thu 5th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: Milling, Regulating, HRA surface course
Diversion in place.

Alternative Route Via:
Diversion 1: U2044 BALLYCOLMAN ROAD

13/11/2026 09:45:00 : ROADWORKS

U4010, LAUREL DRIVE, STRABANE - Road closure, U4010, LAUREL DRIVE, STRABANE

Site Location MapRoadworks will operate from 09:00 on Thu 5th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: Milling, Regulating, Laying HRA Surface Course
Diversion in place.

Alternative Route Via:
Diversion 1: U4010 LAUREL DRIVE

13/11/2026 09:45:00 : ROADWORKS

U8024, BROADWAY, BANGOR - Road closure, U8024, BROADWAY, BANGOR

Location of worksRoadworks will operate from Wed 4th Nov 2026 to Tue 17th Nov 2026.
Continuously from first day / last day on following times:-
09:30 04-11-2026 - 18:00 17-11-2026Reason: NIE Works
Diversion in place.

Alternative Route Via:
Diversion 1: U8025 FAIRFIELD ROAD, C0252 GRANSHA ROAD, C0252 CASTLE STREET, U8024 PARK DRIVE, B0197 HAMILTON ROAD, B0021 DONAGHADEE ROAD, U8024 BROADWAYDiversion 2: B0021 DONAGHADEE ROAD, A0002 EAST CIRCULAR ROAD, A0002 DONAGHADEE ROAD, C0252 GRANSHA ROAD, U8025 FAIRFIELD ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

M0001, M1 STOCKMANS LANE SOUTH OFF-SLIP ROAD (WEST BOUND), BELFAST - Road closure, M0001, M1 STOCKMANS LANE SOUTH OFF-SLIP ROAD (WEST BOUND), BELFAST

M1 WB J2 OffslipRoadworks will operate from 23:00 on Mon 16th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: DBFO1 Major Maintenance - Stockmans Lane fencing
Diversion in place.

Alternative Route Via:
Diversion 1: M0001 M1 MOTORWAY (WEST BOUND), M0001 M1 BLACKS ROAD OFF-SLIP ROAD (WEST BOUND), U0305 BLACKS ROAD, A0001 UPPER LISBURN ROAD, A0001 LISBURN ROAD, A0055 STOCKMANS LANE

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0819, CARLINGFORD STREET, BELFAST - Road closure, U0819, CARLINGFORD STREET, BELFAST

Road ClosureRoadworks will operate from Mon 16th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Continuous closure from 8am Monday 2nd to 4pm Friday 6th. Reason: Replacement of defective manhole chamber
Diversion in place.

Alternative Route Via:
Diversion 1: U0819 CARLINGFORD STREETDiversion 2: U0819 CARLINGFORD STREET, U0819 OMEATH STREET, C0704 WOODSTOCK ROAD, U0819 GREENORE STREET

13/11/2026 09:45:00 : ROADWORKS

A0505, KILLYCLOGHER ROAD, OMAGH - Lane closure, A0505, KILLYCLOGHER ROAD, OMAGH

Area of worksRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: 11m Road crossing from Breech joint to Straight through joint on behalf of NIE

13/11/2026 09:45:00 : ROADWORKS

U4089, THE RODDENS, LARNE - Lane closure, U4089, THE RODDENS, LARNE

Lane ClosureRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Mon 30th Nov 2026.
Reason: Defective apparatus

13/11/2026 09:45:00 : ROADWORKS

U8016, CENTRAL AVENUE, BANGOR - Road closure, U8016, CENTRAL AVENUE, BANGOR

Works areaRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Tree Works
Diversion in place.

Alternative Route Via:
Diversion 1: U8016 CENTRAL AVENUE, U8004 DUFFERIN AVENUE, A0002 MAIN STREET, A0003 MAIN STREET

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0001, BRUCE STREET, BELFAST - Lane closure, A0001, BRUCE STREET, BELFAST

Roadworks will operate from 08:00 on Sat 21st Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: High Friction surfacing

13/11/2026 09:45:00 : ROADWORKS BELFAST

B0502, NORTHUMBERLAND STREET, BELFAST - Lane closure, B0502, NORTHUMBERLAND STREET, BELFAST

Roadworks will operate as follows:-
8pm-6amReason: High Friction surfacing

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0002, YORK STREET, BELFAST - Lane closure, A0002, YORK STREET, BELFAST

lane closureRoadworks will operate as follows:-
8pm to 6amReason: High Friction surfacing

13/11/2026 09:45:00 : ROADWORKS BELFAST

B0126, NORTH QUEEN STREET, BELFAST - Lane closure, B0126, NORTH QUEEN STREET, BELFAST

Roadworks will operate as follows:-
8pm to 6amReason: High Friction surfacing

13/11/2026 09:45:00 : ROADWORKS

U1529, O'DONOVAN ROAD, LONDONDERRY - Road closure, U1529, O'DONOVAN ROAD, LONDONDERRY

Surfacing Area Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: Resurfacing works on Odonavan Rd
Diversion in place.

Alternative Route Via:
Diversion 1: U1529 O'DONOVAN ROAD, U1529 PAPWORTH AVENUE, U1529 PETRIE WAY

13/11/2026 09:45:00 : ROADWORKS

U6527, OLD ROSSORRY ROAD, ENNISKILLEN - Lane closure, U6527, OLD ROSSORRY ROAD, ENNISKILLEN

Roadworks will operate from 09:30 on Fri 13th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation of new gas service to 23 old rossorry road with traffic lights as per chapter 8

13/11/2026 09:45:00 : ROADWORKS

U6306, ABBEY DRIVE, ENNISKILLEN - Lane closure, U6306, ABBEY DRIVE, ENNISKILLEN

Roadworks will operate from Thu 12th Nov 2026 to Thu 19th Nov 2026.
Continuously from first day / last day on following times:-
8am - 6pmReason: installation of new gas service to 11 abbey drive as per chapter 8

13/11/2026 09:45:00 : ROADWORKS

U0016, ROUGHFORT ROAD, NEWTOWNABBEY - Road closure, U0016, ROUGHFORT ROAD, NEWTOWNABBEY

road closureRoadworks will operate from 08:00 on Thu 26th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0095 MALLUSK ROAD, U0017 PARK ROAD, A0006 ANTRIM ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0002, HOLYWOOD BY-PASS, BANGOR - Lane closure, A0002, BELFAST ROAD, BANGOR

Holywood by-pass, BangorRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Tree cutting

13/11/2026 09:45:00 : ROADWORKS

U8016, CENTRAL AVENUE, BANGOR - Road closure, U8016, CENTRAL AVENUE, BANGOR

Location of worksRoadworks will operate from Mon 9th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
09:30 09-11-2026 - 18:00 20-11-2026Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: U8016 SOUTHWELL ROAD, U8004 DUFFERIN AVENUEDiversion 2: U8004 DUFFERIN AVENUE, A0002 MAIN STREET, A0003 MAIN STREET, U8016 CENTRAL AVENUE

13/11/2026 09:45:00 : ROADWORKS

B0039, SEVEN MILE STRAIGHT, CLADY - Lane closure, B0039, SEVEN MILE STRAIGHT, CLADY

B0039, SEVEN MILE STRAIGHT, CLADYRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:45:00 : ROADWORKS

A0026, OLDSTONE ROAD, ANTRIM - Lane closure, A0026, OLDSTONE ROAD, ANTRIM

A0026, OLDSTONE ROAD, ANTRIMRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0006, BELFAST ROAD, DUNADRY - Lane closure, A0006, BELFAST ROAD, DUNADRY

A0006, BELFAST ROAD, DUNADRYRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0008, BELFAST ROAD, BALLYCLARE - Lane closure, A0008, BELFAST ROAD, BALLYCLARE

A0008, BELFAST ROAD, BALLYCLARERoadworks will operate as follows:-
19:00-23:00Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

13/11/2026 09:45:00 : ROADWORKS

B0201, WINDYHILL ROAD, COLERAINE - Lane closure, B0201, WINDYHILL ROAD, COLERAINE

Windyhill Road Lane CLosureRoadworks will operate from Sat 14th Nov 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Site hours 0730 -1730, VMS Signs in place to advise of disruption and alternative routeReason: Installation of NIW trunk main

13/11/2026 09:45:00 : ROADWORKS

U4550, HENRY STREET, BALLYMONEY - One Way closure, U4550, HENRY STREET, BALLYMONEY

Henry StreetRoadworks will operate from Sun 22nd Nov 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Continusous closure necessary due to nature of opencut excavation works Reason: NI Water new storm sewer laying
Diversion in place.

Alternative Route Via:
Diversion 1: B0062 QUEEN STREET, B0147 NEWAL ROAD, B0062 MEETING HOUSE STREET, U4550 UNION STREET, U4550 OZONE AVENUE

13/11/2026 09:45:00 : ROADWORKS

U4117, GLENLOUGH ROAD, BALLYMONEY - Road closure, U4117, GLENLOUGH ROAD, BALLYMONEY

Road closureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE overhead line work
Diversion in place.

Alternative Route Via:
Diversion 1: C0090 TUMMOCK ROAD, C0090 LOUGHABIN ROAD, C0090 CROSSTAGHERTY ROAD, A0026 FROSSES ROAD, U4117 GLENLOUGH ROAD

13/11/2026 09:45:00 : ROADWORKS

U4116, LANDHEAD ROAD, DUNAGHY - Lane closure, U4116, LANDHEAD ROAD, DUNAGHY

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE overhead line work

13/11/2026 09:45:00 : ROADWORKS

B0016, KILRAUGHTS ROAD, DUNAGHY - Lane closure, B0016, KILRAUGHTS ROAD, DUNAGHY

Lane closureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE overhead line work

13/11/2026 09:45:00 : ROADWORKS

C0090, TUMMOCK ROAD, BALLYMONEY - Road closure, C0090, TUMMOCK ROAD, BALLYMONEY

Road ClosureRoadworks will operate from 09:00 on Wed 18th Nov 2026 to 17:00 on Wed 18th Nov 2026.
Reason: NIE overhead line work
Diversion in place.

Alternative Route Via:
Diversion 1: C0090 TUMMOCK ROAD, B0016 KILRAUGHTS ROAD, U4111 LOUGHABIN ROAD

13/11/2026 09:45:00 : ROADWORKS

U5376, FORTWILLIAM ROAD, TOBERMORE - Lane closure, U5376, FORTWILLIAM ROAD, TOBERMORE

Roadworks will operate from 09:30 on Thu 12th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

13/11/2026 09:45:00 : ROADWORKS

B0040, HIGH STREET, DRAPERSTOWN - Road closure, B0040, HIGH STREET, DRAPERSTOWN

Roadworks will operate as follows:-
1700-2300Reason: Christmas Lights Event
Diversion in place.

Alternative Route Via:
Diversion 1: B0040 HIGH STREET, B0041 TOBERMORE ROAD, U5269 THE SQUAREDiversion 2:

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0024, ORMEAU ROAD, BELFAST - Lane closure, A0024, ORMEAU ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Mon 4th Jan 2027 to 16:30 on Sun 24th Jan 2027.
Reason: NIE works

13/11/2026 09:45:00 : ROADWORKS

A0001, A1 CHANCELLORS ROAD ON-SLIP ROAD (NORTH BOUND), NEWRY - Lane closure, A0001, A1 CHANCELLORS ROAD ON-SLIP ROAD (NORTH BOUND), NEWRY

Dorans Hill Newry at Chancellors Road junctionRoadworks will operate from 23:00 on Tue 24th Nov 2026 to 06:00 on Wed 25th Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection

13/11/2026 09:45:00 : ROADWORKS

A0001, A1 CHANCELLORS ROAD OFF-SLIP ROAD (NORTH BOUND), NEWRY - Road closure, A0001, A1 CHANCELLORS ROAD OFF-SLIP ROAD (NORTH BOUND), NEWRY

A1 Chancellor's Road Northbound Off-slipRoadworks will operate from 23:00 on Tue 24th Nov 2026 to 06:00 on Wed 25th Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 NEWRY BY-PASS OFF-SLIP ROAD (NORTH BOUND), A0025 CAMLOUGH ROAD, A0001 A1 NEWRY BY-PASS ON-SLIP ROAD (SOUTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), A0001 A1 NEWRY BY-PASS SLIP ROAD (SOUTH BOUND), A0001 A1 CHANCELLORS ROAD ON-SLIP ROAD (NORTH BOUND)

13/11/2026 09:45:00 : ROADWORKS

A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), NEWRY - Road closure, A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), NEWRY

A1 Chancellor's Link Southbound Off-slipRoadworks will operate from 23:00 on Tue 24th Nov 2026 to 06:00 on Wed 25th Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), A0001 NEWRY BY-PASS, A0001 A1 NEWRY BY-PASS ON-SLIP ROAD (NORTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 CHANCELLORS ROAD OFF-SLIP ROAD (NORTH BOUND), A0001 A1 CHANCELLORS ROAD ON-SLIP ROAD (NORTH BOUND)

13/11/2026 09:45:00 : ROADWORKS

A0001, A1 NEWRY BY-PASS SLIP ROAD (NORTH BOUND), NEWRY - Road closure, A0001, A1 NEWRY BY-PASS SLIP ROAD (NORTH BOUND), NEWRY

A1 Sheepbridge Northbound On-slipRoadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Tue 24th Nov 2026.
Reason: Bulk Lamp Change and Structural & Visual Inspection.
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 NEWRY BY-PASS ON-SLIP ROAD (SOUTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), A0001 NEWRY BY-PASS, A0001 A1 NEWRY BY-PASS ON-SLIP ROAD (NORTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (NORTH BOUND)

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (NORTH BOUND), LURGANARE - Road closure, A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (NORTH BOUND), LURGANARE

A1 Sheepbridge Northbound Off-slipRoadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Tue 24th Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 BELFAST ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 DUBLIN ROAD DUAL CARRIAGEWAY (NORTH BOUND), B0003 A1 DUBLIN ROAD OFF-SLIP ROAD (NORTH BOUND), B0003 DUBLIN ROAD, B0003 GROVEHILL ROAD LINK ROAD, B0003 GROVEHILL ROAD, B0003 A1 DUBLIN ROAD ON-SLIP ROAD (SOUTH BOUND), A0001 A1 DUBLIN ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 BELFAST ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND)

13/11/2026 09:45:00 : ROADWORKS

B0003, GROVEHILL ROAD LINK ROAD, LOUGHBRICKLAND - Lane closure, B0003, GROVEHILL ROAD LINK ROAD, LOUGHBRICKLAND

A1 Loughbrickland UnderpassRoadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: Bulk Lamp Change and Structural and Visual Inspection

13/11/2026 09:45:00 : ROADWORKS

B0003, A1 NEWRY ROAD ON-SLIP ROAD (NORTH BOUND), BANBRIDGE - Road closure, B0003, A1 NEWRY ROAD ON-SLIP ROAD (NORTH BOUND), BANBRIDGE

A1 Loughbrickland South Jct Northbound On-slipRoadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: B0003 DUBLIN ROAD, B0003 MAIN STREET, B0003 BANBRIDGE ROAD

13/11/2026 09:45:00 : ROADWORKS

B0003, A1 DUBLIN ROAD OFF-SLIP ROAD (NORTH BOUND), LOUGHBRICKLAND - Road closure, B0003, A1 DUBLIN ROAD OFF-SLIP ROAD (NORTH BOUND), LOUGHBRICKLAND

A1 Loughbrickland South Jct Northbound Off-slipRoadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 DUBLIN ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 NEWRY ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0026 A1 NEWRY ROAD OFF-SLIP ROAD (NORTH BOUND), A0026 NEWRY ROAD, A0001 BANBRIDGE BY-PASS, A0001 BANBRIDGE BYPASS, A0001 A1 NEWRY ROAD ON-SLIP ROAD (SOUTH BOUND), A0001 A1 NEWRY ROAD DUAL CARRIAGEWAY (SOUTH BOUND), B0003 A1 NEWRY ROAD OFF-SLIP ROAD (SOUTH BOUND), B0003 GROVEHILL ROAD LINK ROAD, B0003 DUBLIN ROAD

13/11/2026 09:45:00 : ROADWORKS

B0003, A1 DUBLIN ROAD ON-SLIP ROAD (SOUTH BOUND), LOUGHBRICKLAND - Road closure, B0003, A1 DUBLIN ROAD ON-SLIP ROAD (SOUTH BOUND), LOUGHBRICKLAND

A1 Loughbrickland South Jct Southbound On-slipRoadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: B0003 GROVEHILL ROAD LINK ROAD, B0003 DUBLIN ROAD, B0003 A1 NEWRY ROAD ON-SLIP ROAD (NORTH BOUND), A0001 A1 NEWRY ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0026 A1 NEWRY ROAD OFF-SLIP ROAD (NORTH BOUND), A0026 NEWRY ROAD, A0001 BANBRIDGE BY-PASS, A0001 BANBRIDGE BYPASS, A0001 A1 NEWRY ROAD ON-SLIP ROAD (SOUTH BOUND), A0001 A1 NEWRY ROAD DUAL CARRIAGEWAY (SOUTH BOUND)

13/11/2026 09:45:00 : ROADWORKS BELFAST

B0003, A1 NEWRY ROAD OFF-SLIP ROAD (SOUTH BOUND), LOUGHBRICKLAND - Road closure, B0003, A1 NEWRY ROAD OFF-SLIP ROAD (SOUTH BOUND), LOUGHBRICKLAND

A1 Loughbrickland South Jct Southbound Off-slipRoadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 NEWRY ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 DUBLIN ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 BELFAST ROAD DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (SOUTH BOUND), A0001 A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), A0001 NEWRY BY-PASS, A0001 A1 NEWRY BY-PASS SLIP ROAD (NORTH BOUND), A0001 A1 NEWRY BY-PASS ON-SLIP ROAD (NORTH BOUND), A0001 A1 NEWRY BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 BELFAST ROAD DUAL CARRIAGEWAY (NORTH BOUND), A0001 A1 DUBLIN ROAD DUAL CARRIAGEWAY (NORTH BOUND), B0003 A1 DUBLIN ROAD OFF-SLIP ROAD (NORTH BOUND), B0003 DUBLIN ROAD, B0003 GROVEHILL ROAD LINK ROAD

13/11/2026 09:45:00 : ROADWORKS

A0042, GALGORM ROAD, BALLYMENA - Lane closure, A0042, GALGORM ROAD, BALLYMENA

Pole swap to upgrade street works site Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Upgrading a existing street works site as a pole swap is needed to be done

13/11/2026 09:45:00 : ROADWORKS

B0020, BRYANSBURN ROAD, BANGOR - Lane closure, B0020, BRYANSBURN ROAD, BANGOR

Excavation works Roadworks will operate as follows:-
Weekends
0600 - 1200

Weekdays
0930 - 1630Reason: Excavation works - proposed new cab root and proposed new ducting & expose pole root, break out old cab roots and final reinstatment

13/11/2026 09:45:00 : ROADWORKS BELFAST

U0180, BEECHILL ROAD, BELFAST - Lane closure, U0180, BEECHILL ROAD, BELFAST

Location of worksRoadworks will operate from Mon 16th Nov 2026 to Sun 29th Nov 2026.
Continuously from first day / last day on following times:-
09:30 16-11-2026 - 16:30 29-11-2026 Reason: NIE works

13/11/2026 09:45:00 : ROADWORKS

U9178, BLACKROCK PARK, BELLEEK - Lane closure, U9178, BLACKROCK PARK, BELLEEK

Area of worksRoadworks will operate from 09:30 on Thu 12th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Excavate ground for joint holes

13/11/2026 09:45:00 : ROADWORKS

A0031, BROAD STREET, MAGHERAFELT - Road closure, A0031, QUEEN STREET, MAGHERAFELT

closureRoadworks will operate from Sat 21st Nov 2026 to Sat 21st Nov 2026.
Continuously from first day / last day on following times:-
18:00-21:30Reason: Magherafelt Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: U5180 WESTLAND ROAD, B0040 RAINEY STREET, U5145 GARDEN STREET, U5144 UNION ROAD, B0040 CHURCH STREET, C0560 KING STREET, U5146 FAIR HILL ROAD

13/11/2026 09:45:00 : ROADWORKS

B0160, MARKET STREET, MAGHERAFELT - Road closure, B0160, MARKET STREET, MAGHERAFELT

ClosureRoadworks will operate from Fri 20th Nov 2026 to Sun 22nd Nov 2026.
Continuously from first day / last day on following times:-
22:00 20_11_26 - 04:00 22_11_26Reason: Magherafelt Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: A0031 BROAD STREET, B0040 CHURCH STREET, C0560 KING STREET, U5146 FAIR HILL ROAD

13/11/2026 09:45:00 : ROADWORKS BELFAST

A0501, CASTLE PLACE, BELFAST - Road closure, A0501, CASTLE PLACE, BELFAST

Road closureRoadworks will operate from Mon 4th Jan 2027 to Sun 18th Apr 2027.
Continuously from first day / last day on following times:-
ContinuousReason: SuDS Transformation Project and Active Travel Scheme
Diversion in place.

Alternative Route Via:
Diversion 1: U0620 BRIDGE STREET, U0620 NORTH STREET, A0006 ROYAL AVENUE

13/11/2026 09:45:00 : ROADWORKS

U4469, MEETING HOUSE ROAD, BANBRIDGE - Road closure, U4469, MEETING HOUSE ROAD, BANBRIDGE

Meeting House RoadRoadworks will operate from Mon 30th Mar 2026 to Thu 30th Sep 2027.
Continuously from first day / last day on following times:-
Continuous due to new development construction

Reason: To facilitate construction of social housing.
Diversion in place.

Alternative Route Via:
Diversion 1: C0351 LINENHALL STREET, U4469 COMMERCIAL ROAD, B0010 SCARVA STREET

12/11/2026 11:40:00 : ROADWORKS

B0018, Whitesides Road, Mount Hilary , - Road Closure, B0018, Whitesides Road, Mount Hilary

Road closure required For NIE Overhead Line Works.
Closure to operate: Daily.  Diversion to operate, delays expected.
Alternative Route Via: B0018 WHITESIDES ROAD, C0048 SLAGHT ROAD, C0048 MAGHERALANE ROAD, B0053 STATION ROAD, A0006 BRIDGE STREET, A0006 MAIN STREET, B0052 MAIN STREET, B0052 PORTGLENONE ROAD, B0093 AHOGHILL ROAD.

10/11/2026 09:02:00 : ROADWORKS

U8102, VICTORIA ROAD, HOLYWOOD - Lane closure, U8102, VICTORIA ROAD, HOLYWOOD

lane closureRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: cabling works

10/11/2026 09:02:00 : ROADWORKS

C0267, BALLYDRAIN ROAD, COMBER - Lane closure, C0267, BALLYDRAIN ROAD, COMBER

Location of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Replace or Inst Boundary Box or S Cock

10/11/2026 09:02:00 : ROADWORKS

U3112, BROADLANDS PARK, CARRICKFERGUS - Lane closure, U3112, BROADLANDS PARK, CARRICKFERGUS

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U3111, DOWNSHIRE DRIVE, CARRICKFERGUS - Lane closure, U3111, DOWNSHIRE DRIVE, CARRICKFERGUS

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U3112, BROADLANDS GARDENS, CARRICKFERGUS - Lane closure, U3112, BROADLANDS GARDENS, CARRICKFERGUS

59 Broadlands Gardens, Carrickfergus BT38 7BJRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS BELFAST

U8007, OLD BELFAST ROAD, BANGOR - Lane closure, U8007, OLD BELFAST ROAD, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U3109, VICTORIA RISE, CARRICKFERGUS - Lane closure, U3109, VICTORIA RISE, CARRICKFERGUS

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U8038, DUNKELD PARK, BANGOR - Lane closure, U8038, DUNKELD PARK, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U8027, FERNMORE ROAD, BANGOR - Lane closure, U8027, FERNMORE ROAD, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U8003, AVA FARM, BANGOR - Lane closure, U8003, AVA FARM, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U8039, BROOK LANE, BANGOR - Lane closure, U8039, BROOK LANE, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

U8037, PINEHILL CRESCENT, BANGOR - Lane closure, U8037, PINEHILL CRESCENT, BANGOR

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: new gas connection

10/11/2026 09:02:00 : ROADWORKS

B0192, DRUMRANE ROAD, LIMAVADY - Lane closure, B0192, DRUMRANE ROAD, LIMAVADY

Drumrane Road, Limavady Roadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: New connection for customer

10/11/2026 09:02:00 : ROADWORKS

C0210, BALLYGROOBANY ROAD, RICHHILL - Road closure, C0210, BALLYGROOBANY ROAD, RICHHILL

Roadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0210 BALLYGROOBANY ROAD, A0051 MARLACOO ROAD, B0111 ANNAREAGH ROAD, B0111 THE NEW LINE, B0131 MULLALELISH ROAD

10/11/2026 09:02:00 : ROADWORKS

C0367, BALLYBUNDEN ROAD, KILLINCHY - Lane closure, C0367, BALLYBUNDEN ROAD, KILLINCHY

C0367, BALLYBUNDEN ROAD, KILLINCHYRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Testing, Rodding and Roping with possible minor excavation on the Fibrus Network

10/11/2026 09:02:00 : ROADWORKS

U4143, BRIDGE ROAD, DUNLOY - Lane closure, U4143, BRIDGE ROAD, DUNLOY

Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Work

10/11/2026 09:01:00 : ROADWORKS

U0212, VESTRY ROAD, BALLYGOWAN - Road closure, U0212, VESTRY ROAD, BALLYGOWAN

Road ClosureRoadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: Full Service Water Connection
Diversion in place.

Alternative Route Via:
Diversion 1: U0211 MANSE ROAD, C0271 STATION ROAD, C0272 CARRICKMANNON ROAD

10/11/2026 09:01:00 : ROADWORKS

A0002, SHORE ROAD, GREENISLAND - Lane closure, A0002, SHORE ROAD, GREENISLAND

Location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Replace or Relay or Transfer Comms Pipe

10/11/2026 09:01:00 : ROADWORKS

B0031, ARMAGH ROAD, NEWTOWNHAMILTON - Lane closure, B0031, ARMAGH ROAD, NEWTOWNHAMILTON

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: BT Openreach

10/11/2026 09:01:00 : ROADWORKS

U8030, RATHGILL LINK, BANGOR - Lane closure, U8030, RATHGILL LINK, BANGOR

Lane ClosureRoadworks will operate from 09:30 on Thu 10th Dec 2026 to 16:30 on Thu 10th Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9014, STRATHEDEN HEIGHTS, NEWTOWNARDS - Lane closure, U9014, STRATHEDEN HEIGHTS, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9016, DRUMMOND PARK, NEWTOWNARDS - Lane closure, U9016, DRUMMOND PARK, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U4128, TAUGHEY ROAD, BALLYMONEY - Lane closure, U4128, TAUGHEY ROAD, BALLYMONEY

U4128, TAUGHEY ROAD, BALLYMONEYRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network

10/11/2026 09:01:00 : ROADWORKS

U9023, OLD FORGE AVENUE, NEWTOWNARDS - Lane closure, U9023, OLD FORGE AVENUE, NEWTOWNARDS

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U8029, STONEBRIDGE GARDENS, BANGOR - Lane closure, U8029, STONEBRIDGE GARDENS, BANGOR

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U9016, INISHAROAN COURT, NEWTOWNARDS - Lane closure, U9016, INISHAROAN COURT, NEWTOWNARDS

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U0277, DARRAGH ROAD, COMBER - Lane closure, U0277, DARRAGH ROAD, COMBER

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U9001, MYOLA PLACE, NEWTOWNARDS - Lane closure, U9001, MYOLA PLACE, NEWTOWNARDS

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U9014, KENSINGTON PARK, NEWTOWNARDS - Lane closure, U9014, KENSINGTON PARK, NEWTOWNARDS

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U9600, RAVARA DALE, BALLYGOWAN - Lane closure, U9600, RAVARA DALE, BALLYGOWAN

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

U7117, KILLUNEY ROAD, ARMAGH - Road closure, U7117, KILLUNEY ROAD, ARMAGH

road closure Roadworks will operate from 09:30 on Sat 21st Nov 2026 to 16:30 on Sun 22nd Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0003 PORTADOWN ROAD, A0003 COLLEGE HILL, B0089 DRUMADD ROAD, B0091 DRUMADD ROAD, A0051 HAMILTONSBAWN ROAD, C0209 TIRNASCOBE ROAD

10/11/2026 09:01:00 : ROADWORKS

A0046, LOUGH SHORE ROAD, DERRYGONN - Lane closure, A0046, LOUGH SHORE ROAD, DERRYGONN

Roadworks will operate from 00:00 on Wed 28th Oct 2026 to 23:59 on Fri 27th Nov 2026.
Reason: Emergency Works, Road Subsiding

10/11/2026 09:01:00 : ROADWORKS

B0012, AGHALEE ROAD, AGHAGALLON - Lane closure, B0012, AGHALEE ROAD, AGHAGALLON

lane closure Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE CIVLS AND CABLING WORKS

10/11/2026 09:01:00 : ROADWORKS

C0153, CASTOR BAY ROAD, LURGAN - Road closure, C0153, CASTOR BAY ROAD, LURGAN

Work locationRoadworks will operate from Mon 30th Nov 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
Install 30.11.26 at 07:00 to remove 11.12.26 at 17:00 Approved JL 29-10-2026 09:30 16:30Reason: Road resurfacing for DFI
Diversion in place.

Alternative Route Via:
Diversion 1: U1019 KILLAGHY ROAD, B0012 CORNAKINNEGAR ROAD, B0012 ANTRIM ROAD, C0153 LAKE STREET, C0153 CASTOR BAY ROAD

10/11/2026 09:01:00 : ROADWORKS

B0012, AGHALEE ROAD, AGHAGALLON - Lane closure, B0012, AGHALEE ROAD, AGHAGALLON

lane closure Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS

10/11/2026 09:01:00 : ROADWORKS

U1027, MOYTOWN ROAD, AGHAGALLON - Road closure, U1027, MOYTOWN ROAD, AGHAGALLON

road closure Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U1024 FEATHERBED ROAD, B0156 DERRYHIRK ROAD, B0156 WHITEHALL ROAD, B0012 LURGAN ROAD, B0012 AGHALEE ROAD

10/11/2026 09:01:00 : ROADWORKS

B0094, MAIN STREET, CLOUGH CO ANTRIM - Lane closure, B0094, MAIN STREET, CLOUGH CO ANTRIM

lane closure Roadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: POLING WORKS

10/11/2026 09:01:00 : ROADWORKS

U0212, VESTRY ROAD, BALLYGOWAN - Road closure, U0212, VESTRY ROAD, BALLYGOWAN

Roadworks will operate from 09:00 on Fri 20th Nov 2026 to 17:00 on Fri 20th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U0212 VESTRY ROAD, U0211 MANSE ROAD, A0021 SAINTFIELD ROAD

10/11/2026 09:01:00 : ROADWORKS

C0340, GLASKERBEG ROAD, MILLTOWN - Road closure, C0340, GLASKERBEG ROAD, MILLTOWN

road closure Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: FRAME & COVER
Diversion in place.

Alternative Route Via:
Diversion 1: C0336 OULEY ROAD, U4371 GLASCAR ROAD

10/11/2026 09:01:00 : ROADWORKS

A0051, MADDEN ROAD, TANDRAGEE - Road closure, A0051, MADDEN ROAD, TANDRAGEE

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE Tree Cutting
Diversion in place.

Alternative Route Via:
Diversion 1: A0051 TANDRAGEE ROAD, B0003 SCARVA ROAD, B0003 GILFORD ROAD, B0003 GLENLOUGHAN ROAD, B0003 MAIN STREET, B0010 STATION ROAD, A0027 AUGHLISH ROAD, A0027 SCARVA ROAD, A0027 MILL STREET, A0027 MARKET STREET, A0051 MADDEN ROAD

10/11/2026 09:01:00 : ROADWORKS

U4091, THE WOODS, LARNE - Lane closure, U4091, THE WOODS, LARNE

Lane ClosureRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U3124, DOWNVIEW ROAD, GREENISLAND - Lane closure, U3124, DOWNVIEW ROAD, GREENISLAND

Lane ClosureRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

A0003, LURGAN ROAD, MOIRA - Lane closure, A0003, LURGAN ROAD, MOIRA

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Work

10/11/2026 09:01:00 : ROADWORKS

U9017, BURNREAGH DRIVE, NEWTOWNARDS - Lane closure, U9017, BURNREAGH DRIVE, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9014, STRATHEDEN HEIGHTS, NEWTOWNARDS - Lane closure, U9014, STRATHEDEN HEIGHTS, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9016, SLIEVEMORE AVENUE, NEWTOWNARDS - Lane closure, U9016, SLIEVEMORE AVENUE, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9014, REGENCY PARK, NEWTOWNARDS - Lane closure, U9014, REGENCY PARK, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Thu 3rd Dec 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9018, MOYNE GARDENS, NEWTOWNARDS - Lane closure, U9018, MOYNE GARDENS, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 2nd Dec 2026 to 16:30 on Wed 2nd Dec 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

C0065, RACAVAN ROAD, RACAVAN - Road closure, C0065, RACAVAN ROAD, RACAVAN

Roadworks will operate from 09:00 on Thu 26th Nov 2026 to 17:00 on Thu 26th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0065 RACAVAN ROAD, C0066 LISNAMURRIKIN ROAD, B0094 RATHKEEL ROAD

10/11/2026 09:01:00 : ROADWORKS

B0027, SLIEVENAMAN ROAD, ATTICAL - Road closure, B0027, SLIEVENAMAN ROAD, ATTICAL

Roadworks will operate from 09:00 on Mon 9th Nov 2026 to 17:00 on Fri 27th Nov 2026.
Reason: Patching Works
Diversion in place.

Alternative Route Via:
Diversion 1: B0027 KILKEEL ROAD, B0180 BRYANSFORD ROAD, B0180 HILLTOWN ROAD, B0180 BRYANSFORD VILLAGE, B0180 BRYANSFORD AVENUE, A0002 CENTRAL PROMENADE, A0002 MAIN STREET, A0002 RAILWAY STREET, A0002 DUNDRUM ROAD, A0050 DUNDRUM ROAD, A0050 CASTLEWELLAN ROAD, U6207 SHIMNA ROAD, A0002 SOUTH PROMENADE, A0002 KILKEEL ROAD, A0002 BALLAGH ROAD, A0002 GLASSDRUMMAN ROAD, A0002 ANNALONG ROAD, A0002 MAIN ROAD, A0002 NEWCASTLE ROAD, A0002 NEWCASTLE STREET, A0002 THE SQUARE, A0002 BRIDGE STREET, B0027 MOUNTAIN ROAD, B0027 MOYAD ROAD

10/11/2026 09:01:00 : ROADWORKS

U0034, CULLYBURN ROAD, NEWTOWNABBEY - Road closure, U0034, CULLYBURN ROAD, NEWTOWNABBEY

Location of worksRoadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW - Replace or Inst Boundary Box or S Cock
Diversion in place.

Alternative Route Via:
Diversion 1: U0034 CULLYBURN ROAD, U0015 REA HILL ROAD, C0031 CARNTALL ROAD, B0059 DOAGH ROAD, B0090 OLD CARRICK ROAD

10/11/2026 09:01:00 : ROADWORKS

A0002, SHORE ROAD, NEWTOWNABBEY - Lane closure, A0002, SHORE ROAD, NEWTOWNABBEY

Shore Road, NewtownabbeyRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Tree works for DFI

10/11/2026 09:01:00 : ROADWORKS

B0095, BALLYCLARE ROAD, DOAGH - Lane closure, B0095, BALLYCLARE ROAD, DOAGH

Ballyclare Road, Doagh Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Tree work for DFI

10/11/2026 09:01:00 : ROADWORKS

C0274, BARNAMAGHERY ROAD, CROSSGAR - Road closure, C0274, BARNAMAGHERY ROAD, CROSSGAR

Roadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0274 BARNAMAGHERY ROAD, B0006 MANSE ROAD, U0329 TEMPLEBURN ROAD, U0377 TEMPLEBURN ROAD

10/11/2026 09:01:00 : ROADWORKS

C0272, CARRICKMANNON ROAD, BALLYGOWAN - Lane closure, C0272, CARRICKMANNON ROAD, BALLYGOWAN

Location of worksRoadworks will operate from Tue 24th Nov 2026 to Wed 25th Nov 2026.
Continuously from first day / last day on following times:-
from end of permit 84429 16:30 23-11-2025 - 16:30 25-11-2026 Reason: NIW works

10/11/2026 09:01:00 : ROADWORKS

A0003, MAIN STREET, BANGOR - Lane closure, A0003, CASTLE STREET, BANGOR

Location of worksRoadworks will operate from Mon 23rd Nov 2026 to Mon 23rd Nov 2026.
Continuously from first day / last day on following times:-
Continuous from end of permit 83906 - 12:00 22-11-2026 - 16:30 23-11-2026Reason: NIW - Replacement PRV

10/11/2026 09:01:00 : ROADWORKS

B0520, TULLYWIGGAN ROAD, TULLYWIGGAN - Lane closure, B0520, TULLYWIGGAN ROAD, TULLYWIGGAN

TULLYWIGGAN ROAD, COOKSTOWNRoadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation of new duct

10/11/2026 09:01:00 : ROADWORKS

U9009, MARK STREET, NEWTOWNARDS - Lane closure, U9009, MARK STREET, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

B0027, SLIEVENAMAN ROAD, ATTICAL - Road closure, B0027, SLIEVENAMAN ROAD, ATTICAL

Roadworks will operate from 08:00 on Mon 9th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: Carriageway Surfacing Patches
Diversion in place.

Alternative Route Via:
Diversion 1: B0027 KILKEEL ROAD, B0180 BRYANSFORD ROAD, B0180 HILLTOWN ROAD, B0180 BRYANSFORD VILLAGE, B0180 BRYANSFORD AVENUE, U6207 SHIMNA ROAD, A0050 CASTLEWELLAN ROAD, A0050 DUNDRUM ROAD, A0002 DUNDRUM ROAD, A0002 RAILWAY STREET, A0002 MAIN STREET, A0002 CENTRAL PROMENADE, A0002 SOUTH PROMENADE, A0002 KILKEEL ROAD, A0002 BALLAGH ROAD, A0002 GLASSDRUMMAN ROAD, B0027 MOYAD ROAD, B0027 MOUNTAIN ROAD, A0002 ANNALONG ROAD, A0002 MAIN ROAD, A0002 NEWCASTLE ROAD, A0002 NEWCASTLE STREET, A0002 BRIDGE STREET, A0002 THE SQUARE

10/11/2026 09:01:00 : ROADWORKS

U2109, BALLYGELLY ROAD, BROUGHSHANE - Road closure, U2109, BALLYGELLY ROAD, BROUGHSHANE

Roadworks will operate from 09:00 on Tue 24th Nov 2026 to 17:00 on Tue 24th Nov 2026.
Reason: NIE Overhead Line Works
Diversion in place.

Alternative Route Via:
Diversion 1: U2109 BALLYGELLY ROAD, C0065 RACAVAN ROAD, C0066 LISNAMURRIKIN ROAD

10/11/2026 09:01:00 : ROADWORKS

B0090, OLD CARRICK ROAD, NEWTOWNABBEY - Lane closure, B0090, OLD CARRICK ROAD, NEWTOWNABBEY

Works LocationRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Tue 1st Dec 2026.
Reason: To facilitate cable recovery for Openreach

10/11/2026 09:01:00 : ROADWORKS

C0153, CASTOR BAY ROAD, LURGAN - Lane closure, C0153, CASTOR BAY ROAD, LURGAN

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace or Relevel SV AV FH Box

10/11/2026 09:01:00 : ROADWORKS

C0035, MONKSTOWN ROAD, NEWTOWNABBEY - Lane closure, C0035, MONKSTOWN ROAD, NEWTOWNABBEY

Works LocationRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: To facilitate cable recovery for Openreach

10/11/2026 09:01:00 : ROADWORKS

U0520, CADIAN ROAD, EGLISH - Road closure, U0520, CADIAN ROAD, EGLISH

CADIAN ROAD, EGLISHRoadworks will operate from 09:30 on Wed 28th Oct 2026 to 16:30 on Sat 28th Nov 2026.
Reason: installation of BT duct
Diversion in place.

Alternative Route Via:
Diversion 1: U0524 TERRYGLASSOG ROAD, B0045 EGLISH ROAD, C0646 KILLYLISS ROAD, C0646 KILNACART ROAD, U0519 DERRYLATTINEE ROAD

10/11/2026 09:01:00 : ROADWORKS

A0027, MARKET STREET, PORTADOWN - Lane closure, A0027, HIGH STREET, PORTADOWN

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace Manhole Cover and Frame

10/11/2026 09:01:00 : ROADWORKS

A0003, EDWARD STREET, LURGAN - Lane closure, A0003, EDWARD STREET, LURGAN

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace Manhole Cover and Frame

10/11/2026 09:01:00 : ROADWORKS

A2002, CLOONEY ROAD, BALLYKELLY - Lane closure, A2002, CLOONEY ROAD, BALLYKELLY

A2002, CLOONEY ROAD, GREYSTEELRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils to clear blockages on the Fibrus Network

10/11/2026 09:01:00 : ROADWORKS

U4136, DRUMHORC ROAD, GILFORD - Road closure, U4136, DRUMARAN ROAD, GILFORD

Road ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Fibre install to customers house, 35 Drumhorc Road
Diversion in place.

Alternative Route Via:
Diversion 1: U4136 DRUMHORC ROAD, U4135 TULLYLISH ROAD, U4135 DRUMARAN ROAD, C0350 LOUGHBRICKLAND ROAD, U4138 DRUMARAN ROADDiversion 2: C0352 BLUE ROAD, U4139 KERNAN LOUGH ROAD

10/11/2026 09:01:00 : ROADWORKS

B0003, PLANTATION ROAD, BLEARY - Lane closure, B0003, PLANTATION ROAD, BLEARY

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE Overhead Line Work

10/11/2026 09:01:00 : ROADWORKS

B0010, GLENLOUGHAN ROAD, SCARVA - Lane closure, B0010, GLENLOUGHAN ROAD, SCARVA

Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIE Tree Cutting

10/11/2026 09:01:00 : ROADWORKS

C0272, CARRICKMANNON ROAD, BALLYGOWAN - Lane closure, C0272, CARRICKMANNON ROAD, BALLYGOWAN

Location of worksRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIW works

10/11/2026 09:01:00 : ROADWORKS

A0076, LOUGH ROAD, LURGAN - Lane closure, A0076, LOUGH ROAD, LURGAN

Location of worksRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Replace or Relevel SV AV FH Box

10/11/2026 09:01:00 : ROADWORKS

U0536, STRANGFORD VIEW, GREYABBEY - Lane closure, U0536, STRANGFORD VIEW, GREYABBEY

Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIE Substation Maintenance

10/11/2026 09:01:00 : ROADWORKS

A0002, NEWCASTLE STREET, KILKEEL - Lane closure, A0002, NEWCASTLE STREET, KILKEEL

Location of worksRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: NIW -Repair Gravity Sewer

10/11/2026 09:01:00 : ROADWORKS

U0160, DRUMBUCK ROAD, CASTLEWELLAN - Road closure, U0160, DRUMBUCK ROAD, CASTLEWELLAN

Road ClosureRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: NIW Meter Works
Diversion in place.

Alternative Route Via:
Diversion 1: U0160 DRUMBUCK ROAD, A0025 MILL HILL, C0324 CLARKILL ROAD

10/11/2026 09:01:00 : ROADWORKS

A0029, DRUMGRANNON ROAD, MOY - Lane closure, A0029, DRUMGRANNON ROAD, MOY

Work AreaRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Fibre install for customer

10/11/2026 09:01:00 : ROADWORKS

U4328, DOLLYS BRAE, BALLYWARD - Road closure, U4328, DOLLYS BRAE, BALLYWARD

Road ClosureRoadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: NIW Meter Works
Diversion in place.

Alternative Route Via:
Diversion 1: U4329 BALLYMAGREEHAN ROAD, A0050 BANN ROAD, U4324 MAGHERAMAYO ROAD

10/11/2026 09:01:00 : ROADWORKS

C0322, CLOSKELT ROAD, MONEYSLANE - Road closure, C0322, CLOSKELT ROAD, MONEYSLANE

Road ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIW Meter Works
Diversion in place.

Alternative Route Via:
Diversion 1: B0007 MONEYSLANE ROAD, U4277 SPLITBOG ROAD, U4276 CLOSKELT ROAD, C0322 CLOSKELT ROAD

10/11/2026 09:01:00 : ROADWORKS

U9011, UPPER NORTH STREET, NEWTOWNARDS - Lane closure, U9011, UPPER NORTH STREET, NEWTOWNARDS

lane closure Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: poling works

10/11/2026 09:01:00 : ROADWORKS

U7493, DRUMARD ROAD, KILMORE CO ARMAGH - Road closure, U7493, DRUMARD ROAD, KILMORE CO ARMAGH

road closure Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: BT POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: C0163 BATTLEHILL ROAD, B0131 KILMORE ROAD, B0077 RED LION ROAD

10/11/2026 09:01:00 : ROADWORKS

C0163, COHARRA ROAD, PORTADOWN - Road closure, C0163, COHARRA ROAD, PORTADOWN

road closure Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: BT POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: B0077 LOUGHGALL ROAD, C0162 CORCULLENTRAGH ROAD, B0028 MOY ROAD

10/11/2026 09:01:00 : ROADWORKS

U0311, LISBANE ROAD, KIRCUBBIN - Road closure, U0311, LISBANE ROAD, KIRCUBBIN

road closure Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: POLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0020 ROWREAGH ROAD, U0140 GRANSHA ROAD, U0310 BLACKSTAFF ROAD

10/11/2026 09:01:00 : ROADWORKS

B0007, TIRKELLY HILL ROAD, BALLYRONEY - Lane closure, B0007, TIRKELLY HILL ROAD, BALLYRONEY

LANE CLOSURERoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: BT POLING WORKS

10/11/2026 09:01:00 : ROADWORKS

U6102, CABRAGH ROAD, MAYOBRIDGE - Road closure, U6102, CABRAGH ROAD, MAYOBRIDGE

road closure Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: poling works
Diversion in place.

Alternative Route Via:
Diversion 1: U6103 CROSSAN ROAD, B0008 NEWRY ROAD, B0007 BAVAN ROAD

10/11/2026 09:01:00 : ROADWORKS

A0022, CATHERINE STREET, KILLYLEAGH - Lane closure, A0022, CATHERINE STREET, KILLYLEAGH

Lane ClosureRoadworks will operate from 09:30 on Wed 25th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Installation of CIPP Liner from existing sewer manholes

10/11/2026 09:01:00 : ROADWORKS

B0077, RED LION ROAD, LOUGHGALL - Lane closure, B0077, RED LION ROAD, LOUGHGALL

B0077 RED LION RD Roadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: UNDERGROUND CABLING WORKS AND CLEAR ANY BLOCKAGES FOUND

10/11/2026 09:01:00 : ROADWORKS

B0173, RUBANE ROAD, KIRCUBBIN - Lane closure, B0173, RUBANE ROAD, KIRCUBBIN

lane closure Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: POLING WORKS

10/11/2026 09:01:00 : ROADWORKS

U6402, KINGS LANE, WARRENPOINT - One Way closure, U6402, KINGS LANE, WARRENPOINT

road closureRoadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: U6402 SUMMER HILL, C0332 GREAT GEORGES STREET, A0002 CHURCH STREET

10/11/2026 09:01:00 : ROADWORKS

U2130, KNOWEHEAD ROAD, BROUGHSHANE - Road closure, U2130, KNOWEHEAD ROAD, BROUGHSHANE

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole Testing
Diversion in place.

Alternative Route Via:
Diversion 1: B0094 KNOCKAN ROAD, A0042 MAIN STREET, A0042 CARNLOUGH ROAD, C0068 TULLYMORE ROAD, C0068 POLLEE ROAD

10/11/2026 09:01:00 : ROADWORKS

U9015, WALLACES STREET, NEWTOWNARDS - Lane closure, U9015, WALLACES STREET, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

C0251, CRAWFORDSBURN ROAD, NEWTOWNARDS - Lane closure, C0251, CRAWFORDSBURN ROAD, NEWTOWNARDS

Lane ClosureRoadworks will operate from 08:00 on Sun 22nd Nov 2026 to 18:00 on Sun 22nd Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9013, ROSEVALE AVENUE, NEWTOWNARDS - Lane closure, U9013, ROSEVALE AVENUE, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

B0010, MONTEITH ROAD, ANNACLONE - Lane closure, B0010, MONTEITH ROAD, ANNACLONE

MONTEITH ROAD, ANNACLONERoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: renewal of BT pole

10/11/2026 09:01:00 : ROADWORKS

U4334, SEAFIN ROAD, RATHFRILAND - Road closure, U4334, SEAFIN ROAD, RATHFRILAND

SEAFIN ROAD, RATHFRILANDRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: renewal of BT pole
Diversion in place.

Alternative Route Via:
Diversion 1: B0010 MAYS CORNER ROAD, B0025 KATESBRIDGE ROAD

10/11/2026 09:01:00 : ROADWORKS

B0048, DUNCASTLE ROAD, DONEMANA - Lane closure, B0048, DUNCASTLE ROAD, DONEMANA

B0048, DUNCASTLE ROAD, DONEMANARoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Splicing & Testing on the Fibrus Network

10/11/2026 09:01:00 : ROADWORKS

U1416, CHARLES BARON CRESCENT, LURGAN - Lane closure, U1416, CHARLES BARON CRESCENT, LURGAN

Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: Installing new gas connection to customer os 3 as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

A0026, BANBRIDGE ROAD, WARINGSTOWN - Lane closure, A0026, BANBRIDGE ROAD, WARINGSTOWN

Roadworks will operate from Mon 16th Nov 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
16.11 8am start Approved JL 27-10-2027 09:00 16:30Reason: DFI Roads - Footway Surfacing

10/11/2026 09:01:00 : ROADWORKS

U1230, CIDERCOURT PARK, CRUMLIN - Lane closure, U1230, CIDERCOURT PARK, CRUMLIN

Roadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: Installing new gas connection to customer os 25 as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

A0050, DUNBARTON STREET, GILFORD - Lane closure, A0050, DUNBARTON STREET, GILFORD

Roadworks will operate from Mon 16th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
16.11 8am Reason: DFI Roads - Replace Guard Rails

10/11/2026 09:01:00 : ROADWORKS

U7005, ABBEY PARK, ARMAGH - Lane closure, U7005, ABBEY PARK, ARMAGH

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: Installing new gas connection to customer so 101 as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

C0370, BALLYLONE ROAD, BALLYNAHINCH - Road closure, C0370, BALLYLONE ROAD, BALLYNAHINCH

Work locationRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: New connection for customer
Diversion in place.

Alternative Route Via:
Diversion 1: U0170 HALL ROAD, U0123 MOSS ROAD

10/11/2026 09:01:00 : ROADWORKS

A0027, LURGAN ROAD, PORTADOWN - Lane closure, A0027, LURGAN ROAD, PORTADOWN

Roadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Installing new gas connection to customer os 18 using TL as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

C0153, LAKE STREET, LURGAN - Lane closure, C0153, LAKE STREET, LURGAN

Roadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Installing new gas connection to customer os 136 using TL as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

A0045, DUNGANNON ROAD, COALISLAND - Lane closure, A0045, DUNGANNON ROAD, COALISLAND

Roadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Required to carry out footway improvement works

10/11/2026 09:01:00 : ROADWORKS

B0113, DUBLIN ROAD, NEWRY - Lane closure, B0113, DUBLIN ROAD, NEWRY

Works LocationRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Fibre install to customers house, 181B Dublin Road

10/11/2026 09:01:00 : ROADWORKS

A0025, CASTLEWARD ROAD, STRANGFORD - Lane closure, A0025, CASTLEWARD ROAD, STRANGFORD

Location of worksRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: NIW - meter works

10/11/2026 09:01:00 : ROADWORKS

U6292, THE BEECHES, NEWRY - Lane closure, U6292, THE BEECHES, NEWRY

The BeechesRoadworks will operate from 08:00 on Mon 2nd Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: Laying of Storm pipe

10/11/2026 09:01:00 : ROADWORKS

U9001, JUBILEE ROAD, NEWTOWNARDS - Lane closure, U9001, JUBILEE ROAD, NEWTOWNARDS

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Full Service Water Connx

10/11/2026 09:01:00 : ROADWORKS

U0239, KILCLIEF ROAD, KILCLIEF - Road closure, U0239, KILCLIEF ROAD, KILCLIEF

Road closure Roadworks will operate as follows:-
0700 to 1300Reason: NIW - Meter works
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 ARDGLASS ROAD, U0238 BISHOPS COURT ROAD

10/11/2026 09:01:00 : ROADWORKS

U0015, REA HILL ROAD, NEWTOWNABBEY - Road closure, U0015, REA HILL ROAD, NEWTOWNABBEY

Road closure Roadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: NIW works - Replace Missing SV Lid
Diversion in place.

Alternative Route Via:
Diversion 1: U0034 CULLYBURN ROAD, B0090 OLD CARRICK ROAD, B0059 DOAGH ROAD, C0031 CARNTALL ROAD

10/11/2026 09:01:00 : ROADWORKS

U7001, WOODLAND PARK, LISBURN - Road closure, U7001, WOODLAND PARK, LISBURN

Road closure Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: NIW works - replace manhole cover and frame
Diversion in place.

Alternative Route Via:
Diversion 1: U7001 WOODLAND PARK, U7000 WARREN GARDENS, U7002 WARREN PARK, A0001 HILLSBOROUGH ROAD

10/11/2026 09:01:00 : ROADWORKS

A0050, KATESBRIDGE ROAD, KATESBRIDGE - Lane closure, A0050, KATESBRIDGE ROAD, KATESBRIDGE

KATESBRIDGE ROAD, KATESBRIDGERoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: renewal of BT pole

10/11/2026 09:01:00 : ROADWORKS

B0025, MANSE ROAD, KATESBRIDGE - Road closure, B0025, MANSE ROAD, KATESBRIDGE

Manse Road, KatesbridgeRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: renewal of BT pole
Diversion in place.

Alternative Route Via:
Diversion 1: A0050 KATESBRIDGE ROAD, B0025 MANSE ROAD

10/11/2026 09:01:00 : ROADWORKS

C0326, BALLYRONEY ROAD, BALLYRONEY - Road closure, C0326, BALLYRONEY ROAD, BALLYRONEY

BALLYRONEY ROAD, MONEYSLANERoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: renewal of BT pole
Diversion in place.

Alternative Route Via:
Diversion 1: B0007 DROMARA ROAD, A0050 KATESBRIDGE ROAD

10/11/2026 09:01:00 : ROADWORKS BELFAST

C0280, FINNEBROGUE ROAD, DOWNPATRICK - Road closure, C0280, FINNEBROGUE ROAD, DOWNPATRICK

Road ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Fibre install to customers house, 25 Finnebrogue Road
Diversion in place.

Alternative Route Via:
Diversion 1: A0007 BELFAST ROAD, A0025 NEW BRIDGE STREET, A0022 OLD BELFAST ROAD, A0022 KILLYLEAGH ROAD, C0280 FINNEBROGUE ROAD

10/11/2026 09:01:00 : ROADWORKS

U6293, UPPER DAMOLLY ROAD, NEWRY - Lane closure, U6293, UPPER DAMOLLY ROAD, NEWRY

os 16 upper damolly roadRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: installation of new gas service to 16 upper damolly road with traffic lights as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

U1414, SHIMNA WALK, LURGAN - Lane closure, U1414, SHIMNA WALK, LURGAN

os 4 shimna walkRoadworks will operate from 08:00 on Fri 20th Nov 2026 to 18:00 on Thu 26th Nov 2026.
Reason: installation of new gas service to 4 shimna walk as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

U5050, LATT VILLAS, NEWRY - Lane closure, U5050, LATT VILLAS, NEWRY

os 8 latt villasRoadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: installation of new gas service to 8 latt villas as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

C0298, MEALOUGH ROAD, LISBURN - Road closure, C0298, MEALOUGH ROAD, LISBURN

Closure MapRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 23rd Dec 2026.
Reason: Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0298 MEALOUGH ROAD, A0024 SAINTFIELD ROAD, A0007 SAINTFIELD ROAD, A0024 BALLYNAHINCH ROAD, B0178 HILLSBOROUGH ROAD, B0178 COMBER ROAD, C0298 FRONT ROAD

10/11/2026 09:01:00 : ROADWORKS

U2136, EGLISH ROAD, BALLYMENA - Road closure, U2136, EGLISH ROAD, BALLYMENA

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole testing
Diversion in place.

Alternative Route Via:
Diversion 1: B0094 KNOCKAN ROAD, U2136 CARNCOAGH ROAD

10/11/2026 09:01:00 : ROADWORKS

U1388, DRUMBEG, CRAIGAVON - Lane closure, U1388, DRUMBEG, CRAIGAVON

os 110 drumbegRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: installation of new gas service to 110 drumbeg as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

U1386, HILLCREST MEWS, CRAIGAVON - Lane closure, U1386, HILLCREST MEWS, CRAIGAVON

os 18 hillcrest mewsRoadworks will operate from 08:00 on Thu 19th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: installation of new gas service to 18 hillcrest mews as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

U1401, MANSEFIELD, LURGAN - Lane closure, U1401, MANSEFIELD, LURGAN

os 21 mansefield Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: installation of new gas service to 21 mansefield as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

B0003, COOLMILLISH ROAD, MARKETHILL - Lane closure, B0003, COOLMILLISH ROAD, MARKETHILL

COOLMILLISH ROAD, MARKETHILLRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: installation off overhead and underground BT cable

10/11/2026 09:01:00 : ROADWORKS

U1202, RATHKELTAIR ROAD, DOWNPATRICK - Lane closure, U1202, RATHKELTAIR ROAD, DOWNPATRICK

RATHKELTAIR ROAD, DOWNPATRICKRoadworks will operate from Mon 16th Nov 2026 to Wed 18th Nov 2026.
Continuously from first day / last day on following times:-
installation of 0930 first dayReason: rebuild of BT footway box

10/11/2026 09:01:00 : ROADWORKS

U7542, IRISH STREET, DUNGANNON - Road closure, U7542, IRISH STREET, DUNGANNON

Roadworks will operate as follows:-
19:00-06:00Reason: Installation of new gas mains
Diversion in place.

Alternative Route Via:
Diversion 1: U7512 GREERS ROAD, U7512 THOMAS STREET, U7538 MARKET SQUARE

10/11/2026 09:01:00 : ROADWORKS

U7732, ROSE PARK, LAURELVALE - Lane closure, U7732, ROSE PARK, LAURELVALE

os 12 rose park Roadworks will operate from 08:00 on Wed 18th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: installation of new gas service to 12 rose park as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

U4472, BALLYDOWN MEADOWS, BANBRIDGE - Lane closure, U4472, BALLYDOWN MEADOWS, BANBRIDGE

os 9 ballydown meadowsRoadworks will operate from 08:00 on Tue 17th Nov 2026 to 18:00 on Mon 23rd Nov 2026.
Reason: installation of new gas service to 9 ballydown meadows as per chapter 8

10/11/2026 09:01:00 : ROADWORKS

U2132, KNOCKBOY ROAD, BROUGHSHANE - Road closure, U2132, KNOCKBOY ROAD, BROUGHSHANE

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole Testing
Diversion in place.

Alternative Route Via:
Diversion 1: U2131 BALLYCLOGHAN ROAD, U2130 KNOWEHEAD ROAD

10/11/2026 09:01:00 : ROADWORKS

B0094, RATHKEEL ROAD, BROUGHSHANE - Lane closure, B0094, RATHKEEL ROAD, BROUGHSHANE

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole Testing

10/11/2026 09:01:00 : ROADWORKS

U2135, QUARRYTOWN ROAD, BALLYMENA - Lane closure, U2135, QUARRYTOWN ROAD, BALLYMENA

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole Testing

10/11/2026 09:01:00 : ROADWORKS

B0094, KNOCKAN ROAD, BROUGHSHANE - Lane closure, B0094, KNOCKAN ROAD, BROUGHSHANE

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole Testing

10/11/2026 09:01:00 : ROADWORKS

A0025, CHURCH STREET, DOWNPATRICK - Lane closure, A0025, CHURCH STREET, DOWNPATRICK

Roadworks will operate from 09:30 on Sun 7th Feb 2027 to 16:30 on Sun 14th Feb 2027.
Reason: NEW GAS CONNECTION

10/11/2026 09:01:00 : ROADWORKS

C0063, BALLYGARVEY ROAD, BROUGHSHANE - Lane closure, C0063, BALLYGARVEY ROAD, BROUGHSHANE

Work AreaRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Pole Testing

10/11/2026 09:01:00 : ROADWORKS

U0212, VESTRY ROAD, BALLYGOWAN - Road closure, U0212, VESTRY ROAD, BALLYGOWAN

Location of worksRoadworks will operate from Wed 11th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
08:00 11-11-2026 - 18:00 20-11-2026Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: U0211 MANSE ROAD, C0271 STATION ROAD, B0006 STATION ROAD, U0372 CARSONSTOWN ROAD, U1214 LIBERTY ROAD

10/11/2026 09:01:00 : ROADWORKS

B0039, SEVEN MILE STRAIGHT, LOANENDS - Lane closure, B0039, SEVEN MILE STRAIGHT, LOANENDS

Works LocationRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Fibre install to customers house, 182 Seven Mile Straight

10/11/2026 09:01:00 : ROADWORKS

B0062, FINVOY ROAD, BALLYMONEY - Lane closure, B0062, FINVOY ROAD, BALLYMONEY

Roadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Fri 18th Dec 2026.
Reason: The closure is to assist with the installation of new NIE underground mains cables.

10/11/2026 09:01:00 : ROADWORKS

U6293, UPPER DAMOLLY ROAD, NEWRY - Road closure, U6293, UPPER DAMOLLY ROAD, NEWRY

Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: Tree Cutting Works
Diversion in place.

Alternative Route Via:
Diversion 1: U6293 UPPER DAMOLLY ROAD, A0025 RATHFRILAND ROAD, U6112 DAMOLLY ROAD

10/11/2026 09:01:00 : ROADWORKS

U1002, BOGHEAD BRIDGE ROAD, AGHALEE - Road closure, U1002, BOGHEAD BRIDGE ROAD, AGHALEE

Roadworks will operate from Mon 26th Oct 2026 to Mon 23rd Nov 2026.
Continuously from first day / last day on following times:-
Start at 8am - Road closure in place 24hrs per dayReason: Urgent Bridge Repair required
Diversion in place.

Alternative Route Via:
Diversion 1: U1005 DIAMOND LANE, C0010 BRANKINSTOWN ROAD, U1024 FEATHERBED ROAD, U1002 BOGHEAD BRIDGE ROADDiversion 2:

10/11/2026 09:01:00 : ROADWORKS BELFAST

A0055, BALLYSILLAN ROAD, BELFAST - Lane closure, A0055, BALLYSILLAN ROAD, BELFAST

Location of worksRoadworks will operate as follows:-
1900 to 2200Reason: Replace Manhole Cover and Frame

10/11/2026 09:01:00 : ROADWORKS

C0334, DERRYLECKAGH ROAD, NEWRY - Road closure, C0334, DERRYLECKAGH ROAD, NEWRY

Works AreaRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Urgent Fibre replacement for customers.
Diversion in place.

Alternative Route Via:
Diversion 1: C0334 DERRYLECKAGH ROAD, B0008 HILLTOWN ROAD, B0008 NEWRY ROAD, B0007 CHAPEL HILL, B0007 BRIDGE ROAD, C0334 AUGHNAGON ROAD

10/11/2026 09:01:00 : ROADWORKS

B0507, ABERCORN ROAD, LONDONDERRY - Lane closure, B0507, ABERCORN ROAD, LONDONDERRY

Roadworks will operate from Mon 9th Nov 2026 to Mon 30th Nov 2026.
Continuously from first day / last day on following times:-
6am - 6pm for the day of worksReason: concrete pump and concrete pour

10/11/2026 09:01:00 : ROADWORKS

B0002, HILLSBOROUGH ROAD, DROMORE CO DOWN - Lane closure, B0002, HILLSBOROUGH ROAD, DROMORE CO DOWN

Location of worksRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Replace Manhole Cover and Frame

10/11/2026 09:01:00 : ROADWORKS

C0094, CARNCULLAGH ROAD, DERVOCK - Lane closure, C0094, CARNCULLAGH ROAD, DERVOCK

C0094, CARNCULLAGH ROAD, DERVOCKRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network

10/11/2026 09:01:00 : ROADWORKS

B0113, DRUMINTEE ROAD, MEIGH - Road closure, B0113, DRUMINTEE ROAD, MEIGH

Roadworks will operate as follows:-
08:00 - 17:30Reason: Surfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: B0113 DRUMINTEE ROAD, B0113 NEWRY ROAD, B0134 LONGFIELD ROAD, B0030 CROSSMAGLEN ROAD, B0030 HALL ROAD, B0030 STURGAN BRAE, B0030 NEWTOWN ROAD, A0025 NEWTOWN ROAD, A0025 MAIN STREET, A0025 NEWRY ROAD, A0025 CAMLOUGH ROAD, B0079 PATRICK STREET, A0025 MONAGHAN STREET, B0079 DOMINIC STREET, A0001 BRIDGE STREET, A0001 DUBLIN ROAD, A0001 NEWRY BY-PASS, B0113 FORKHILL ROAD

10/11/2026 09:01:00 : ROADWORKS

B0017, STRAID ROAD, BUSHMILLS - Lane closure, B0017, STRAID ROAD, BUSHMILLS

B0017, STRAID ROAD, BUSHMILLSRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Civils to Clear Blockages on the Fibrus Network

10/11/2026 09:01:00 : ROADWORKS

B0113, DRUMINTEE ROAD, MEIGH - Lane closure, B0113, DRUMINTEE ROAD, MEIGH

Roadworks will operate as follows:-
08:00 - 17:30Reason: Surfacing Prep Works - Civils crewTTM - Temporary Traffic signals

10/11/2026 09:01:00 : ROADWORKS

U2248, GORTNAHEY ROAD, GORTNAHEY - Lane closure, U2248, GORTNAHEY ROAD, GORTNAHEY

U2248, GORTNAHEY ROAD, GORTNAHEYRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Blowing Underground Fibre on the Fibrus Network

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0641, CAMBRAI STREET, BELFAST - One Way closure, U0641, CAMBRAI STREET, BELFAST

Location of worksRoadworks will operate as follows:-
07:00 - 12:00Reason: NIW - Repair or Replace Cover + Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0641 CAMBRAI STREET, B0039 WOODVALE ROAD, A0052 CRUMLIN ROAD

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0641, ENFIELD STREET, BELFAST - Road closure, U0641, ENFIELD STREET, BELFAST

Location of worksRoadworks will operate as follows:-
19:00 - 22:00Reason: NIW - Repair or Replace Cover + Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0641 ENFIELD STREET, B0039 WOODVALE ROAD, U0641 CAMBRAI STREET

10/11/2026 09:01:00 : ROADWORKS BELFAST

C0263, BELFAST ROAD, NEWTOWNARDS - Lane closure, C0263, BELFAST ROAD, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Tree Felling

10/11/2026 09:01:00 : ROADWORKS

B0090, MARSHALLSTOWN ROAD, CARRICKFERGUS - Lane closure, B0090, MARSHALLSTOWN ROAD, CARRICKFERGUS

Location of worksRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW - Install New PRV meter and Strainer

10/11/2026 09:01:00 : ROADWORKS

A0025, RATHFRILAND ROAD, NEWRY - Lane closure, A0025, RATHFRILAND ROAD, NEWRY

Location of worksRoadworks will operate from Mon 16th Nov 2026 to Thu 19th Nov 2026.
Continuously from first day / last day on following times:-
09:30 16-11-2026 - 16:30 19-11-2026Reason: NIW - NEW SEWER CONNECTION

10/11/2026 09:01:00 : ROADWORKS

A0003, PORTADOWN ROAD, ARMAGH - Lane closure, A0003, PORTADOWN ROAD, ARMAGH

Works LocationRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Fibre install to customers house, 159 Portadown Road

10/11/2026 09:01:00 : ROADWORKS

U0031, KINGSMOSS ROAD, NEWTOWNABBEY - Road closure, U0031, KINGSMOSS ROAD, NEWTOWNABBEY

Road ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Fibre install to customers house, 64 Kingsmoss Road
Diversion in place.

Alternative Route Via:
Diversion 1: B0056 BALLYROBERT ROAD, B0059 MOSSLEY ROAD, U0035 HORSESHOE ROAD

10/11/2026 09:01:00 : ROADWORKS

U0400, GLENWELL GROVE, MALLUSK - Lane closure, U0400, GLENWELL GROVE, MALLUSK

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U9013, BEVERLEY CLOSE, NEWTOWNARDS - Lane closure, U9013, BEVERLEY CLOSE, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Thu 26th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U0421, GLENBROOME PARK, NEWTOWNABBEY - Lane closure, U0421, GLENBROOME PARK, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U8024, BINGHAM STREET, BANGOR - Lane closure, U8024, BINGHAM STREET, BANGOR

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U1556, LONDONDERRY - Road closure, U1556, OLD CITY COURT, LONDONDERRY

Roadworks will operate from Mon 9th Nov 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Continuously from 08:00 on 09.11.26 to 16:00 on 18.12.26
Consultation required with local residentsReason: NI Water Sewer installation
Diversion in place.

Alternative Route Via:
Diversion 1: A0040 LETTERKENNY ROAD

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0504, WHINCROFT ROAD, BELFAST - Lane closure, U0504, WHINCROFT ROAD, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0834, KENSINGTON GARDENS, BELFAST - Lane closure, U0834, KENSINGTON GARDENS, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U0126, OLD SHORE ROAD, NEWTOWNARDS - Lane closure, U0126, OLD SHORE ROAD, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

C0081, GLENAAN ROAD, CUSHENDALL - Road closure, C0081, GLENAAN ROAD, CUSHENDALL

Roadworks will operate from Mon 26th Oct 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
From 08:00 on the 26th of October to 17:00 on the 18th of DecemberReason: Emergency works to verge slip
Diversion in place.

Alternative Route Via:
Diversion 1: C0081 GLENAAN ROAD, A5002 TROMRA ROAD, A5002 CHAPEL ROAD, A5002 MILL STREET, A5002 BRIDGE STREET, B0014 BALLYEMON ROAD, A0043 GLENRAVEL ROAD, A0043 CUSHENDALL ROAD, B0094 DRUMAGROVE ROAD, B0094 MAIN STREET, B0064 GLENLESLIE ROAD, C0084 MONEYDUFF ROAD, C0084 CORKEY ROAD, C0084 COOLKEERAN ROAD, C0081 ALTARICHARD ROAD, C0106 GLENDUN ROAD

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0633, MOYARD PARADE, BELFAST - Lane closure, U0633, MOYARD PARADE, BELFAST

Lane ClosureRoadworks will operate as follows:-
09:30-15:00Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U4092, WHINFIELD, LARNE - Lane closure, U4092, WHINFIELD, LARNE

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0810, CHIPPENDALE COURT, BELFAST - Lane closure, U0810, CHIPPENDALE COURT, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U7023, GREGG STREET, LISBURN - Lane closure, U7023, GREGG STREET, LISBURN

Lane ClosureRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U0407, LONGLANDS ROAD, NEWTOWNABBEY - Lane closure, U0407, LONGLANDS ROAD, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

A0036, SHANES HILL ROAD, LARNE - Lane closure, A0036, SHANES HILL ROAD, LARNE

Works LocationRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Fibre install to customers house, 2 Starbog Road

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0601, BEN MADIGAN PARK SOUTH, BELFAST - Lane closure, U0601, BEN MADIGAN PARK SOUTH, BELFAST

Lane ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

U0400, VADDEGAN ROAD, MALLUSK - Lane closure, U0400, VADDEGAN ROAD, MALLUSK

Lane ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

B0205, PURDYSBURN HILL, LISBURN - Lane closure, B0205, PURDYSBURN HILL, LISBURN

Wotrks LocationRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Fibre install to customers house, 1 Purdysburn Hill

10/11/2026 09:01:00 : ROADWORKS

U9023, OLD FORGE LANE, NEWTOWNARDS - Lane closure, U9023, OLD FORGE LANE, NEWTOWNARDS

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

A3002, MUSSENDEN ROAD, CASTLEROCK - Lane closure, A3002, MUSSENDEN ROAD, CASTLEROCK

Roadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW - Boreholes & slit trenchesTTM - Temporary Traffic signals

10/11/2026 09:01:00 : ROADWORKS

A2002, SEACOAST ROAD, DOWNHILL - Lane closure, A2002, SEACOAST ROAD, DOWNHILL

Roadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: NIW Works - boreholes & slit trenches TTM - Temporary traffic signals

10/11/2026 09:01:00 : ROADWORKS

U6300, NEW LINE, SAINTFIELD - Road closure, U6300, NEW LINE, SAINTFIELD

Roadworks will operate from 08:00 on Mon 7th Dec 2026 to 18:00 on Mon 7th Dec 2026.
Reason: new gas connection
Diversion in place.

Alternative Route Via:
Diversion 1: U6300 QUEENS PARK NORTH, U6300 QUEENS PARK, A0007 CROSSGAR ROADDiversion 2:

10/11/2026 09:01:00 : ROADWORKS

U0411, QUEENS PARK, NEWTOWNABBEY - Lane closure, U0411, QUEENS PARK, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Sat 21st Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

A0001, A1 NEWRY BY-PASS ON-SLIP ROAD (SOUTH BOUND), NEWRY - Hard Shoulder closure, A0001, A1 NEWRY BY-PASS ON-SLIP ROAD (SOUTH BOUND), NEWRY

Hardshoulder ClosureRoadworks will operate as follows:-
19:00-06:00Reason: To facilitate Translink works adjacent to railway line

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0614, KINNAIRD AVENUE, BELFAST - Lane closure, U0614, KINNAIRD AVENUE, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Telecoms Works

10/11/2026 09:01:00 : ROADWORKS

A0032, TUMMERY ROAD, DROMORE CO TYRONE - Lane closure, A0032, TUMMERY ROAD, DROMORE CO TYRONE

Tummery Road, DromoreRoadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: New parking bays

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0107, CARROWREAGH ROAD, BELFAST - Lane closure, U0107, CARROWREAGH ROAD, BELFAST

Lane ClosureRoadworks will operate from 08:00 on Thu 10th Dec 2026 to 18:00 on Fri 11th Dec 2026.
Reason: Mains Works

10/11/2026 09:01:00 : ROADWORKS

U0016, BALLYVESEY ROAD, MALLUSK - Road closure, U0016, BALLYVESEY ROAD, MALLUSK

Road closureRoadworks will operate from Mon 9th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
8am 9th November 2026 - 5pm 20th November 2026Reason: Carriageway surfacing
Diversion in place.

Alternative Route Via:
Diversion 1: U0016 BALLYVESEY ROAD, U0030 BALLYCRAIGY ROAD SOUTH, U0030 BALLYCRAIGY ROAD NORTH, U0031 SPRINGWELL ROAD, B0056 BALLYCLARE ROAD, A0008 BALLYCLARE ROAD, U0019 BALLYCRAIGY ROAD

10/11/2026 09:01:00 : ROADWORKS

U0019, BALLYCRAIGY ROAD, NEWTOWNABBEY - Road closure, U0019, BALLYCRAIGY ROAD, NEWTOWNABBEY

Road ClosureRoadworks will operate from Mon 9th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
8am 9th November 2026 - 5pm 20th November 2026Reason: Carriageway Surfacing
Diversion in place.

Alternative Route Via:
Diversion 1: U0019 BALLYCRAIGY ROAD, A0008 BALLYCLARE ROAD, B0056 BALLYCLARE ROAD, U0031 SPRINGWELL ROAD, U0030 BALLYCRAIGY ROAD NORTH, U0030 BALLYCRAIGY ROAD SOUTH

10/11/2026 09:01:00 : ROADWORKS

C0263, HOLYWOOD ROAD, NEWTOWNARDS - Lane closure, C0263, HOLYWOOD ROAD, NEWTOWNARDS

Lane ClosureRoadworks will operate as follows:-
09:30-16:00Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

A0001, A1 HILLSBOROUGH BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), DROMORE CO DOWN - Road closure, A0001, A1 HILLSBOROUGH BY-PASS DUAL CARRIAGEWAY (NORTH BO, DROMORE CO DOWN

A1 North Hillsborough to A101Roadworks will operate from 23:00 on Mon 16th Nov 2026 to 06:00 on Sat 21st Nov 2026.
Reason: Tree Cutting
Diversion in place.

Alternative Route Via:
Diversion 1: A0001 A1 HILLSBOROUGH ROUNDABOUT, B0177 LISBURN ROAD, C0006 CULCAVY ROAD, C0006 HALFTOWN ROAD, U0400 BLARIS ROAD, A0001 HILLSBOROUGH ROAD, A0101 A1 SPRUCEFIELD ROUNDABOUT, A0101 A1 HILLSBOROUGH ROAD DUAL CARRIAGEWAY (SOUTH BOUND)

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0510, MILLTOWN HILL, BELFAST - Road closure, U0510, MILLTOWN HILL, BELFAST

Roadworks will operate from 08:00 on Tue 17th Nov 2026 to 18:00 on Thu 19th Nov 2026.
Reason: Surfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0055 MILLTOWN ROAD, B0023 BALLYLESSON ROAD, U0510 MILLTOWN HILL

10/11/2026 09:01:00 : ROADWORKS BELFAST

C0269, GILNAHIRK ROAD, BELFAST - Lane closure, C0269, GILNAHIRK ROAD, BELFAST

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Surfacing Works TTM - Temporary traffic signals required for road end

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0505, ELSMERE PARK, BELFAST - Road closure, U0505, ELSMERE PARK, BELFAST

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Surfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0269 GILNAHIRK ROAD

10/11/2026 09:01:00 : ROADWORKS

C0297, BALLYNAHINCH ROAD, LISBURN - Lane closure, C0297, BALLYNAHINCH ROAD, LISBURN

Lane ClosureRoadworks will operate from 09:30 on Fri 27th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

B0002, ANNACLOY ROAD, ANNACLOY - Lane closure, B0002, ANNACLOY ROAD, ANNACLOY

Lane ClosureRoadworks will operate from 09:30 on Thu 19th Nov 2026 to 16:30 on Thu 19th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:01:00 : ROADWORKS

B0034, DUNGANNON ROAD, BALLYGAWLEY - Lane closure, B0034, DUNGANNON ROAD, BALLYGAWLEY

Roadworks will operate from 08:00 on Mon 2nd Nov 2026 to 18:00 on Wed 23rd Dec 2026.
Reason: Civils work prior to carriageway resurfacing

10/11/2026 09:01:00 : ROADWORKS

A0029, RING ROAD, COLERAINE - Hard Shoulder closure, A0029, RING ROAD, COLERAINE

Roadworks will operate from Mon 26th Oct 2026 to Sat 28th Nov 2026.
Continuously from first day / last day on following times:-
8pm Monday 26th October to 6am Saturday 28th NovemberReason: Creation of New Footpath

10/11/2026 09:01:00 : ROADWORKS

U0906, SESSIADONAGHY ROAD, BALLYGAWLEY - Lane closure, U0906, SESSIADONAGHY ROAD, BALLYGAWLEY

Roadworks will operate from 08:00 on Wed 25th Nov 2026 to 18:00 on Fri 27th Nov 2026.
Reason: New Meter Chamber on the verge

10/11/2026 09:01:00 : ROADWORKS

C0635, AGHNAGAR ROAD, BALLYGAWLEY - Lane closure, C0635, AGHNAGAR ROAD, BALLYGAWLEY

Roadworks will operate from 08:00 on Mon 23rd Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: New Meter Chamber on the carriageway

10/11/2026 09:01:00 : ROADWORKS

U4110, LISBOY ROAD, KILRAGHTS - Lane closure, U4110, LISBOY ROAD, KILRAGHTS

Lane closureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIE overhead line work

10/11/2026 09:01:00 : ROADWORKS

A0005, MELMOUNT ROAD, STRABANE - Lane closure, A0005, MELMOUNT ROAD, STRABANE

Roadworks will operate as follows:-
19:00-06:00Reason: Installation of new gas mains

10/11/2026 09:01:00 : ROADWORKS

A0002, SHORE ROAD, ROSTREVOR - Lane closure, A0002, SHORE ROAD, ROSTREVOR

SHORE ROAD, ROSTREVORRoadworks will operate from Mon 14th Dec 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
installation of 0930 on first day
lights to be manually operated throughout worksReason: installation of NIE duct and cable

10/11/2026 09:01:00 : ROADWORKS

A0001, A1 HILLSBOROUGH BY-PASS DUAL CARRIAGEWAY (NORTH BOUND), LISBURN - Hard Shoulder closure, A0001, A1 HILLSBOROUGH BY-PASS DUAL CARRIAGEWAY (NORTH BO, LISBURN

A1 NB Taughblane Road to McKee's Dam Lay-by exit Roadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Fence Replacement of Fence along McKee's Dam lay-by, Hillsborough

10/11/2026 09:01:00 : ROADWORKS

C0287, COMMONS ROAD, BALLYKINLER - Road closure, C0287, COMMONS ROAD, BALLYKINLER

Location of worksRoadworks will operate from Tue 17th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
08:00 17-11-2026 - 18:00 20-11-2026Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: C0287 COMMONS ROAD, A0002 TYRELLA ROAD, A0002 BLACKSTAFF ROAD, C0287 FORD ROAD, U0302 BAY ROAD

10/11/2026 09:01:00 : ROADWORKS BELFAST

U0601, CARRS GLEN PARK, BELFAST - Road closure, U0601, CARRS GLEN PARK, BELFAST

Roadworks will operate from 09:00 on Wed 11th Nov 2026 to 17:00 on Fri 27th Nov 2026.
Reason: NIW Lead pipe replacements
Diversion in place.

Alternative Route Via:
Diversion 1: A0055 BALLYSILLAN ROAD, A0055 nullDiversion 2: U0200 BALLYSILLAN PARK, A0055 BALLYSILLAN ROAD

10/11/2026 09:00:00 : ROADWORKS

A0006, GLENSHANE ROAD, DUNGIVEN - Lane closure, A0006, GLENSHANE ROAD, DUNGIVEN

Lane closureRoadworks will operate from Mon 19th Oct 2026 to Sun 31st Jan 2027.
Continuously from first day / last day on following times:-
Lane closures in place full timeReason: Culvert Failure Repairs

10/11/2026 09:00:00 : ROADWORKS

U7165, BALLYNAHONEMORE ROAD, ARMAGH - Lane closure, U7165, BALLYNAHONEMORE ROAD, ARMAGH

Roadworks will operate from 09:30 on Mon 16th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: New sewer connection to the main sewer on the carriageway

10/11/2026 09:00:00 : ROADWORKS

C0313, HEAD ROAD, ATTICAL - Lane closure, C0313, HEAD ROAD, ATTICAL

Roadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Wed 25th Nov 2026.
Reason: NIW Works TTM - Temporary Traffic signals

10/11/2026 09:00:00 : ROADWORKS

C0313, HEAD ROAD, ATTICAL - Lane closure, C0313, HEAD ROAD, ATTICAL

Carrigenagh RoadRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: NIW Inspection Works

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0514, DRUMADOON DRIVE, BELFAST - Lane closure, U0514, DRUMADOON DRIVE, BELFAST

40m from jnc w/ Rank Road to jnc w/ Craigleith DrRoadworks will operate from 08:00 on Mon 30th Nov 2026 to 18:00 on Mon 30th Nov 2026.
Reason: Client visit to complete telecoms pole swap

10/11/2026 09:00:00 : ROADWORKS

C0005, BROKERSTOWN ROAD, LISBURN - Lane closure, C0005, BROKERSTOWN ROAD, LISBURN

Location of worksRoadworks will operate from Thu 12th Nov 2026 to Sat 21st Nov 2026.
Continuously from first day / last day on following times:-
09:30 12-11-2026 - 16:30 21-11-2026Reason: NIE works

10/11/2026 09:00:00 : ROADWORKS

A0003, LONGSTONE STREET, LISBURN - Lane closure, A0003, LONGSTONE STREET, LISBURN

Pole swap to upgrade existing streetworks siteRoadworks will operate as follows:-
1900 - 0600Reason: Pole swap to be done to upgrade existing streetworks site

10/11/2026 09:00:00 : ROADWORKS

U1416, PINES PARK, LURGAN - Lane closure, U1416, PINES PARK, LURGAN

os 30 pines parkRoadworks will operate from 08:00 on Thu 12th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: installation of new gas service at 30 pines park as per chapter 8

10/11/2026 09:00:00 : ROADWORKS

U1409, FILBIN CRESCENT, LURGAN - Lane closure, U1409, FILBIN CRESCENT, LURGAN

os 21 filbin crescentRoadworks will operate from 08:00 on Thu 12th Nov 2026 to 18:00 on Wed 18th Nov 2026.
Reason: installation of new gas service at 21 filbin crescent as per chapter 8

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0839, SHELBOURNE ROAD, BELFAST - Road closure, U0839, SHELBOURNE ROAD, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais13:00 Kick off
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 CREGAGH ROAD, U0839 ARDENLEE AVENUE, U0839 SHELBOURNE ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0839, ARDENLEE PARADE, BELFAST - Road closure, U0839, ARDENLEE PARADE, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais13:00 Kick Off
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 CREGAGH ROAD, U0839 ARDENLEE AVENUE, U0839 SHELBOURNE ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0839, HADDINGTON GARDENS, BELFAST - Road closure, U0839, HADDINGTON GARDENS, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais13:00 Kick Off
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 CREGAGH ROAD, U0839 ARDENLEE AVENUE, U0839 SHELBOURNE ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0839, ONSLOW GARDENS, BELFAST - Road closure, U0839, ONSLOW GARDENS, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais 13:00 Kick off
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 CREGAGH ROAD, U0839 ARDENLEE AVENUE, U0839 SHELBOURNE ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0817, ONSLOW PARADE, BELFAST - Road closure, U0817, ONSLOW PARADE, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais13:00 Kick Off
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 CREGAGH ROAD, U0839 ARDENLEE AVENUE, U0839 SHELBOURNE ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0501, HUGHES COURT, BELFAST - Road closure, U0501, HUGHES COURT, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais13:00 Kick Off
Diversion in place.

Alternative Route Via:
Diversion 1: C0701 MOUNT MERRION AVENUE

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0501, MOUNT MERRION AVENUE, BELFAST - Road closure, U0501, MOUNT MERRION AVENUE, BELFAST

Roadworks will operate from 08:00 on Sat 12th Dec 2026 to 18:00 on Sat 12th Dec 2026.
Reason: Ulster vs Aviron Bayonnais 13:00 Kick Off
Diversion in place.

Alternative Route Via:
Diversion 1: U0501 BURREN WAY, U0501 NORTH BANK

10/11/2026 09:00:00 : ROADWORKS BELFAST

C0701, MOUNT MERRION AVENUE, BELFAST - Road closure, C0701, MOUNT MERRION AVENUE, BELFAST

Roadworks will operate as follows:-
08:00-18:00Reason: Ulster vs Aviron Bayonnais13:00 Kick Off
Diversion in place.

Alternative Route Via:
Diversion 1: C0704 CREGAGH ROAD, A0055 UPPER KNOCKBREDA PARK, A0055 UPPER KNOCKBREDA ROAD, U0501 ROSETTA ROAD, C0701 KNOCKBREDA ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0604, SOMERTON ROAD, BELFAST - Road closure, U0604, SOMERTON ROAD, BELFAST

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Surfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: U0604 SOMERTON ROAD, U0205 FORTWILLIAM PARK, A0006 ANTRIM ROAD, U0604 LANSDOWNE ROAD

10/11/2026 09:00:00 : ROADWORKS

B0004, HOSPITAL ROAD, OMAGH - Lane closure, B0004, HOSPITAL ROAD, OMAGH

Area of worksRoadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Cable laying in footpath from 62 Hospital road to new sites after 64 Hospital road

10/11/2026 09:00:00 : ROADWORKS

A5002, RAMOAN ROAD, BALLYCASTLE - Lane closure, A5002, RAMOAN ROAD, BALLYCASTLE

Roadworks will operate from Mon 2nd Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Works planned to start 8am Monday 2nd November and completed by 4pm Friday. Traffic Lights will need to remain up continuously due to depth and length of excavation. Traffic Under Signal Control sign will be placed at Fogarty Crescent junction.Reason: Storm Sewer Connection

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0514, DRUMADOON DRIVE, BELFAST - Lane closure, U0514, DRUMADOON DRIVE, BELFAST

Roadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Telecoms Works

10/11/2026 09:00:00 : ROADWORKS

B0002, CHARLESTOWN ROAD, PORTADOWN - Lane closure, B0002, CARN ROAD, PORTADOWN

Lane ClosureRoadworks will operate from Sat 28th Nov 2026 to Mon 30th Nov 2026.
Continuously from first day / last day on following times:-
Saturday 8am - Monday 8amReason: Carriageway Resurfacing

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0834, KINGS PARK, BELFAST - Lane closure, U0834, KINGS CRESCENT, BELFAST

Lane ClosureRoadworks will operate from Thu 5th Nov 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Excavation pits to remain in place overnight and out of hours. Pits to be secured with fixed barriers and traffic management signage.Reason: NIW - Lead Pipe Replacement Works

10/11/2026 09:00:00 : ROADWORKS

U6126, NEW LINE, HILLTOWN - Road closure, U6126, NEW LINE, HILLTOWN

NEW LINE, HILLTOWNRoadworks will operate from 08:00 on Tue 24th Nov 2026 to 18:00 on Tue 24th Nov 2026.
Reason: installation of BT cable and complete BT cable jointing
Diversion in place.

Alternative Route Via:
Diversion 1: U6127 LEITRIM ROAD, C0321 SANDBANK ROAD

10/11/2026 09:00:00 : ROADWORKS

U4092, WYNCAIRN ROAD, LARNE - Lane closure, U4092, WYNCAIRN DRIVE, LARNE

Lane ClosureRoadworks will operate from Thu 5th Nov 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Thu 05 Nov 2026 Date End Fri 18 Dec 2026 : Daily 8.00-18.00.
Do restrictions permit access to emergency vehicles? : Yes
Period Restriction will apply :Continuous
Additional details : Watermain replacement works to take place throughout Wyncairn area, streets include Wyncairn Ave, Wyncairn Rd, Wyncairn Gardens, Wyncairn Park.
Additional TTR Information : Excavation pits to remain in place overnight during watermain replacement works. Pits to be secured with fixed barriers and traffic management signage. Please ensure no backup of Traffic onto Upper Cairncastle Road. Advance Notice and Boards Information Boards to be put in place.Reason: NIW Watermain Replacement Works

10/11/2026 09:00:00 : ROADWORKS

A0050, NEWCASTLE ROAD, MAGHERA - Lane closure, A0050, CASTLEWELLAN ROAD, MAGHERA

Castlewellan Newcastle Shared Path PH2Roadworks will operate from 09:30 on Wed 4th Nov 2026 to 16:30 on Wed 23rd Dec 2026.
Reason: Drainage Investigation, Construction of new shared cycle & pedestrian path and Road kerbing and road resurfacing.

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0006, ANTRIM ROAD, BELFAST - Lane closure, A0006, ANTRIM ROAD, BELFAST

Roadworks will operate from Tue 3rd Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
8pm to 6amReason: High Friction surfacing

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0006, ANTRIM ROAD, BELFAST - Lane closure, A0006, ANTRIM ROAD, BELFAST

3 WAY TRAFFIC LIGHTRoadworks will operate from Tue 3rd Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
8PM - 6AMReason: High Friction surfacing

10/11/2026 09:00:00 : ROADWORKS

U0153, BALLYWILLWILL ROAD, DRUMAROAD - Road closure, U0153, BALLYWILLWILL ROAD, DRUMAROAD

Road ClosureRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Tue 24th Nov 2026.
Reason: Tree Felling
Diversion in place.

Alternative Route Via:
Diversion 1: U0154 BALLYWILLWILL ROAD, U0131 CAULEYS PIPE ROAD, C0376 DRUMNAQUOILE ROAD, U0153 BALLYWILLWILL ROAD

10/11/2026 09:00:00 : ROADWORKS

U1556, NEWMARKET STREET, LONDONDERRY - Lane closure, U1556, NEWMARKET STREET, LONDONDERRY

Roadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: To repair damaged wall

10/11/2026 09:00:00 : ROADWORKS

A0003, MOIRA ROAD, LISBURN - Road closure, A0003, MOIRA ROAD, LISBURN

Closure MapRoadworks will operate as follows:-
7am - 7pmReason: Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0003 MOIRA ROAD, A0003 LISBURN ROAD, A0026 GLENAVY ROAD, A0026 MOIRA ROAD, A0030 LISBURN ROAD, A0030 GLENAVY ROAD, A0030 BALLYMACASH ROAD, A0519 PRINCE WILLIAM ROAD, A0520 KNOCKMORE ROAD

10/11/2026 09:00:00 : ROADWORKS

A0003, MOIRA ROAD, LISBURN - Road closure, A0003, MOIRA ROAD, LISBURN

Closure MapRoadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Carriageway Resurfacing Works
Diversion in place.

Alternative Route Via:
Diversion 1: A0003 MOIRA ROAD, A0003 LISBURN ROAD, A0026 GLENAVY ROAD, A0026 MOIRA ROAD, A0030 LISBURN ROAD, A0030 GLENAVY ROAD, A0030 BALLYMACASH ROAD, A0519 PRINCE WILLIAM ROAD, A0520 KNOCKMORE ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0848, AGINCOURT AVENUE, BELFAST - Lane closure, U0848, AGINCOURT AVENUE, BELFAST

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Drainage SurveyTTM - Temporary Traffic Signals

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0848, COLLINGWOOD AVENUE, BELFAST - Road closure, U0848, COLLINGWOOD AVENUE, BELFAST

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Drainage Survey
Diversion in place.

Alternative Route Via:
Diversion 1: U0848 COLLINGWOOD AVENUE, U0848 DAMASCUS STREET, U0848 AGINCOURT AVENUE

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0848, PENROSE STREET, BELFAST - Road closure, U0848, PENROSE STREET, BELFAST

Roadworks will operate from 08:00 on Mon 16th Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Drainage Survey
Diversion in place.

Alternative Route Via:
Diversion 1: U0848 RUGBY AVENUE, U0848 CAIRO STREET, U0848 AGINCOURT AVENUE

10/11/2026 09:00:00 : ROADWORKS

B0094, HILLHEAD ROAD, BALLYCLARE - Lane closure with Diversionary Measures, B0094, HILLHEAD ROAD, BALLYCLARE

One way Lane closureRoadworks will operate from 09:30 on Mon 2nd Nov 2026 to 16:30 on Wed 23rd Dec 2026.
Reason: Resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: U0059 MILL ROAD, A0057 TEMPLEPATRICK ROAD, A0057 TEMPLEPATRICK ROAD OFF-SLIP

10/11/2026 09:00:00 : ROADWORKS

U0240, GREENGRAVES ROAD, DUNDONALD - Road closure, U0240, GREENGRAVES ROAD, DUNDONALD

Location of worksRoadworks will operate from Mon 2nd Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
08:00 02-11-2026 - 18:00 27-11-2026Reason: NIW - Minor Works Installation
Diversion in place.

Alternative Route Via:
Diversion 1: U0140 MILLMOUNT ROAD, U0140 null, A0022 COMBER ROAD, C0262 GRAHAMS BRIDGE ROAD, C0262 CHURCH ROAD, C0262 ROBBS ROAD, A0020 UPPER NEWTOWNARDS ROAD, A0020 KEMPE STONES ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0002, BELFAST ROAD, CARRICKFERGUS - Lane closure, A0002, BELFAST ROAD, CARRICKFERGUS

Belfast Road, CarrickfergusRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Thu 26th Nov 2026.
Reason: Tree cutting works

10/11/2026 09:00:00 : ROADWORKS

U1412, NEW LINE, WARINGSTOWN - Road closure, U1412, NEW LINE, WARINGSTOWN

New Line, Waringstown Roadworks will operate from 09:30 on Tue 8th Dec 2026 to 16:30 on Tue 8th Dec 2026.
Reason: installation of NIE duct and cable
Diversion in place.

Alternative Route Via:
Diversion 1: A0026 BANBRIDGE ROAD, C0358 HALL ROAD, U1225 MILLTOWN ROAD

10/11/2026 09:00:00 : ROADWORKS

C0004, BELSIZE ROAD, LISBURN - Lane closure, C0004, BELSIZE ROAD, LISBURN

Lane ClosureRoadworks will operate from 09:30 on Mon 19th Oct 2026 to 16:30 on Wed 23rd Dec 2026.
Reason: Footway Resurfacing Works

10/11/2026 09:00:00 : ROADWORKS BELFAST

C0262, ROBBS ROAD, BELFAST - Lane closure, C0262, ROBBS ROAD, BELFAST

Roadworks will operate from 08:00 on Sun 6th Dec 2026 to 18:00 on Sun 6th Dec 2026.
Reason: Telecoms Works

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0614, KINNAIRD AVENUE, BELFAST - Lane closure, U0614, KINNAIRD AVENUE, BELFAST

Roadworks will operate from 08:00 on Sat 5th Dec 2026 to 18:00 on Sat 5th Dec 2026.
Reason: Telecoms Works

10/11/2026 09:00:00 : ROADWORKS

C0309, SKEAGH ROAD, KINALLEN - Road closure, C0309, SKEAGH ROAD, KINALLEN

Skeagh Bridge location Roadworks will operate from Thu 8th Oct 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Structure partially collapsed Reason: Emergency Bridge repairs to partially collapsed masonry structure
Diversion in place.

Alternative Route Via:
Diversion 1: C0309 SKEAGH ROAD, C0310 DIAMOND ROAD, C0328 BANBRIDGE ROAD

10/11/2026 09:00:00 : ROADWORKS

U0409, COCKHILL ROAD, LISBURN - Road closure, U0409, COCKHILL ROAD, LISBURN

the New BridgeRoadworks will operate from Thu 8th Oct 2026 to Fri 18th Dec 2026.
Continuously from first day / last day on following times:-
Suspended scaffold on carriageway for duration of the worksReason: Structural Repairs to masonry bridge
Diversion in place.

Alternative Route Via:
Diversion 1: U0409 COCKHILL ROAD, U0411 KESH ROAD, U0071 GRAVELHILL ROAD, U0059 LURGANURE ROAD, U0059 HALFPENNY GATE ROAD, U0060 ROBBERY ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0501, CASTLE PLACE, BELFAST - Lane closure, A0501, CASTLE PLACE, BELFAST

Roadworks will operate as follows:-
0800-1200Reason: NEW GAS CONNECTION

10/11/2026 09:00:00 : ROADWORKS

A1002, CLOONEY ROAD, LONDONDERRY - Lane closure, A1002, MADAM'S BANK ROAD, LONDONDERRY

Caw Roundabout, LondonderryRoadworks will operate from 09:30 on Fri 20th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: renewal of Eircom frame and cover

10/11/2026 09:00:00 : ROADWORKS

C0321, SANDBANK ROAD, HILLTOWN - Road closure, C0321, SANDBANK ROAD, HILLTOWN

Sandbank rd closureRoadworks will operate from Mon 9th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Access maintained for HGV traffic to Joseph Walls LtdReason: Removal of PRV and repair to existing Man hole Lids
Diversion in place.

Alternative Route Via:
Diversion 1: C0321 SANDBANK ROAD, B0027 KILKEEL ROAD, B0008 CASTLEWELLAN ROAD, B0008 MAIN STREET, B0025 ROSTREVOR ROAD, U6127 LEITRIM ROAD, U6126 NEW LINE

10/11/2026 09:00:00 : ROADWORKS

U0132, STOCKBRIDGE ROAD, DONAGHADEE - Road closure, U0132, STOCKBRIDGE ROAD, DONAGHADEE

Roadworks will operate from Mon 2nd Nov 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Continuously from 08:00 on 02.11.26 to 16:00 on 27.11.26

Also ensure garden centre notifiedReason: NI Water sewer installation
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 WARREN ROAD, B0021 NEW ROAD, A0048 NEWTOWNARDS ROAD, B0021 HIGH BANGOR ROAD

10/11/2026 09:00:00 : ROADWORKS

U7116, COLINDALE PARK, DUNMURRY - Road closure, U7116, COLINDALE PARK, DUNMURRY

Road ClosureRoadworks will operate from 08:00 on Mon 26th Oct 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: C0003 UPPER DUNMURRY LANE

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0628, TOWNSEND STREET, BELFAST - Road closure, U0628, TOWNSEND STREET, BELFAST

Road ClosureRoadworks will operate from 08:00 on Mon 2nd Nov 2026 to 18:00 on Fri 20th Nov 2026.
Reason: Resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: A0501 DIVIS STREET, B0126 MILLFIELD, B0039 PETERS HILLDiversion 2: B0039 PETERS HILL, B0126 MILLFIELD, A0501 DIVIS STREET, A0501 null

10/11/2026 09:00:00 : ROADWORKS

U7025, LARGYMORE DRIVE, LISBURN - Road closure, U7025, LARGYMORE DRIVE, LISBURN

One Way ClosureRoadworks will operate as follows:-
07:00-12:00Reason: Defective apparatus
Diversion in place.

Alternative Route Via:
Diversion 1: U7025 LARGYMORE DRIVE, A0049 SAINTFIELD ROAD, B0023 MERCER STREET, B0023 HILLHALL ROAD

10/11/2026 09:00:00 : ROADWORKS

U4550, OZONE AVENUE, BALLYMONEY - One Way closure, U4550, OZONE AVENUE, BALLYMONEY

Ozone AvenueRoadworks will operate from Tue 3rd Nov 2026 to Thu 3rd Dec 2026.
Continuously from first day / last day on following times:-
Continuous closure due to nature of opencut excavation works Reason: Ni Water new storm sewer laying
Diversion in place.

Alternative Route Via:
Diversion 1: U4550 HENRY STREET, B0062 QUEEN STREET, B0147 NEWAL ROAD, B0062 MEETING HOUSE STREET, U4550 UNION STREETDiversion 2: U4550 HENRY STREET, B0062 QUEEN STREET, U4550 UNION STREET

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0002, CORPORATION STREET, BELFAST - Lane closure, A0002, CORPORATION SQUARE, BELFAST

Lane ClosureRoadworks will operate from 23:00 on Thu 19th Nov 2026 to 06:00 on Fri 20th Nov 2026.
Reason: Cleaning and Surveying of existing sewer

10/11/2026 09:00:00 : ROADWORKS

U0208, CARRIGS ROAD, NEWCASTLE - Lane closure, U0208, CARRIGS ROAD, NEWCASTLE

Lane ClosureRoadworks will operate as follows:-
09:00-16:00Reason: Defective apparatus

10/11/2026 09:00:00 : ROADWORKS

C0304, WATERESK ROAD, MAGHERA CO DOWN - Road closure, C0304, WATERESK ROAD, MAGHERA CO DOWN

Road ClosureRoadworks will operate as follows:-
09:00-16:00Reason: Defective apparatus
Diversion in place.

Alternative Route Via:
Diversion 1: C0304 WATERESK ROAD, U0038 KILMEGAN ROAD, B0180 OLD ROAD, B0180 BALLYLOUGHLIN ROAD

10/11/2026 09:00:00 : ROADWORKS

A0025, MILL HILL, CASTLEWELLAN - Lane closure, A0025, MILL HILL, CASTLEWELLAN

Lane ClosureRoadworks will operate as follows:-
09:30-16:00Reason: Defective apparatus

10/11/2026 09:00:00 : ROADWORKS

C0365, GREENCASTLE ROAD, KILKEEL - Lane closure, C0365, GREENCASTLE ROAD, KILKEEL

Roadworks will operate from Mon 26th Oct 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
24 7 traffic lightsReason: New sewer pipe

10/11/2026 09:00:00 : ROADWORKS

B0177, BALLYNAHINCH ROAD, ANNAHILT - Road closure, B0177, BALLYNAHINCH ROAD, ANNAHILT

Work zoneRoadworks will operate as follows:-
22:00 to 06:00Reason: Tree cutting works
Diversion in place.

Alternative Route Via:
Diversion 1: B0178 COMBER ROAD, U0417 CARNREAGH, U0417 CARNREAGH ROAD, B0177 BALLYNAHINCH ROAD

10/11/2026 09:00:00 : ROADWORKS

A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (NORTH BOUND), NEWRY - 15 min Obstruction, A0001, A1 DUBLIN ROAD ON-SLIP ROAD (NORTH BOUND), NEWRY

A1 North Newry slipsRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), NEWRY - 15 min Obstruction, A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), NEWRY

A1 South Newry slipsRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0001, A1 BELFAST ROAD DUAL CARRIAGEWAY (NORTH BOUND), NEWRY - Lane closure, A0001, A1 DUBLIN ROAD DUAL CARRIAGEWAY (NORTH BOUND), NEWRY

A1 North Border - TiernyRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0001, A1 NEWRY BY-PASS OFF-SLIP ROAD (SOUTH BOUND), NEWRY - Lane closure, A0001, A1 BELFAST ROAD DUAL CARRIAGEWAY (SOUTH BOUND), NEWRY

A1 south Tierny - BroderRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

A0001, A1 BANBRIDGE ROAD OFF-SLIP ROAD (NORTH BOUND), DROMORE CO DOWN - Lane closure, A0001, A1 DUBLIN ROAD DUAL CARRIAGEWAY (NORTH BOUND), DROMORE CO DOWN

A1 North Tierny to MilebushRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

A0001, A1 BANBRIDGE ROAD DUAL CARRIAGEWAY (SOUTH BOUND), DROMORE CO DOWN - Lane closure, A0001, A1 HILLSBOROUGH ROAD DUAL CARRIAGEWAY (SOUTH BOUND, DROMORE CO DOWN

A1 South Milebush to TiernyRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

B0177, A1 HILLSBOROUGH BY-PASS ON-SLIP ROAD (NORTH BOUND), LISBURN - Lane closure, B0177, A1 HILLSBOROUGH ROAD DUAL CARRIAGEWAY (NORTH BOUND, LISBURN

A1 North sprucefield to milebushRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

A0001, A1 HILLSBOROUGH ROUNDABOUT , DROMORE CO DOWN - Lane closure, A0001, A1 HILLSBOROUGH ROAD DUAL CARRIAGEWAY (SOUTH BOUND, DROMORE CO DOWN

A1 Sprucefield to MilebushRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

A0101, A101 MAGHERAGEERY ROAD NORTH ROUNDABOUT , LISBURN - Lane closure, A0101, A101 MAGHERAGEERY ROAD DUAL CARRIAGEWAY (EAST BOUN, LISBURN

A101 EastRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

A0101, A101 MAGHERAGEERY ROAD NORTH ROUNDABOUT , LISBURN - Lane closure, A0101, A101 MAGHERAGEERY ROAD DUAL CARRIAGEWAY (WEST BOUN, LISBURN

A101 WestRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

B0034, CABRAGH SLIP ROAD SOUTH (WEST BOUND), CASTLECAULFIELD - 15 min Obstruction, B0034, CABRAGH SLIP ROAD SOUTH (WEST BOUND), CASTLECAULFIELD

A4 east slipsRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

B0045, EGLISH SLIP ROAD SOUTH (WEST BOUND), DUNGANNON - 15 min Obstruction, B0045, MULLYBRANNON ROAD SLIP ROAD (WESTBOUND), DUNGANNON

A4 west slipsRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

B0034, CABRAGH SLIP ROAD SOUTH (WEST BOUND), CASTLECAULFIELD - Lane closure, B0034, A4 DUAL CARRIAGEWAY (EAST BOUND), CASTLECAULFIELD

A4 EastRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

B0045, EGLISH SLIP ROAD SOUTH (WEST BOUND), DUNGANNON - Lane closure, B0045, A4 DUAL CARRIAGEWAY (WEST BOUND), DUNGANNON

A4 westRoadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

M0001, M1 MOTORWAY (EAST BOUND), TAMNAMORE - Lane closure, M0001, A4 DUNGANNON RBT OFF-SLIP ROAD (EAST BOUND), TAMNAMORE

M1 East 15 - 14Roadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

M0001, M1 COALISLAND RBT ON-SLIP ROAD (WEST BOUND), TAMNAMORE - Lane closure, M0001, M1 MOTORWAY (WEST BOUND), TAMNAMORE

M1 West jct 14 - 15Roadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

M0012, M12 ON-SLIP ROAD (EAST BOUND), CRAIGAVON - Lane closure, M0012, M1 MOTORWAY (EAST BOUND), CRAIGAVON

M1 Jct 14 to 9Roadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

M0001, M1 MOTORWAY (WEST BOUND), TAMNAMORE - Lane closure, M0001, M1 MOIRA RBT ON-SLIP ROAD (WEST BOUND), TAMNAMORE

M1 west 9 - 14Roadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 18th Jan 2027.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

M0001, M1 BLARIS OFF-SLIP ROAD (EAST BOUND), LISBURN - Lane closure, M0001, M1 MOTORWAY (EAST BOUND), LISBURN

M1 East 9-7Roadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

M0001, M1 BLARIS ON-SLIP ROAD (WEST BOUND), LISBURN - Lane closure, M0001, M1 MOTORWAY (WEST BOUND), LISBURN

M1 Westbound 7-9Roadworks will operate from 23:00 on Tue 27th Oct 2026 to 06:00 on Mon 23rd Nov 2026.
Reason: Routine Maintenance : Grass cutting, weed spraying, sweeping & gully cleaning

10/11/2026 09:00:00 : ROADWORKS

U8002, SILVERSTREAM AVENUE, BANGOR - Road closure, U8002, SILVERSTREAM AVENUE, BANGOR

Closure MapRoadworks will operate from 08:00 on Mon 19th Oct 2026 to 18:00 on Wed 30th Dec 2026.
Reason: Footway and Carriageway Resurfacing
Diversion in place.

Alternative Route Via:
Diversion 1: U8002 HAWTHORNE DRIVE, U8002 SILVERSTREAM DRIVE, U8002 SILVERSTREAM ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0024, ORMEAU ROAD, BELFAST - Lane closure, A0024, ORMEAU ROAD, BELFAST

Location of worksRoadworks will operate from 09:30 on Sun 10th Jan 2027 to 16:30 on Sun 10th Jan 2027.
Reason: NIE works

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0137, BALLYHANWOOD ROAD, BELFAST - Road closure, U0137, BALLYHANWOOD ROAD, BELFAST

Location of worksRoadworks will operate from Mon 9th Nov 2026 to Sun 29th Nov 2026.
Continuously from first day / last day on following times:-
08:00 09-11-2026 - 18:00 29-11-2026Reason: NIE works
Diversion in place.

Alternative Route Via:
Diversion 1: U0196 GILNAHIRK ROAD WEST, C0269 GILNAHIRK ROAD, C0265 KINGS ROAD, C0265 OLD DUNDONALD ROAD

10/11/2026 09:00:00 : ROADWORKS

C0218, CHANCELLORS ROAD, NEWRY - Lane closure, C0218, CHANCELLORS ROAD, NEWRY

C0218 Chancellor's RoadRoadworks will operate from 23:00 on Tue 24th Nov 2026 to 06:00 on Wed 25th Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection

10/11/2026 09:00:00 : ROADWORKS

U6280, DERRYBEG LANE, NEWRY - Lane closure, U6280, DERRYBEG LANE, NEWRY

U6280 Derrybeg LaneRoadworks will operate from 23:00 on Mon 23rd Nov 2026 to 06:00 on Tue 24th Nov 2026.
Reason: Bulk Lamp Change & Structural and Visual Inspection

10/11/2026 09:00:00 : ROADWORKS

B0003, BANBRIDGE ROAD, BANBRIDGE - 15 min Obstruction, B0003, BANBRIDGE ROAD, BANBRIDGE

A1 Loughbrickland North Junction Roadworks will operate from 23:00 on Wed 18th Nov 2026 to 06:00 on Thu 19th Nov 2026.
Reason: Bulk Lamp Change and Structural Visual Inspection
Diversion in place.

Alternative Route Via:
Diversion 1:

10/11/2026 09:00:00 : ROADWORKS

U6600, STRANGFORD - Road closure, U6600, STELLA MARIS STREET, STRANGFORD

Location of worksRoadworks will operate from Mon 9th Nov 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
08:00 09-11-2026 - 18:00 20-11-2026Reason: NIW - NEW SEWER CONNECTION
Diversion in place.

Alternative Route Via:
Diversion 1: A0002 THE SQUARE, A0002 THE SLIP, U6600 null

10/11/2026 09:00:00 : ROADWORKS BELFAST

A0020, UPPER NEWTOWNARDS ROAD, BELFAST - Lane closure, A0020, UPPER NEWTOWNARDS ROAD, BELFAST

Roadworks will operate from 09:30 on Sun 29th Nov 2026 to 16:30 on Sun 29th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:00:00 : ROADWORKS BELFAST

C0002, FINAGHY ROAD NORTH, BELFAST - Lane closure, C0002, FINAGHY ROAD NORTH, BELFAST

Roadworks will operate from 09:30 on Sun 29th Nov 2026 to 16:30 on Sun 29th Nov 2026.
Reason: NEW GAS CONNECTION

10/11/2026 09:00:00 : ROADWORKS

A0029, RING ROAD, COLERAINE - Road closure, A0029, RING ROAD, COLERAINE

Roadworks will operate as follows:-
8.00pm to 6.00am Nightly Reason: Footpath Construction Works on A29 Ring Road
Diversion in place.

Alternative Route Via:
Diversion 1: A0026 LODGE ROAD, A0026 NURSERY AVENUE, A0026 BERESFORD ROAD, A0026 TERRACE ROW, A0026 BERESFORD PLACE, A0026 BANNFIELD ROAD, A3002 COLERAINE BRIDGE, A0029 STRAND ROADDiversion 2:

10/11/2026 09:00:00 : ROADWORKS

B0521, GLENGALLIAGH ROAD, LONDONDERRY - Lane closure, B0521, GLENGALLIAGH ROAD, LONDONDERRY

Pole swap to be done for existing Streetwork siteRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Wed 25th Nov 2026.
Reason: Pole swap to be done to upgrade existing streetworks site

10/11/2026 09:00:00 : ROADWORKS

B0147, MAIN STREET, STRANOCUM - Lane closure, B0147, KIRK ROAD, STRANOCUM

Plant 22no 8m columns & Excavate FWRoadworks will operate as follows:-
0800 - 1700Reason: Plant 22no 8m columns & Excavate FW

10/11/2026 09:00:00 : ROADWORKS

U8005, MARYVILLE PARK, BANGOR - Road closure, U8005, MARYVILLE PARK, BANGOR

Road closure for Pole swap and cab installRoadworks will operate as follows:-
Weekends
0600 - 1200
Weekdays
0930 - 1630Reason: Excavation works - proposed new cab root and proposed new ducting & expose pole root, break out old cab roots and final reinstatement
Diversion in place.

Alternative Route Via:
Diversion 1: B0020 BRYANSBURN ROAD, U8005 MARYVILLE ROADDiversion 2: U8005 MARYVILLE ROAD, B0020 BRYANSBURN ROAD

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0638, BANKMORE STREET, BELFAST - Road closure, U0638, BANKMORE STREET, BELFAST

Roadworks will operate as follows:-
08:00 -16:30Reason: Telecoms Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0702 ORMEAU AVENUE, U0638 APSLEY STREET

10/11/2026 09:00:00 : ROADWORKS BELFAST

U0638, BANKMORE STREET, BELFAST - Road closure, U0638, BANKMORE STREET, BELFAST

Roadworks will operate as follows:-
08:00 - 16:30Reason: Telecoms Works
Diversion in place.

Alternative Route Via:
Diversion 1: C0702 ORMEAU AVENUE, U0638 APSLEY STREET

10/11/2026 09:00:00 : ROADWORKS

U0411, CARNMONEY ROAD, NEWTOWNABBEY - Road closure, U0411, CARNMONEY ROAD, NEWTOWNABBEY

Road ClosureRoadworks will operate as follows:-
Sunday 07:00 - 12:00Reason: Reset Manhole Cover And Frame
Diversion in place.

Alternative Route Via:
Diversion 1: U0411 CARNMONEY ROAD, U0411 FERNDALE ROAD, U0411 RICHMOND ROAD, U0411 BURNTHILL ROAD, A0008 BALLYCLARE ROAD, A0006 ANTRIM ROAD

10/11/2026 09:00:00 : ROADWORKS

U9434, WHITEPARK ROAD, BROOKEBOROUGH - Road closure, U9434, WHITEPARK ROAD, BROOKEBOROUGH

Roadworks will operate from Mon 26th Oct 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
Local Access AvailableReason: Installation of Replacement Watermain
Diversion in place.

Alternative Route Via:
Diversion 1: U9390 MONMURRY ROAD, C0419 TULLYREAGH ROAD, U9395 AGHNAGRANE ROAD, C0711 GREENHILL ROADDiversion 2:

10/11/2026 09:00:00 : ROADWORKS

B0090, OLD CARRICK ROAD, NEWTOWNABBEY - Lane closure, B0090, OLD CARRICK ROAD, NEWTOWNABBEY

Lane ClosureRoadworks will operate from 09:30 on Wed 18th Nov 2026 to 16:30 on Wed 18th Nov 2026.
Reason: Defective apparatus

10/11/2026 09:00:00 : ROADWORKS

U0272, WHITEROCK BAY, KILLINCHY - Road closure, U0272, WHITEROCK BAY, KILLINCHY

Whiterock RoadRoadworks will operate from Mon 19th Oct 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
Continuous due to open excavationsReason: Installation of NIW Pipelines & Chambers
Diversion in place.

Alternative Route Via:
Diversion 1: C0271 WHITEROCK ROAD, U0272 WHITEROCK BAY, U0272 BALLYDORN ROAD, C0271 BEECHVALE ROAD, C0271 SAINTFIELD ROAD, A0022 COMBER ROAD, U0257 ARDMILLAN ROAD, A0022 KILLINCHY ROAD, U0257 TULLYNAKILL ROAD, C0267 ARDMILLAN ROAD, U0271 KILLINAKIN ROAD

10/11/2026 09:00:00 : ROADWORKS

U9605, DRUMBULCAN ROAD, BALLINAMALLARD - Road closure, U9605, DRUMBULCAN ROAD, BALLINAMALLARD

road closureRoadworks will operate from 08:00 on Wed 21st Oct 2026 to 18:00 on Thu 26th Nov 2026.
Reason: Blockages , cable works ,
Diversion in place.

Alternative Route Via:
Diversion 1: C0412 BARAGH ROAD, B0046 MAIN STREET, C0413 MAKENNY ROAD

10/11/2026 09:00:00 : ROADWORKS

U9105, RAILWAY STREET, COMBER - Road closure, U9105, RAILWAY STREET, COMBER

Closure MapRoadworks will operate from 08:00 on Mon 19th Oct 2026 to 18:00 on Wed 23rd Dec 2026.
Reason: Carriageway and Footway resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: A0021 BALLYGOWAN ROAD, A0021 BRAE SIDE, A0021 HIGH STREET, U9107 CASTLE STREET, U9107 MILL STREET

10/11/2026 09:00:00 : ROADWORKS

B0073, BATTERY ROAD, MOORTOWN - Road closure, B0073, BATTERY ROAD, MOORTOWN

Roadworks will operate from 09:30 on Mon 9th Nov 2026 to 16:30 on Fri 4th Dec 2026.
Reason: Resurfacing Works for DFI
Diversion in place.

Alternative Route Via:
Diversion 1: B0073 BATTERY ROAD, B0161 DRUMENNY ROAD, B0161 MULLANAHOE ROAD, U0622 KILMASCALLY ROAD, U0622 ARDBOE ROAD, U0622 nullDiversion 2: U0616 MULLAN ROAD, U0617 KINTURK ROAD, U0617 ANNEETER ROAD

10/11/2026 09:00:00 : ROADWORKS

U4705, LISTYMORE PARK, ERGANAGH - Lane closure, U4705, LISTYMORE PARK, ERGANAGH

Area of worksRoadworks will operate from 09:30 on Wed 4th Nov 2026 to 16:30 on Fri 27th Nov 2026.
Reason: Erect Mini Pillar and lay LV and HV cable to new joints on existing main. Reinstate on completion

10/11/2026 09:00:00 : ROADWORKS

A0031, BROAD STREET, MAGHERAFELT - Road closure, A0031, BROAD STREET, MAGHERAFELT

closureRoadworks will operate from Sat 21st Nov 2026 to Sat 21st Nov 2026.
Continuously from first day / last day on following times:-
16:00 - 22:00Reason: Magherafelt Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: U5180 WESTLAND ROAD, B0040 RAINEY STREET, U5145 GARDEN STREET, U5144 UNION ROAD, B0040 CHURCH STREET, C0560 KING STREET, U5146 FAIR HILL ROAD

04/11/2026 09:43:00 : ROADWORKS

B0094, Hillhead Road, Ballyclare, - Lane Closure with Diversionary Measures, B0094, Hillhead Road, Ballyclare

Lane Closure with Diversionary Measures required for resurfacing works.
Closure to operate: Daily Diversion to operate, delays expected.
Alternative Route Via: U0059 MILL ROAD, A0057 TEMPLEPATRICK ROAD, A0057 TEMPLEPATRICK ROAD OFF-SLIP

30/10/2026 09:36:00 : ROADWORKS

A0046, LOUGH SHORE ROAD, DERRYGONN, Enniskillen, - Lane Closure, A0046, LOUGH SHORE ROAD, DERRYGONN, Enniskillen



Lane Closure required to facilitate work by Greentown Co
Reason for closure: Emergency Works, Road Subsiding
Closure to operate:Wed 28 Oct 2026 to: Fri 27 Nov 2026 Traffic control to operate, delays expected.The anticipated delay will be Less than 5- 10 minutes


08/10/2026 12:30:00 : ROADWORKS

C0365, Greencastle Road, Newry, - Lane Closure, C0365, Greencastle Road, Newry

Lane Closure required to facilitate NI Water Capital with works.
Closure to operate: Continuous lights from Monday 26 October 2026 to Friday 20 November 2026. Traffic control to operate, delays expected.


01/10/2026 08:00:00 : ROADWORKS

A0043, GLENRAVEL ROAD, BALLYMENA - Lane closure, A0043, GLENRAVEL ROAD, BALLYMENA

Roadworks will operate as follows:-
Works from 07:00 - 18:00
Traffic management will only be erected when required to complete the remaining works (Kerbing & drainage)Reason: Works for Mary Queen of peace, Martinstown

30/09/2026 13:00:00 : ROADWORKS

U1356, WOODHOUSE STREET, PORTADOWN - Lane closure, U1356, WOODHOUSE STREET, PORTADOWN

Pole swap to upgrade existing Streetworks siteRoadworks will operate from 09:30 on Mon 30th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Pole swap to upgrade existing Street works site

29/09/2026 14:03:00 : ROADWORKS

U1516, AILEACH ROAD, LONDONDERRY - Lane closure with Diversionary Measures, U1516, AILEACH ROAD, LONDONDERRY

Scheme Extents Roadworks will operate from 09:30 on Sun 27th Sep 2026 to 16:30 on Fri 25th Dec 2026.
Reason: Civils works on Aileach Rd
Diversion in place.

Alternative Route Via:
Diversion 1: U1516 AILEACH ROAD, U1516 HEWITT ROAD

29/09/2026 14:02:00 : ROADWORKS

B0520, THE SQUARE, COALISLAND - Road closure, B0520, MAIN STREET, COALISLAND

Road closureRoadworks will operate from Sun 29th Nov 2026 to Sun 29th Nov 2026.
Continuously from first day / last day on following times:-
Start 18:30
Finish 19:00Reason: Coalisland Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: B0520 STEWARTSTOWN ROAD, B0520 LINESIDE, B0520 THE SQUARE

29/09/2026 14:02:00 : ROADWORKS BELFAST

B0503, DURHAM STREET, BELFAST - One Way closure, B0503, DURHAM STREET, BELFAST

One way closureRoadworks will operate from Mon 28th Sep 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Closure will be installed between Monday and Friday 24/7. It will then be removed and the road opened for the weekendReason: Construction of a Cyclepath
Diversion in place.

Alternative Route Via:
Diversion 1: B0038 GROSVENOR ROAD, A0001 FISHERWICK PLACE, A0001 COLLEGE SQUARE EAST, B0126 COLLEGE SQUARE EASTDiversion 2: B0038 GROSVENOR ROAD, A0501 FALLS ROAD, A0501 DIVIS STREET, B0126 COLLEGE AVENUE, B0126 COLLEGE SQUARE EAST

29/09/2026 14:02:00 : ROADWORKS BELFAST

B0503, COLLEGE SQUARE NORTH, BELFAST - One Way closure, B0503, COLLEGE SQUARE NORTH, BELFAST

One way closureRoadworks will operate from Mon 28th Sep 2026 to Fri 20th Nov 2026.
Continuously from first day / last day on following times:-
Closure will be installed between Monday to Friday 24/7 before being lifted for the weekendReason: Construction of a new Cycle Path
Diversion in place.

Alternative Route Via:
Diversion 1: B0038 GROSVENOR ROAD, A0001 FISHERWICK PLACE, A0001 COLLEGE SQUARE EAST, B0126 COLLEGE SQUARE EAST

29/09/2026 14:02:00 : ROADWORKS

U7000, WILLAND CRESCENT, FIVEMILETOWN - Lane closure, U7000, WILLAND CRESCENT, FIVEMILETOWN

Area of worksRoadworks will operate from 09:30 on Tue 24th Nov 2026 to 16:30 on Thu 3rd Dec 2026.
Reason: Excavate joint bay in footpath and lay 7m of service cable to new meter cabinet

29/09/2026 14:02:00 : ROADWORKS

B0210, COOLKILL ROAD, TYNAN - Lane closure, B0210, COOLKILL ROAD, TYNAN

lane closureRoadworks will operate from 09:30 on Mon 7th Dec 2026 to 16:30 on Mon 7th Dec 2026.
Reason: NIE CIVILS AND CABLING WORKS

29/09/2026 14:02:00 : ROADWORKS

U4177, LOWER CASTLEVENNON ROAD, ANNACLONE - Road closure, U4177, LOWER CASTLEVENNON ROAD, ANNACLONE

road closureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: NIE CIVILS AND CABLING WORKS
Diversion in place.

Alternative Route Via:
Diversion 1: A0050 AUGHNACLOY ROAD, B0025 CASTLEVENNON ROAD

29/09/2026 14:02:00 : ROADWORKS BELFAST

C0265, KINGS ROAD, BELFAST - Lane closure, C0265, KINGS ROAD, BELFAST

Roadworks will operate as follows:-
Sunday job will be done off peakReason: NEW GAS CONNECTION

29/09/2026 14:02:00 : ROADWORKS

A1002, CLOONEY ROAD, LONDONDERRY - Road closure, A1002, CLOONEY ROAD, LONDONDERRY

Roadworks will operate as follows:-
19:00 - 06:00 Each NightReason: Caw Roundabout civils & resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: A1002 CULMORE ROAD, A1002 STRAND ROAD, A1002 QUEENS QUAY, A1002 FOYLE EMBANKMENT, A0040 FOYLE ROAD, A1002 FOYLE ROAD, A1002 CRAIGAVON BRIDGE LOWER, A1002 CRAIGAVON BRIDGE UPPER, U1500 SPENCER ROAD, A0005 VICTORIA ROAD, A1002 DUKE STREET, A1002 WATERSIDE LINK, A1002 KINGS STREET, A0006 GLENDERMOTT ROAD, A0006 DUNGIVEN ROAD, A0514 CRESCENT LINKDiversion 2: A1002 CLOONEY ROAD, B0118 COOLAFINNEY ROAD, B0118 COOLAFINNY ROAD, B0118 MAIN STREET, B0118 WOODVALE ROAD, B0118 TAMNAHERIN ROAD, A0006 GLENSHANE ROAD, A0006 LISMACARROL ROUNDABOUT

29/09/2026 14:02:00 : ROADWORKS BELFAST

C0265, OLD DUNDONALD ROAD, BELFAST - Lane closure, C0265, OLD DUNDONALD ROAD, BELFAST

Roadworks will operate from 09:30 on Tue 17th Nov 2026 to 16:30 on Fri 20th Nov 2026.
Reason: Telecoms Works

29/09/2026 14:02:00 : ROADWORKS

U4016, MULLAGHSANDALL ROAD, CARNALBANAGH - Lane closure, U4016, MULLAGHSANDALL ROAD, CARNALBANAGH

Lane ClosureRoadworks will operate from Sun 27th Sep 2026 to Fri 26th Mar 2027.
Continuously from first day / last day on following times:-
Sun 27 Sep 08:00 2026 Date End Fri 26 Mar 2027 17:00 : Continuous.
Do restrictions permit access to emergency vehicles? : Yes
Additional details : Access to be maintained for residents and emergency services.
Additional TTR Information : Continuous restrictions required due to pen cut excavation works. 4.5km of watermain to be replaced. Works zones to be minimised where possible to reduce extent of traffic management and sections of lane closure. Advance Notice Boards and Information Boards to be put in place. Translink to be notified.Reason: NIW - Watermain Improvements

29/09/2026 14:02:00 : ROADWORKS

C0304, WATERESK ROAD, MAGHERA CO DOWN - Lane closure, C0304, WATERESK ROAD, MAGHERA CO DOWN

Lane ClosureRoadworks will operate from 09:30 on Mon 23rd Nov 2026 to 16:30 on Mon 23rd Nov 2026.
Reason: Defective apparatus

29/09/2026 14:02:00 : ROADWORKS

A1002, CLOONEY ROAD, LONDONDERRY - Lane closure, A1002, CLOONEY ROAD, LONDONDERRY

Roadworks will operate from 09:30 on Thu 1st Oct 2026 to 16:30 on Tue 1st Dec 2026.
Reason: Caw Roundabout civils & resurfacing works

29/09/2026 14:01:00 : ROADWORKS

A0002, ABBEY STREET, BANGOR - Lane closure, A0002, ABBEY STREET, BANGOR

Lane ClosureRoadworks will operate as follows:-
08:00-12:00Reason: Defective apparatus

29/09/2026 14:01:00 : ROADWORKS

A0025, IRISH STREET, DOWNPATRICK - Lane closure, A0025, IRISH STREET, DOWNPATRICK

Roadworks will operate from Mon 7th Sep 2026 to Fri 1st Jan 2027.
Continuously from first day / last day on following times:-
Permit Extension Reason: Downpatrick Footpath Upgrade works

29/09/2026 14:01:00 : ROADWORKS

U9562, DERRYALLEN ROAD, BALLINAMALLARD - Road closure, U9562, COA ROAD, BALLINAMALLARD

Roadworks will operate from Mon 28th Sep 2026 to Fri 4th Dec 2026.
Continuously from first day / last day on following times:-
Continuous closure with local access provided for NI Water replacement works
Local access to be maintainedReason: NI Water laying replacement works
Diversion in place.

Alternative Route Via:
Diversion 1: U9600 KILLYMITTAN ROAD, B0046 TRILLICK ROAD, B0046 KILSKEERY ROAD, C0418 FINGERPOST ROAD

29/09/2026 14:01:00 : ROADWORKS

U1027, CREENAGH BRIDGE ROAD, COALISLAND - Road closure, U1027, CREENAGH BRIDGE ROAD, COALISLAND

Road closureRoadworks will operate from Mon 21st Sep 2026 to Fri 11th Dec 2026.
Continuously from first day / last day on following times:-
SCHOOL BUSES TO BE GRANTED ACCESS.
Permit is approved on the condition that the letter drop to residents is carried out asap.
Start 8am 21st Sept
Finish 5pm 11th DecReason: new main replacement
Diversion in place.

Alternative Route Via:
Diversion 1: B0106 BUSH ROAD, A0045 COALISLAND ROAD, U7675 BALLYNAKILLY ROAD, A0045 BALLYNAKILLY ROAD

29/09/2026 14:01:00 : ROADWORKS

C0625, OLD MOUNTFIELD ROAD, OMAGH - Lane closure, C0625, OLD MOUNTFIELD ROAD, OMAGH

Roadworks will operate from Mon 31st Aug 2026 to Fri 1st Jan 2027.
Continuously from first day / last day on following times:-
Discussion with Traffic Team required prior to any lane closures as there are other road works approved in the areaReason: DFI Gortin Road Scheme

29/09/2026 14:01:00 : ROADWORKS

U1528, STRATHROY ROAD, OMAGH - Lane closure, U1528, STRATHROY ROAD, OMAGH

Roadworks will operate from Mon 31st Aug 2026 to Fri 1st Jan 2027.
Continuously from first day / last day on following times:-
Discussion with Traffic Team required prior to any lane closures as there are other road works approved in the areaReason: DFI Gortin Road Scheme

29/09/2026 14:01:00 : ROADWORKS

B0048, GORTIN ROAD, OMAGH - Lane closure, B0048, MOUNTJOY ROAD, OMAGH

Roadworks will operate from Mon 31st Aug 2026 to Fri 1st Jan 2027.
Continuously from first day / last day on following times:-
Discussion with Traffic Team required prior to any lane closures as there are other road works approved in the areaReason: DFI Gortin Road Scheme

29/09/2026 14:01:00 : ROADWORKS

U0126, BOWTOWN ROAD, NEWTOWNARDS - Lane closure, U0126, BOWTOWN ROAD, NEWTOWNARDS

Roadworks will operate as follows:-
0700-1200Reason: new gas connection

29/09/2026 14:01:00 : ROADWORKS BELFAST

C0265, SANDOWN ROAD, BELFAST - Lane closure, C0265, SANDOWN ROAD, BELFAST

Roadworks will operate as follows:-
0700-1200Reason: new gas connection

29/09/2026 14:01:00 : ROADWORKS

U9278, CAMPLAGH ROAD, KESH - Road closure, U9278, CAMPLAGH ROAD, KESH

Roadworks will operate from 08:00 on Wed 30th Sep 2026 to 18:00 on Sat 30th Sep 2062.
Reason: BT poling works
Diversion in place.

Alternative Route Via:
Diversion 1: U9312 DRUMSKINNEY ROAD, C0451 MONTIAGHROE ROAD, C0403 DRUMNAGALLIAGH ROAD, U9278 CAMPLAGH ROAD

29/09/2026 14:01:00 : ROADWORKS

U9107, CASTLE STREET, COMBER - Road closure, U9107, CASTLE STREET, COMBER

Roadworks will operate as follows:-
0700-1200 as requestedReason: new gas connection
Diversion in place.

Alternative Route Via:
Diversion 1: U9107 CASTLE STREET, A0021 HIGH STREET, A0021 BRAE SIDE, A0021 BALLYGOWAN ROAD, U9105 RAILWAY STREET, U9107 MILL STREET

29/09/2026 14:01:00 : ROADWORKS

B0003, MAIN STREET, MARKETHILL - Road closure, B0003, MAIN STREET, MARKETHILL

Road ClosureRoadworks will operate as follows:-
1700hrs to 2230hrsReason: To facilitate Markethill Christmas Light switch on
Diversion in place.

Alternative Route Via:
Diversion 1: B0003 KEADY STREET, U8021 FAIRGREEN ROAD

29/09/2026 14:01:00 : ROADWORKS

U5235, DRUMILLY ROAD, BELLEEK - Road closure, U5235, DRUMILLY ROAD, BELLEEK

Roadworks will operate from 08:00 on Mon 7th Sep 2026 to 18:00 on Thu 7th Sep 2062.
Reason: BT poling works
Diversion in place.

Alternative Route Via:
Diversion 1: U5235 DRUMILLY ROAD, U5233 BARR ROAD, A0025 NEWRY ROAD, B0134 MOUNTAIN ROAD

29/09/2026 14:01:00 : ROADWORKS

A0523, RAILWAY STREET, BALLYMENA - Lane closure, A0523, RAILWAY STREET, BALLYMENA

Roadworks will operate as follows:-
20:00 - 06:00Reason: NI Water - CSO Duct & Kiosk Installation

29/09/2026 14:00:00 : ROADWORKS

B0520, THE SQUARE, COALISLAND - Road closure, B0520, THE SQUARE, COALISLAND

Road ClosureRoadworks will operate from Sun 29th Nov 2026 to Sun 29th Nov 2026.
Continuously from first day / last day on following times:-
18:00-18:30Reason: Coalisland Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: B0520 THE SQUARE, B0520 LINESIDE, B0520 STEWARTSTOWN ROADDiversion 2:

29/09/2026 14:00:00 : ROADWORKS

U7538, MARKET SQUARE, DUNGANNON - Road closure, U7538, MARKET SQUARE, DUNGANNON

Market Sq Thomas St Rd ClosureRoadworks will operate from Sat 28th Nov 2026 to Sat 28th Nov 2026.
Continuously from first day / last day on following times:-
17:45 - 21:00Reason: Dungannon Christmas Lights
Diversion in place.

Alternative Route Via:
Diversion 1: U7539 SCOTCH STREET, U7540 GEORGES STREET, U7541 WILLIAM STREET, U7512 GREERS ROADDiversion 2: U7512 GREERS ROAD, U7542 IRISH STREET

29/09/2026 14:00:00 : ROADWORKS

A0026, BALLYMENA ROAD, ANTRIM - Lane closure, A0026, BALLYMENA ROAD, ANTRIM

Stiles Way Roundabout, AntrimRoadworks will operate from 09:30 on Sun 23rd Aug 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Active travel cycleway construction and Installation of toucan crossings

29/09/2026 14:00:00 : ROADWORKS BELFAST

U0624, MUSIC HALL LANE, BELFAST - Road closure, U0624, MUSIC HALL LANE, BELFAST

Music hall lane from upper arthur street to montgoRoadworks will operate from Fri 21st Aug 2026 to Sat 21st Aug 2027.
Continuously from first day / last day on following times:-
ContinuousReason: Scaffolding in carriageway as per agreement with Belfast North section office
Diversion in place.

Alternative Route Via:
Diversion 1: U0624 UPPER ARTHUR STREET, A0020 CHICHESTER STREET, U0624 MONTGOMERY STREET, U0624 MUSIC HALL LANE

29/09/2026 14:00:00 : ROADWORKS

U0060, BALLYCORR ROAD, BALLYCLARE - Road closure, U0060, BALLYCORR ROAD, BALLYCLARE

Road ClosureRoadworks will operate from 09:00 on Mon 31st Aug 2026 to 17:00 on Fri 20th Nov 2026.
Reason: Resurfacing works
Diversion in place.

Alternative Route Via:
Diversion 1: C0037 BALLYEASTON ROAD, C0037 BALLYEASTON VILLAGE, C0037 LOWER BALLYBOLEY ROAD, C0037 CHURCH ROAD

29/09/2026 14:00:00 : ROADWORKS

B0518, STILES WAY, ANTRIM - Lane closure, B0518, STILES WAY, ANTRIM

Roadworks will operate from 09:30 on Mon 3rd Aug 2026 to 16:30 on Fri 11th Dec 2026.
Reason: Active travel cycle way construction

29/09/2026 14:00:00 : ROADWORKS

A0514, CRESCENT LINK, LONDONDERRY - Road closure, A0514, CRESCENT LINK, LONDONDERRY

Roadworks will operate from Mon 29th Jun 2026 to Thu 31st Dec 2026.
Continuously from first day / last day on following times:-
This is Footpath closure only.
From 08:00 on the 29th June to 17:00 on the 31st DecemberReason: Crescent Link Southbound Footpath Closure between Caw Roundabout and temporary footpath to Rosses Gate for a distance of 210 metres
Diversion in place.

Alternative Route Via:
Diversion 1: A1002 CLOONEY ROAD, A0514 CRESCENT LINK

29/09/2026 14:00:00 : ROADWORKS

U4000, CASTLE STREET, STRABANE - Road closure, U4000, CASTLE STREET, STRABANE

Castle Street ClosureRoadworks will operate from Mon 1st Feb 2027 to Fri 2nd Jul 2027.
Continuously from first day / last day on following times:-
The Carriageway will remain open during Footway construction works. It is planned to start the Carriageway April 2027, and from this point there will be no vehicular access. Pedestrian access will be maintained at all times.Reason: Road closure will be implemented on Castle Street as part of the Strabane Public Realm Scheme.
Diversion in place.

Alternative Route Via:
Diversion 1: U4000 CASTLE PLACE, B0072 ABERCORN SQUAREDiversion 2: U4000 CASTLE PLACE, B0072 ABERCORN SQUARE

29/09/2026 14:00:00 : ROADWORKS

U4085, RIVERDALE, LARNE - Road closure, U4085, RIVERDALE, LARNE

Roadworks will operate from Mon 29th Jun 2026 to Fri 4th Jun 2027.
Continuously from first day / last day on following times:-
Mon 29 Jun 2026 : 08:00 Date End Fri 04 Jun 2027 17:00 : Continuous Closure.
Do restrictions permit access to emergency vehicles? : Yes
Additional details : Demolition of Tower Block.
Diversion Route : U4085 RIVERDALE, U4085 HIGH STREET, U4105 POUND STREET.
Additional TTR Information : Continuously Closed for 52 weeks (1 year) Advance Notice Boards to be put in place.Reason: Demolition of Tower Block
Diversion in place.

Alternative Route Via:
Diversion 1: U4085 RIVERDALE, U4085 HIGH STREET, U4105 POUND STREET

29/09/2026 14:00:00 : ROADWORKS

A0046, LOUGH SHORE ROAD, DRUMBADREEVAGH - Lane closure, A0046, LOUGH SHORE ROAD, DRUMBADREEVAGH

Roadworks will operate from Mon 13th Jul 2026 to Fri 27th Nov 2026.
Continuously from first day / last day on following times:-
New watermains installation on behalf of NI WaterReason: New watermains installation on behalf of NI Water

29/09/2026 14:00:00 : ROADWORKS

U1556, PUMP STREET, LONDONDERRY - Road closure, U1556, PUMP STREET, LONDONDERRY

closureRoadworks will operate from Thu 14th May 2026 to Tue 17th Nov 2026.
Continuously from first day / last day on following times:-
Property Owner/Contractor to consult and update businesses along Pump Street.Reason: The road is partially closed due to container structures installed to support anunstable building and ensure public safety while permanent stabilisat
Diversion in place.

Alternative Route Via:
Diversion 1: C0578 FERRYQUAY STREET, C0578 THE DIAMOND, C0578 BISHOP STREET WITHIN, U1556 LONDON STREET, U1556 HAWKIN STREET, U1556 HORACE STREET, C0578 CARLISLE ROAD

29/09/2026 14:00:00 : ROADWORKS

U1386, LEGAHORY CENTRE, CRAIGAVON - Lane closure, U1386, LEGAHORY CENTRE, CRAIGAVON

Footpath ClosureRoadworks will operate from Thu 2nd Apr 2026 to Mon 30th Nov 2026.
Continuously from first day / last day on following times:-
Footpath closure only. Pedestrian diversion as per plan.
Approved JL 02-04-2026 [TTM] must be maintained when children are entering and leaving the school.Reason: Footpath closure only to facilitate construction of a new two storey extension at Brownlow Health Centre

29/09/2026 14:00:00 : ROADWORKS

B0507, ABERCORN ROAD, LONDONDERRY - 15 min Obstruction, B0507, ABERCORN ROAD, LONDONDERRY

New Access areaRoadworks will operate as follows:-
09.30 - 14.30 ad hoc when rush hour is over

To gain access to top of site for lorries

1 worker each side of traffic carrying out lollipop style traffic controls. Reason: Site Access for material off loading.

15/09/2026 09:00:00 : ROADWORKS

A0040, FOYLE ROAD, LONDONDERRY - Lane closure, A0040, FOYLE ROAD, LONDONDERRY

Roadworks will operate from 09:30 on Mon 10th Nov 2025 to 16:30 on Tue 10th Aug 2027.
Reason: Site deliveries and concrete pump

15/09/2026 09:00:00 : ROADWORKS

U5501, SHAMBLE LANE, NEWTOWNHAMILTON - One Way closure, U5501, SHAMBLE LANE, NEWTOWNHAMILTON

Roadworks will operate from 00:00 on Mon 8th Dec 2025 to 23:59 on Sun 6th Dec 2026.
Reason: Fencing Works - One Way Road Closure

15/09/2026 09:00:00 : ROADWORKS

A0002, NEWRY ROAD, WARRENPOINT - Lane closure, A0002, NEWRY ROAD, WARRENPOINT

Lane ClosureRoadworks will operate from 00:00 on Fri 24th May 2024 to 23:59 on Fri 21st May 2027.
Reason: Construction of Access Road to Narrow Water Bridge

15/09/2026 09:00:00 : ROADWORKS

C0163, COHARRA ROAD, PORTADOWN - Road closure, C0163, COHARRA ROAD, PORTADOWN

Road Closure Roadworks will operate from 09:30 on Wed 13th Mar 2024 to 16:30 on Wed 13th Mar 3202.
Reason: NIE Works

08/09/2026 15:46:00 : ROADWORKS

U1027, Creenagh Bridge Road, Dungannon, - Road Closure, U1027, Creenagh Bridge Road, Dungannon

Road closure required to facilitate work by GRAHAM
Reason for closure: new main replacement
Closure to operate: This will be operational Continuous other from Mon 21 Sep 2026 to: Fri 11 Dec 2026. Diversion to operate, delays expected.
Alternative Route Via: Diversion 1: B0106 BUSH ROAD, A0045 COALISLAND ROAD, U7675 BALLYNAKILLY ROAD, A0045 BALLYNAKILLY ROAD Notes: SCHOOL BUSES TO BE GRANTED ACCESS.
Permit is approved on the condition that the letter drop to residents is carried out asap. Start 8am 21st Sept Finish 5pm 11th Dec
The anticipated delay will be Less than 5 minutes

04/09/2026 11:50:00 : ROADWORKS

C0625, Old Mountfield Road, Omagh, - Lane Closure, C0625, Old Mountfield Road, Omagh

Lane Closure required to facilitate work by John McQuillan Contracts
Reason for closure: DFI Gortin Road Scheme
Closure to operate: This will be operational Continuous other from Mon 31 Aug 2026 to: Fri 01 Jan 2027. Traffic control to operate, delays expected.
The anticipated delay will be 5-10 minutes

04/09/2026 11:43:00 : ROADWORKS

B0048, Gortin Road, Omagh, - Lane Closure, B0048, Gortin Road, Omagh

Lane Closure required to facilitate work by John McQuillan Contracts
Reason for closure: DFI Gortin Road Scheme
Closure to operate: This will be operational Continuous other from Mon 31 Aug 2026 to: Fri 01 Jan 2027. Traffic control to operate, delays expected.
The anticipated delay will be over 15 minutes

04/09/2026 11:35:00 : ROADWORKS

U1528, Strathroy Road, Omagh, - Lane Closure, U1528, Strathroy Road, Omagh

Lane Closure required to facilitate work by John McQuillan Contracts
Reason for closure: DFI Gortin Road Scheme
Closure to operate: This will be operational Continuous other from Mon 31 Aug 2026 to: Fri 01 Jan 2027. Traffic control to operate, delays expected.
The anticipated delay will be 5-10 minutes

25/08/2026 11:17:00 : ROADWORKS

U0060, Ballycorr Road, Ballyclare, - Road Closure, U0060, Ballycorr Road, Ballyclare

Road Closure required for resurfacing works.
Closure to operate: Daily Diversion to operate, delays expected.
Alternative Route Via: C0037 BALLYEASTON ROAD, C0037 BALLYEASTON VILLAGE, C0037 LOWER BALLYBOLEY ROAD, C0037 CHURCH ROAD

18/08/2026 17:10:00 : ROADWORKS

A0026, Ballymena Road, Antrim, - Lane Closure, A0026, Ballymena Road, Antrim

Lane Closure required For Active travel cycleway construction and Installation of toucan crossings.
Closure to operate: Daily. Traffic control to operate, delays expected.


10/08/2026 11:45:00 : ROADWORKS

B0520, Main Street, Dungannon, - Road Closure, B0520, Main Street, Dungannon

Road closure required to facilitate work by Mid Ulster District Council
Closure to operate: This will be operational Continuous other from Sun 29 Nov 2026 to: Sun 29 Nov 2026. Diversion to operate, delays expected.
Alternative Route Via: Diversion 1: B0520 THE SQUARE, B0520 LINESIDE, B0520 STEWARTSTOWN ROAD

03/07/2026 09:57:00 : ROADWORKS

U4085, Riverdale, Larne, - Road Closure, U4085, Riverdale, Larne

Road closure required for demolition of a tower block.
Closure to operate: Continuously  Diversion to operate, delays expected.
Alternative Route Via: U4085 RIVERDALE, U4085 HIGH STREET, U4105 POUND STREET.

02/07/2026 14:30:00 : ROADWORKS

A0046, Lough Shore Road, Enniskillen, - Lane Closure, A0046, Lough Shore Road, Enniskillen



Lane Closure required to facilitate work by NI Water CapitalReason for closure: New watermains installation on behalf of NI Water
Closure to operate: Mon 13 Jul 2026 to: Fri 27 Nov 2026. Traffic control to operate, delays expected.The anticipated delay will be 5 - 15 minutes


18/06/2026 11:10:00 : ROADWORKS

A514, Crescent link, Londonderry, - Road Closure, A514, Crescent link, Londonderry

There will be a Road closure from Caw Roundabout to Sperrin Park.
This will be operational Continuous other from Mon 29 Jun 2026 to: Thu 31 Dec 2026.
The closure is to facilitate work by NI Water Capital
Reason for closure: Crescent Link Southbound Footpath Closure between Caw Roundabout andtemporary footpath to Rosses Gate for a distance of 210 metres
The anticipated delay will be Less than 5 minutes
An alternative route will be signed with traffic being diverted via:Diversion 1: A1002 CLOONEY ROAD, A0514 CRESCENT LINK
Notes:This is Footpath closure only.From 08:00 on the 29th June to 17:00 on the 31st December

21/05/2026 12:04:00 : ROADWORKS

U1556, Pump Street, Londonderry, - Road Closure, U1556, Pump Street, Londonderry


Road closure required to facilitate work by Aaron Kelly, Hollandale Projects Ltd - The road is partially closed due to container structures installed to support an unstable building and ensure public safety while permanent stabilisation.
Closure to operate: Continuous other from Thu 14 May 2026 to: Tue 17 Nov 2026. Diversion to operate, delays expected.
Alternative Route Via: Diversion 1: C0578 FERRYQUAY STREET, C0578 THE DIAMOND, C0578 BISHOP STREET WITHIN, U1556 LONDON STREET, U1556 HAWKIN STREET, U1556 HORACE STREET, C0578 CARLISLE ROAD.
Notes:Property Owner/Contractor to consult and update businesses along Pump Street.

02/04/2026 10:55:00 : ROADWORKS

U1386, Legahory Court, Craigavon, - Footway Closure, U1386, Legahory Court, Craigavon

Footway closure outside Brownlow Health Centre.
This will be operational continuously from Thu 02 Apr 2026 to Mon 30 Nov 2026.
The closure is to facilitate work by CivCo Ltd
Reason for closure: To facilitate construction of a new two story extension at Brownlow Health Centre
The anticipated delay will be less than five minutes

30/03/2026 15:23:00 : ROADWORKS

U4469, Meeting House Road, Banbridge, - Road Closure, U4469, Meeting House Road, Banbridge

Road closure from Linnenhall Street to Scarva Street.
This will be operational continuously from Mon 30 Mar 2026 to Thu 30 Sep 2027.
The closure is to facilitate work by Arbour Housing
Reason for closure: To facilitate construction of social housing.
The anticipated delay will be less than five minutes.
An alternative route will be signed with traffic being diverted via: Diversion 1: C0351 Linenhall Street, U4469 Commercial Road, B0010 Scarva Street.

03/02/2026 11:47:00 : ROADWORKS

B0507, Abercorn Road, Londonderry, - 15 min Obstruction, B0507, Abercorn Road, Londonderry



Lane Closure required to facilitate work by Hugh J O' Boyle
Closure to operate: Mon 09 Feb 2026 to: Tue 31 Aug 2027. Traffic control to operate, delays expected. The anticipated delay will be 5 - 15 minutes

28/01/2026 10:31:00 : ROADWORKS

U0337, Lisnawery Road, Augher, - Road Closure, U0337, Lisnawery Road, Augher


Road closure due to Flooding Diversion to operate, Delays expected.
Section Office Location Mid Ulster South Date 27.01.26 Time 15:00 Prepared by Lesley Maxwell Contact details 07717732658


28/01/2026 10:20:00 : ROADWORKS

B83, Ballymagowan Road, Clogher, - Road Closure, B83, Ballymagowan Road, Clogher


Road closure due to Flooding Diversion in Place
Section Office Location Mid Ulster South Date 27.01.26 Time 15:00
Prepared by Lesley Maxwell Contact details 07717732658

04/11/2025 13:52:00 : ROADWORKS

A0040, Foyle Road, Londonderry, - Lane Closure, A0040, Foyle Road, Londonderry



Lane Closure required to  facilitate work by Hj o Boyle
Closure to operate: Daily 09:30 to 16:30 from Mon 10 Nov 2025 to: Tue 10 Aug 2027 Traffic control to operate, delays expected.


29/09/2025 09:03:00 : ROADWORKS

U5501, Shamble Lane, Newtownhamilton, - Road Closure, U5501, Shamble Lane, Newtownhamilton

Road closure required to facilitate work by R Heatrick Ltd.
Closure to operate: From 08:00 on Monday 08 December 2025 to 18:00 on Sunday 06 December 2026. Diversion in place, delays expected.