25/06/2024
Geotechnical Investigations Begin On River Lagan
Geotechnical investigations have started at the River Lagan for the proposed Lagan Pedestrian and Cycle Bridge.
These investigations involve drilling bore holes into the river bed to determine the substrate's composition beneath. This crucial information will guide the design and construction of the project before proceeding further.
Infrastructure Minister, John O'Dowd said: "I welcome the commencement of these preliminary works as the procurement process for the £24.5m bridge work is continuing. Connecting people and opportunities through our infrastructure is a key goal for me and, once completed, this bridge will improve linkages between communities from both sides of the River Lagan, improving accessibility to the city centre and encouraging more people to make their journeys by walking and cycling."
Belfast Lord Mayor, Councillor Micky Murray said: "It's great to see the Lagan Pedestrian and Cycle Bridge progressing as part of the Belfast Region City Deal programme of investment. As part of our Bolder Vision for Belfast, we’re keen to improve connectivity and accessibility and this pedestrian and cycle bridge over the River Lagan will connect south and east Belfast to the city centre, offering workers and visitors a quicker route between the city centre and Ormeau Park. It’s going to improve safety for pedestrians and cyclists, encourage a shift to sustainable transport modes and help promote an active lifestyle.
"The bridge will also encourage us to appreciate our waterfront, the River Lagan and the wildlife and open space it offers. I’m looking forward to seeing the potential new tourism, regeneration and development opportunities it unlocks."
During the work there will be a barge with drilling rig equipment on board and with support vessels on the river. River users are advised to exercise caution in the vicinity of the works which are expected to continue for approximately three weeks. The towpath will remain open for pedestrians and cyclists.
These investigations involve drilling bore holes into the river bed to determine the substrate's composition beneath. This crucial information will guide the design and construction of the project before proceeding further.
Infrastructure Minister, John O'Dowd said: "I welcome the commencement of these preliminary works as the procurement process for the £24.5m bridge work is continuing. Connecting people and opportunities through our infrastructure is a key goal for me and, once completed, this bridge will improve linkages between communities from both sides of the River Lagan, improving accessibility to the city centre and encouraging more people to make their journeys by walking and cycling."
Belfast Lord Mayor, Councillor Micky Murray said: "It's great to see the Lagan Pedestrian and Cycle Bridge progressing as part of the Belfast Region City Deal programme of investment. As part of our Bolder Vision for Belfast, we’re keen to improve connectivity and accessibility and this pedestrian and cycle bridge over the River Lagan will connect south and east Belfast to the city centre, offering workers and visitors a quicker route between the city centre and Ormeau Park. It’s going to improve safety for pedestrians and cyclists, encourage a shift to sustainable transport modes and help promote an active lifestyle.
"The bridge will also encourage us to appreciate our waterfront, the River Lagan and the wildlife and open space it offers. I’m looking forward to seeing the potential new tourism, regeneration and development opportunities it unlocks."
During the work there will be a barge with drilling rig equipment on board and with support vessels on the river. River users are advised to exercise caution in the vicinity of the works which are expected to continue for approximately three weeks. The towpath will remain open for pedestrians and cyclists.
Related Northern Ireland News Stories
Click here for the latest headlines.
18 November 2024
Belfast's Vacant To Vibrant Scheme To Expand Citywide
A successful scheme aimed at transforming vacant properties in Belfast city centre into thriving businesses is set to be extended across the entire city. Belfast City Council's Vacant to Vibrant programme has already breathed new life into 26 properties, with another six sites in the pipeline.
Belfast's Vacant To Vibrant Scheme To Expand Citywide
A successful scheme aimed at transforming vacant properties in Belfast city centre into thriving businesses is set to be extended across the entire city. Belfast City Council's Vacant to Vibrant programme has already breathed new life into 26 properties, with another six sites in the pipeline.
17 September 2019
Body Recovered From River Lagan
Police are investigating after a woman's body was discovered in the River Lagan. The body was found in the Shaw's Bridge area on Monday afternoon, 16 September. The death is not being treated as suspicious at this stage. A post-mortem examination will be carried out in due course.
Body Recovered From River Lagan
Police are investigating after a woman's body was discovered in the River Lagan. The body was found in the Shaw's Bridge area on Monday afternoon, 16 September. The death is not being treated as suspicious at this stage. A post-mortem examination will be carried out in due course.
27 November 2024
Belfast City Centre Regeneration Expert Returns To Assess Progress
Urban planning expert Joe Berridge has returned to Belfast to evaluate the progress made in the city centre since the publication of the Belfast City Centre Regeneration and Investment Strategy (BCCRIS) in 2015.
Belfast City Centre Regeneration Expert Returns To Assess Progress
Urban planning expert Joe Berridge has returned to Belfast to evaluate the progress made in the city centre since the publication of the Belfast City Centre Regeneration and Investment Strategy (BCCRIS) in 2015.
17 September 2021
New Lagan Gateway Bridge Opens
A new pedestrian and cyclist bridge connecting Lagan Towpath to Annadale Embankment at Stranmillis in Belfast has opened. The 83-metre bridge is one of the key elements of the £5.2 million Lagan Gateway project.
New Lagan Gateway Bridge Opens
A new pedestrian and cyclist bridge connecting Lagan Towpath to Annadale Embankment at Stranmillis in Belfast has opened. The 83-metre bridge is one of the key elements of the £5.2 million Lagan Gateway project.
25 November 2024
DfI Outlines Congestion Mitigation Measures In Belfast City Centre
The Department for Infrastructure (DfI) has announced a series of measures aimed at alleviating traffic congestion in Belfast City Centre. A strategic oversight group, comprising the DfI, Belfast City Council, PSNI, and Translink, has been formed to identify and implement effective solutions to reduce peak-time delays.
DfI Outlines Congestion Mitigation Measures In Belfast City Centre
The Department for Infrastructure (DfI) has announced a series of measures aimed at alleviating traffic congestion in Belfast City Centre. A strategic oversight group, comprising the DfI, Belfast City Council, PSNI, and Translink, has been formed to identify and implement effective solutions to reduce peak-time delays.