28/05/2003
Network Rail posts £290m losses
Network Rail, the parent company of the body which runs the rail infrastructure, formerly run by Railtrack, has posted a loss of £290 million in its preliminary results for the year to March 31 – compared with a £295 million profit in the previous year.
The results published reflect the company’s performance in the six months since the administration period following the demise of Railtrack was ended. Network Rail's Chairman, Ian McAllister, said that the results reflected a year of significant change and major progress but "much remains to be done".
The Chairman added: "We are being realistic about the challenges we face. Substantial growth on the network allied to a history of under investment has left us with a fragile network which is expensive to put right. Improving performance and reducing total cost must be our focus but we must also work with our contractors to make up the significant backlog in renewals."
Train delays were up 9% at 14.7 million minutes from 13.4 million as the company set about a huge maintenance drive in the wake of the Potters Bar accident in May 2002 in which seven people were killed.
As a result of the maintenance spend – increased by 33% at £1.2 billion from £0.9 billion repair – Network Rail reported that instances of broken rails had been reduced by 17% to their lowest-ever recorded at 445 (down from 534).
Signals passed at danger were down 7% at 405 from 434 and serious breaches were down 14% – again lowest-ever recorded
Mr McAllister added: "It was a year in which the first steps were taken to address the difficulties of the past. It will take several years, but our goal is to build a rail infrastructure which will demonstrate sustainable improvement in performance at an acceptable cost to the nation."
(GMcG)
The results published reflect the company’s performance in the six months since the administration period following the demise of Railtrack was ended. Network Rail's Chairman, Ian McAllister, said that the results reflected a year of significant change and major progress but "much remains to be done".
The Chairman added: "We are being realistic about the challenges we face. Substantial growth on the network allied to a history of under investment has left us with a fragile network which is expensive to put right. Improving performance and reducing total cost must be our focus but we must also work with our contractors to make up the significant backlog in renewals."
Train delays were up 9% at 14.7 million minutes from 13.4 million as the company set about a huge maintenance drive in the wake of the Potters Bar accident in May 2002 in which seven people were killed.
As a result of the maintenance spend – increased by 33% at £1.2 billion from £0.9 billion repair – Network Rail reported that instances of broken rails had been reduced by 17% to their lowest-ever recorded at 445 (down from 534).
Signals passed at danger were down 7% at 405 from 434 and serious breaches were down 14% – again lowest-ever recorded
Mr McAllister added: "It was a year in which the first steps were taken to address the difficulties of the past. It will take several years, but our goal is to build a rail infrastructure which will demonstrate sustainable improvement in performance at an acceptable cost to the nation."
(GMcG)
Related UK National News Stories
Click here for the latest headlines.
13 January 2012
Legal Action Taken Over Cumbrian Rail Crash
It has been revealed that Network rail is to be prosecuted over the Cumbrian rail crash back in 2007, which claimed one life. The rail regulation body, The Office of Rail Regulation (ORR) has said that they have started legal proceedings against Network Rail for a breach of health and safety law.
Legal Action Taken Over Cumbrian Rail Crash
It has been revealed that Network rail is to be prosecuted over the Cumbrian rail crash back in 2007, which claimed one life. The rail regulation body, The Office of Rail Regulation (ORR) has said that they have started legal proceedings against Network Rail for a breach of health and safety law.
08 November 2011
High Speed Rail Network Gets Backing
A government committee has announced that a high-speed rail link between London and Birmingham has a "good case". The announcement comes after the Government carried out a public consultation on the proposal and the recommended route for an initial high-speed line from London to the West Midlands.
High Speed Rail Network Gets Backing
A government committee has announced that a high-speed rail link between London and Birmingham has a "good case". The announcement comes after the Government carried out a public consultation on the proposal and the recommended route for an initial high-speed line from London to the West Midlands.
09 October 2008
Scottish Rail Strike Suspended
Scottish rail services are expected to return to normal after talks between Network Rail and the Rail Maritime and Transport (RMT) union lead to a suspension of the 24-hour strike scheduled for noon.
Scottish Rail Strike Suspended
Scottish rail services are expected to return to normal after talks between Network Rail and the Rail Maritime and Transport (RMT) union lead to a suspension of the 24-hour strike scheduled for noon.
27 April 2004
Firms accept liability for Potters Bar rail crash
In a joint statement made today Network Rail and Jarvis plc have formally accepted liability for the 2002 Potters Bar rail crash. Network Rail and Jarvis said they hoped that by "formalising the liability issue, those affected by the tragedy will gain some level of comfort and assistance".
Firms accept liability for Potters Bar rail crash
In a joint statement made today Network Rail and Jarvis plc have formally accepted liability for the 2002 Potters Bar rail crash. Network Rail and Jarvis said they hoped that by "formalising the liability issue, those affected by the tragedy will gain some level of comfort and assistance".
24 October 2003
'Fundamental review' sees rail maintenance brought in-house
Network Rail has announced that it is to bring rail maintenance activity back in-house, and so unify the operation and maintenance of Britain's rail infrastructure. Today’s announcement represents the "most fundamental restructuring" of Britain’s railway since British Rail was reorganised in 1994, two years before privatisation.
'Fundamental review' sees rail maintenance brought in-house
Network Rail has announced that it is to bring rail maintenance activity back in-house, and so unify the operation and maintenance of Britain's rail infrastructure. Today’s announcement represents the "most fundamental restructuring" of Britain’s railway since British Rail was reorganised in 1994, two years before privatisation.
-
Northern Ireland WeatherToday:A showery start with outbreaks most frequent north of Lough Neagh and through the morning, before dwindling during the afternoon as the northwest breezes ease and brighter spells of weak sunshine prosper. Maximum temperature 8 °C.Tonight:A dry night, save for a few light showers around the coasts, with prolonged clear spells and light winds bringing a frosty dawn for many in central and southern parts. Minimum temperature -3 °C.